HomeMy WebLinkAboutGREENBRIAR VILLAGE PUD THIRD - Filed CS-COMMENT SHEETS - 2004-08-06PROJECT
COMMENT SKEET
City of Fort Collins
Current Plannim
DATE: 11/18/96 DEPARTWNT:Engineering
PROJECT: Greenbriar Village, 3rd Filing
Wetland Ponds
PLANNER: Steve Olt
All comments must be received by: 12/9/96
❑ �No Problems
LLB Problems or Concerns (see below or attached)
I. S r�e uJ i, I �G �- �i¢r- ,t�✓aN 5' Try ^ jr a h'4 :k S f r-,
L O rytec.% Qvrt-e-u M.�ar- ffr-�G/'!/i l
5�-%(rt-e.-G / r1r�c.i+
,2. (: l /!/L T.S 74o/L-M �BG�" �„%-� C�✓OtJ rj L o NU
Gv/ f.% ro� Pf S� �Gc./.n l� � G A- /�� y- C
4o �G-iI✓la�P/ /OGR'�/w
Si�%uJA-/165 @ •4 S/.Oe B7" a % Oe S
�eT�� �^' �o✓c-r S/��y PcL �" w/ Revs S�� fD�.4*.r zle-�'
Date: / / — "?7 -74 Signature:
CHECK IF YOU WISH TO RECEIVE ❑ PLAT
COPIES OF REVISIONS ❑ SITE
❑ LANDSCAPE
[j--I"TILITY
utu -
City of Fort Collins
Current Planning
DATE: 11/18/96
PROJECT
COMMENT SHEET
DEPARTMENT: PSCo
PROJECT: Greenbriar Village, 3rd Filing
Wetland Ponds
PLANNER: Steve Olt
All comments must be received by: 12/9/96
❑ No Problems
"`-Problems or Concerns (see below or attached)
WON
Date: /Z�o Signature: ��' '^^- /Z�
CHECK IF YOU WISH TO RECEIVE ❑ PLAT
COPIES OF ]REVISIONS ❑ SITE
❑ LANDSCAPE
❑ UTILITY