HomeMy WebLinkAboutGOLDEN MEADOWS BUSINESS PARK SECOND - Filed CS-COMMENT SHEETS - 2004-08-05PROJECT
COMMENT SHEET
City of Fort Collins.
Current Planning
DATE: March 12, 2003 TO: Technical Services
PROJECT: #14-03 GOLDEN MEADOWS BUSINESS PARK PDP
TYPE II (LUC) My
All comments must be received by Steve Olt no later than the staff
review meeting:
April 9, 2003
�inpwSBPZ , r+�rtP
Note - PI;EASE identify your redlines for future reference
r3oa vol-Rs' 6iej5E5,
�A, c �uYyy iS SFelle i Coro^ y
S1(_7Hi �iSNc al-j-JfS/)?EIIT
o1 F4,
1� /�l����� ��s(s
�r
AecoN0 ihJ C.SUAc:.
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report
_Utility _Redline Utility _Landscape
Z ri )U %/TCC
Number: 30 Created: 4/14/2003
Maintain 10 feet of separation between existing 36-inch water main and the proposed
flared end section on the proposed storm sewer.
Number: 31 Created: 4/14/2003
Show all proposed crossing of the storm sewer in the profile view. Show and label
required concrete encasement of storm sewer in the profile view.
See site, landscape: and utility plans for other comments.
Number: 42 Created: 4/16/2003
Abandon the existing 8-inch water main in McMurray and at the East edge of this site.
Extend water service and fire line from McMurray to the proposed building
Department: Zoning Issue Contact: Peter Barnes
Topic: zoning
Number:13 Created: 4/8/2003
Land Use note on site plan states that max. building height is 30'. However, the
elevations indicate that height is over 40'. Which is it? If over 40', then need to do
Building Height Review per Sec. 3.5.1(6).
Number: 14 Created: 4/8/2003
Per definition of "convenience shopping center", a bank is a permitted "secondary" use
in the center, and can only have limited drive -up facilities. I question whether or not
the proposed bank is a secondary use, and I don't think 3 drive -up lanes qualifies as
"limited drive -up facilities".
Number: 15 Created: 4/8/2003
Need to show building envelope dimensions and setback to McMurry.
Number: 16 Created: 4/8/2003
Building doesn't appear to comply with build -to -line standards in 3.5.3(B)(2). Building
can be no more than 15' from McMurry ROW.
Number: 17 Created: 4/8/2003
It appears that the 4' wide sidewalk connection from McMurry only serves the rear
entrances of a part of the building. What's the purpose of the walk?
Number: 18 Created: 4/8/2003
In the event that a determination is made that 3 drive -up lanes does not violate the
definition of "convenience shopping center", there does not appear to be adequate
room for stacking of vehicles.
Page 5
Number: 19 Created; 4/8/2003
The westernmost landscape island in the middle parking aisles only has 1 tree. 2 trees
are required per Sec. 3.2.1(E)(5)(b).
Number: 20 Created: 4/8/2003
Remove the ID sign from the site plan. The sign code regulates the location of the
sign, not the site plan. Especially since the location on the site plan doesn't comply
with the sign code.
Number: 21 Created: 4/8/2003
Need to list the proposed use on the site plan. The narrative explains that it's a
convenience shopping center, but the narrative doesn't get recorded. Need to state
use on the plan.
Number: 22 Created: 4/8/2003
Need 1 tree per 40' along the north lot line per Sec. 3.2.1(E)(4).
Number: 23 Created: 4/8/2003
Need ramps at handicap parking stalls.
This completes staff (and outside reviewing agencies) review and comments at this
time. Additional comments and red -lined plans are forthcoming. This proposal is
subject to the 90-day revision re -submittal requirement (from the date of this
comment letter, being April 17, 2003) as set forth in Section 2.2.11(A) of the
Land Use Code. Be sure and return all of Your red -lined plans when you re -submit. The
number of copies of each document to re -submit is shown on the attached Revisions
Routing Sheet.
If you have any questions regarding these issues or any other issues related to this
project, please feel free to call me at 221-6341.
Yours Truly,
Steve Olt,
City Planner
Page 6
Transportation Services
Engineering Department
City of Fort Collins
May 7, 2003
Mr. Michael Oberlander, PE, LSI
North Star Design
700 Automation Drive, Unit I
Windsor, CO 80550
Re: Variance request for Golden Meadows 2nd Filing - Driveway Separation
Dear Michael:
Please allow this to serve as written notice for your records that the variance request for
Golden Meadows 2nd Filing that you submitted on March 11, 2003 pertaining to the
driveway separation requirements in the Larimer County Urban Area Street Standards
was approved by the City Engineer on April 21, 2003.
Please let me know of any questions or concerns.
Sincerely, /
Marc Virata
- Civil Engineer
cc: Golden Meadows 2nd Filing project file
281 North Cullege Avenue • P.O. Box 580 • Fort CuWns, CO 80522-0580 0 (970) 221-6605 • FAX (970) 221-6378
www.fcgov.com
May 20, 2003
Steve Olt
City of Fort Collins Planning Department
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
RE: Response to comments letter, for GOLDEN MEADOWS PDP
Dear Steve,
The comments below address the issues raised by city staff regarding the Golden
Meadows Project. Please also refer to the redlines for additional responses.
Upon receiving comments from city staff, several meetings have been held to discuss
issues raised on the project. Jay Stoner, the developer, and members of the design
team have had a utility coordination meeting, a meeting with Steve Olt and Basil
Hamden, and a meeting with Peter Barnes, to resolve several issues.
Current Planning — Steve Olt:
50. A variance was granted for the intersection spacing..
51. Acknowledged.
52. Existing gas mains are shown on the plans.
53. The redline comments from current planning have been addressed. See site,
landscape, lighting and elevation plans.
Engineering — Mark Virata:
49
The retaining walls have been removed.
40
The curb return has a 25' radius — this was noted on the grading plan on the first set and a
label has been added to the utility plan.
41
The retaining walls have been removed.
45
The walk has been realigned per discussions at the utility coordination meeting.
48
The barricade requested has been added.
1
The Plat and plans have been changed from McMurray to McMurry. It should be noted that
the original Golden Meadows plat and the Safeway plat both have this called out as
McMurray.
36
The future edge of pavement is now shown and right of way is dedicated off of Harmony.
The 80' setback lies entirely within the existing 80' utility easement located on the south side
of the project.
36. Section 3.6.3(f) states, `All development plans shall provide for future public
street comlections to adjacent developable parcels by providing a local street
connection spaced at intervals not to exceed (600) feet along each development
plan boundary that abuts potentially developable or redevelopable land.' If we
add the recommended connection, we will have two connections to the eastern
parcel that are about 140' apart. This seems to exceed the standard set forth in
the code. Why does the pedestrian trail across the front of the site not satisfy this
standard?
38
The variance was approved on May 7, 2003.
39
A copy of the plat has been added.
46
The plans have been changed to Golden Meadows Second Filing.
44
The plat blocks have been revised.
47
All Technical services comments have been addressed.
43. The ROW will be dedicated at this time, the word future has been removed from
the drawing.
PFA — Michael Chavez:
32. The site has a blanket emergency access easement over it. There will also be a fire lane
through the parking lot where adjacent curbs shall be painted red and appropriate signage
utilized.
33. Acknowledged.
34. Acknowledged.
35. Acknowledged.
Police — Joseph Gordon:
26. Lighting — The lighting on the south and west sides of the building will comply with the
code regarding minimum light levels for safety. Typically, the building mounted lighting
will be determined once the tenant emergence doors have been finalized. These lights
will be cut off wall sconces or under canopy lights.
27. See above comment.
Transportation Planning — Mark Jackson:
24. The traffic study took into account the highest possible traffic generating users. At this
time, the tenants have not been determined. The Day Spa and Bank are very likely to be
tenants in this building, but nothing has been finalized.
25. The access along the south side of the building is for emergency access and primarily
employees.
Water Wastewater — Jeff Hill:
28. All existing utilities are now being shown on the landscape plans. Separation distances
h.,,p hI pn -her ed
29
Existing gas and electric are now shown. The transformer location was okayed at the UCM.
There is plenty of easement for the gas service wherever it ends up being).
30
The existing 36" waterline is immediately under the existing swale. The City (Stormwater
and Planning) is requiring that the swale be piped and this new pipe will need to daylight in
the Swale until it is extended further east. It is assumed that the Water Department is OK
with the FES location since piping the swale was acceptable at the UCM.
31
Crossing s are shown in the profiles.
42
The waterline along the site will be abandoned. When the existing services were located in
the field, it was discovered that the irrigation tap is off of the main that was to be removed
rather than out of McMurry. After discussions with Roger Buffington, it was determined to
use the 8- main for a fire line and leave the existing tap alone.
Zoning - Peter Barnes:
13. The building height listed on the site plan was incorrect. Sorry! The building is actually
over 40' high and a shadow analysis has been submitted.
14. The bank in going to be one of four or five users in this building. All of the other
potential users fall into the primary use category. Additionally, Jay Stoner has met with
Peter Barnes and Steve Olt regarding the drive thru facilities. One lane is for commercial
use, one for standard use and one for ATM use.
15. Acknowledged.
16. ROW is being dedicated along McMurray with this project. The building will comply
with the build -to -line.
17. The walk along the south side of the building is for emergency access.
18. The drive thru lane has been designed to allow two cars to be side by side at it's
narrowest point. Because of that, there should be adequate stacking.
19. All three of the parking islands contain poled mounted lights for the parking lot. On a
site this small it is difficult to find good locations for site lighting and utilities that do not
conflict with landscaping. We have selected a tree that will be 30'-35' feet high and 15'-
20' wide. This tree also has a great red fall color. We felt that this tree would be more
interesting and have fewer conflicts with the site lighting.
20. The ID signs has been removed.
21. Acknowledged.
22. See the landscape plan.
23. Acknowledged.
Stormwater - Basil Hamden:
56
The detention release has been clarified in the drainage report.
57
The swale will be piped with the revised plan- no bales are needed.
55
The swale is being removed. The proposed 36" pipe is analyzed in the report. The overflow
is onto the property to the east, but it is into a drainage easement.
_
58
We are piping the existing swale.
54
The outfall pipe has been moved west of the telephone easement. The entire lot (outside of
the building envelope) is a utility and drainage easement.
Thank you for your consideration.
Sincerely,
Rachel Linder Lee
VF Ripley Associates
REVISION
COMMENT SHEET
DATE: May 21, 2003 TO: Engineering
PROJECT: #14-03 GOLDEN MEADOWS BUSINESS PARK —
TYPE II (LUC)
All comments must be received by Steve Olt no later than the staff
review meeting:
June 11, 2003
No Comment
Problelms or Concerns (see below or attached)
"PLEASE IDENTIFY YOUR REDLINES FOR FUTURE
REFERENCE**
Name (please print)
CHECK HERE IF YOU `NISH TO RECEIVE COPIES OF REVISIONS
_Plat Site Drainage Report _Other_
_Utility _Redline Utility _Landscape
Date
6im
City of Fort Collins
DATE: May 21, 2003
REVISION
COMMENT S
TO: Technical Services
MAY 2 ti NO3
PROTECT: #14-03 GOLDEN MEADOWS BUSINESS PARK —
TYPE II (LUC) P)
All comments must be received by Steve Olt no later than the staff
review meeting:
June 11, 2003
No Comment
❑ Problems or Concerns (see below or attached)
**PLEASE IDENTIFY YOUR REDLINES FOR FUTURE
REFERENCE**
I. 3e-uNCa2Y CLOSES,
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report
_Utility _Redline Utility _Landscape
Date
Project Comments Sheet
Selected Departments
City of Fort Collins
Department: Water Wastewater
Date: June 10, 2003
Project:
GOLDEN MEADOWS BUSINESS PARK PDP -TYPE II (LUC) #14-03
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
June 11, 2003
Note - Please identify your redlines for future reference
Issue Contact: Jeff Hill
Topic: General
Number: 28 Created: 4/14/2003
As previously indicated, maintain the required landscape/utility separation distances
on the landscape plans.
Number: 60 Created: 6/10/2003
Include a note on the utility plans to Coordinate abandonment of existing water
services with the City Utilities at 221-6700.
See site, landscape and utility plans for other comments.
Issue Contact: Roger Buffington
Topic: Utility Plans
Number: 62 Created: 6/10/2003
Add water service line detail.
Signature _ Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _ Site Drainage Report Other_
Utility __ Redline Utility Landscape
Page 1
0
Citv of Fort Collins
Project Comments Sheet
Selected Departments
Department: Transportation Planning
Date: June 11, 2003
Project:
GOLDEN MEADOWS BUSINESS PARK PDP - TYPE II (LUC) #14-03
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
June 11, 2003
Note - Please identify your redlines for future reference
Issue Contact: Tom Reiff
Topic: Transportation
Number: 63 Created: 6/11 /2003
Please add an additional bike rack near the 'Plaza Area' in order to accommodate
the required 5% bike parking and serve all the centers retail tenants. (see red lines)
Number: 64 Created: 6/11 /2003
Please make sure that the existing evergreen tree along the McMurry Ave. sidewalk
does not protrude into the walk. If the tree needs to be trimmed up also keep in mind
that an 8' clearance is required from walk to the canopy.
Number: 65 Created: 6/11 /2003
According to the LIIC, section 3.2.2 (D.1) pedestrians shall be separated from
vehicles by provision of a walk. Please add a 4' walk through the median from the
back parking stalls to the bldg.'s main entrance (see red lines).
Signature Date
C4MCK HW IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other_
Utility —7_ Redline Utility andscape
ge 1
PROJECT
COMMENT SHEET
Ci of Foai Collins
Current Plannin.2
DATE: March 12, 2003 TO: Traffic Ops
PROJECT: #I`14-03 GOLDEN MEADOWS BUSINESS PARK PDP
TYPE II (LUC)
All comments must be received by Steve Olt no later than the staff
review meeting:
April 9, 2003
Note - PLEASE identi your redlines for future reference
RECEIVED
CURRENT PLANNING
-Lt C, �fx.� C7753 - 17 3
Nance (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report _Other
_Utility _Red'ineUtility _Landscape
Project Comments Sheet
Selected Departments
Department: Stormwater Utility
Date: June 12, 2003
Project:
GOLDEN MEADOWS BUSINESS PARK PDP - TYPE II (LUC) #14-03
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
June 11, 2003
Note - Please identify your redlines for future reference
Issue Contact: Basil Hamdan
Topic: Encasement Detail
Number: 77 Created: 6/12/2003
Please call out on the utility planhowt the joint of the existing manhole and the proposed ADS pipe will be joined.
Reference detail on sheet 8.
Topic: Grading Plans
Number: 55 Created: 4/17/2003
6/12/03
Provide a swale cross section for the minor swale that would drain the minor flows from the building frontage along
Harmony. Why is a grated inlet at the manhole not possible to dain flows from that swale into the pipe rather then
allowing flows to goover the pipe outlet into the swale?
Good job on addressing most of my comments. This item is ready for hearing from my perspective.
Topic: Storm 1 Profile
Number: 76 Created: 6/12/2003
Please reverse the dorection of Storm Sewer 1 profile so that the paln and profile view are in the same direction.
Topic: Utility Plans
Number: 54 Created: 4/17/2003
Please make sure that telephone company is OK with the storm sewer being in their easement.
�1
Sig at Dare
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _ Site Drainage Report Other_
Utility _1 e�Redline Utility �andscape
Page I
Project Comments Sheet
6`"" Selected Departments
City of Fort Collins
Department: Engineering
Date: June 18, 2003
Project:
GOLDEN MEADOWS BUSINESS PARK PDP - TYPE II (LUC) #14-03
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
June 11, 2003
Note - Please identify your redlines for future reference
Issue Contact: Marc Virata
Topic: General
Number: 36 Created: 4/16/2003
It doesn't appear that the ultimate design of Harmony Road (three through lanes) was accommodated into the site design.
Please use the information provided on the "Harmony Road - Lemay Avenue to 1-25 Horizontal Alignment" (C1-237) to
accommodate for the future widening, providing right-of-way dedication and establishing setbacks from future edge of
pavement. Additional right-of-way may be needed and the location of the building may need to be changed to ensure the
80' setback along the Harmony corridor.
[6/1 11 Please remove any Indication of right-of-way (14.12') being dedicated on Harmony Road. After further Internal
discussion, it was decided not to require the additional right-of-way dedication along Harmony Road due to the current
right-of-way being able to accommodate the future edge of pavement and the 80' setback Incorporating sidewalk and
landscaping. By not requiring the right-of-way dedication, issues regarding CDOT approvals are no longer needed.
Number: 46 Created: 4/17/2003
Ensure that the title to all the plans read as Golden Meadows Business Park 2nd Filing.
[6/11/031
The site, landscape (and possibly building elevations) only have the label of "Golden Meadows 2nd Filing". Because this is
the actual name of an existing filing, "Business Park" should be added.
Topic: Plat
Number: 59 Created: 6/4/2003
Provide access easements on the plat in the area where the sidewalk meanders outside of public right-of-way along
McMurry Avenue.
Signature
Date
( CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other_
=Utility _ /Redline Utility y andscape
Page I
STAFF PROJECT REVIEW
Citvot Fort Co l l in.,
VF Ripley Associate: 6/18/2003
c/o Rachel Linder Lee
401 West Mountain Avenue, Suite 200
Ft. Collins, CO. 80521
Staff has reviewed your submittal for GOLDEN MEADOWS BUSINESS PARK PUP -
TYPE II (LUC) #14-03, and we offer the following comments:
ISSUES
Department: Current Planning Issue Contact: Steve Olt
Topic: Building Elevations
Number: 74 Created: 6/12/2003
The building as shown on the Exterior Building Elevations Plan looks very good. There a
few minor comments being made on a red -lined plan that is being forwarded to you.
Topic: General
Number: 72 Created: 6/12/2003
The bank drive-thru area at the east end of the building, as shown on the Landscape
Plan, is a vehicular use area that requires a 5' landscaped setback from the lot line.
This is set forth in Section 3.2.2(J) of the LUC. Please see the copy of the red -lined
Landscape Plan being forwarded to you.
Number: 73 Created: 6/12/2003
Shade trees are required at a 40' spacing along the east property line, as shown on the
red -lined Landscape: Plan being forwarded to you.
Number: 75 Created: 6/12/2003
The proposed building is proposed to be in excess of 40' in height. The Shadow
Analysis Plan that was submitted for review, in accordance with Section 3.5.1(G) of the
LUC, would indicate that the building will not have a substantial adverse impact on
adjacent properties. However, the information needed to satisfy Sections
3.5.1(G)(1)(b)2 - a visual analysis and 3.5.1(G)(1)(b)3 - a summary of the key conclusions
of the shadow and visual analysis were not submitted. Please provide this information
to me as soon as possible.
Topic: Site Plan
Number: 66 Created: 6/12/2003
A General Note has been added regarding the requirement for access to a walk-up
ATM machine if an ATM is provided in the drive-thru area. A walk-up ATM must be
Paoe 1
clearly and distinctly separate from the drive-thru area, located on or within the
building. There now, however, are two #12 notes.
Number: 67 Created: 6/12/2003
A public access easement, behind the street right-of-way, is needed for the two
sections of sidewalk along McMurry Avenue that meander outside of the right-of-way.
The easement must be included on the subdivision plat.
Number: 68 Created: 6/12/2003
Will the existing tree (evergreen?) on the east side of the meandering sidewalk along
McMurry Avenue impede bicycle and pedestrian movement along the sidewalk? If so,
measures must be taken to ensure that this impediment does not occur.
Number: 69 Created: 6/12/2003
The bicycle rack at the northeast corner of the building must be labeled on the Site &
Landscape Plans. Also, will it accommodate the number of bicycles to satisfy the 5%
requirement set forth in Section 3.2.2(C)(4)(o) of the LUC? If not, another rack may
have to be provided at the west end of the building, near the Plaza Area.
Number: 70 Created: 6/12/2003
The Building Envelope must be dimensioned (scaled distance) from at least 2 adjacent
property lines and currently it is shown dimensioned only from the line along East
Harmony Road (the, 80' setback line). Please show a dimension from either the east or
west property line, or both.
Number: 71 Created: 6/12/2003
Per Transportation Planning's comment, please add a north - south sidewalk connection
in the island in the center of the parking lot to provide a pedestrian connection from
the north tier of parking to the front of the building. This is shown on a red -lined Site
Plan that is being forwarded to you.
Department: Engineering Issue Contact: Marc Virata
Topic: Genera/
Number:36 Created:4/16/2003
It doesn't appear that the ultimate design of Harmony Road (three through lanes) was
accommodated into the site design. Please use the information provided on the
"Harmony Road - Le:may Avenue to I-25 Horizontal Alignment" (C1-237) to
accommodate for the future widening, providing right-of-way dedication and
establishing setbacks from future edge of pavement. Additional right-of-way may be
needed and the location of the building may need to be changed to ensure the 80'
setback along the Harmony corridor.
Page 2
(6/111 Please remove any indication of right-of-way (14.12') being dedicated on
Harmony Road. After further internal discussion, it was decided not to require the
additional right-of-way dedication along Harmony Road due to the current right-of-way
being able to accommodate the future edge of pavement and the 80' setback
incorporating sidewalk and landscaping. By not requiring the right-of-way dedication,
issues regarding CDOT approvals are no longer needed.
Number: 46 Created: 4/17/2003
Ensure that the title to all the plans read as Golden Meadows Business Park 2nd Filing.
(6/11/031
The site, landscape (and possibly building elevations) only have the label of "Golden
Meadows 2nd Filing". Because this is the actual name of an existing filing, "Business
Park" should be added.
Topic: P/at
Number: 59 Created: 6/4/2003
Provide access easements on the plat in the area where the sidewalk meanders outside
of public right-of-way along McMurry Avenue.
Department: Natural Resources Issue Contact: Doug Moore
Topic: Genera/
Number: 79 Created: 6/16/2003
Tree Protection 5tandards need to be followed to protected the existing tree. 3.2.1(F)
Utility Plans need to include trees protection notes and detail. Contact the City
Forester for this information.
Department: Police Issue Contact: Joseph Gerdom
Topic: Encasement Detail
Number: 78 Created: 6/12/2003
Comment letter indicates lighting issue will be resolved by emergency door location - do
we know what the photometrics will be for the fixture proposed for these doors - will
it provide 0.7fc e 30feet?
Department: Stormwater Utility Issue Contact: Basil Hamdan
Topic: Encasement Detail
Number: 77 Created: 6/12/2003
Please call out on the utility plans how the joint of the existing manhole and the
proposed ADS pipe will be joined. Reference detail on sheet 8.
Page 3
Topic: 6roding Pans
Number: 55 Created: 4/17/2003
6/12/03
Provide a swale cross section for the minor swale that would drain the minor flows
from the building frontage along Harmony. Why is a grated inlet at the manhole not
possible to drain flows from that Swale into the pipe rather then allowing flows to go
over the pipe outlet into the Swale?
Good job on addressing most of my comments. This item is ready for hearing from my
perspective.
Topic: Storm 1 Profile
Number: 76 Created: 6/12/2003
Please reverse the direction of Storm Sewer 1 profile so that the plan and profile
views are in the same direction.
Topic: Utility Plans
Number: 54 Created: 4/17/2003
Please make sure that telephone company (US West or Qwest) is OK with the storm
sewer being in their easement.
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: Transportation
Number: 63 Created: 6/11/2003
Please add an additional bike rack near the 'Plaza Area' in order to accommodate the
required 5% bike parking and serve all the centers retail tenants. (see red lines)
Number: 64 Created: 6/11/2003
Please make sure that the existing evergreen tree along the McMurry Ave. sidewalk
does not protrude into the walk. If the tree needs to be trimmed up also keep in mind
that an 8' clearance is required from walk to the canopy.
Number: 65 Created: 6/11/2003
According to the LUC, section 3.2.2 (D.1) pedestrians shall be separated from vehicles
by provision of a walk. Please add a 4' walk through the median from the back parking
stalls to the bldg.':s main entrance (see red lines).
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: General
Number: 28 Created: 4/14/2003
As previously indicated, maintain the required landscape/utility separation distances on
the landscape plant.
Page 4
Number: 60 Created: 6/10/2003
Include a note on the utility plans to Coordinate abandonment of existing water
services with the City Utilities at 221-6700.
See site, landscape and utility plans for other comments.
Department: Water Wastewater Issue Contact: Roger Buffington
Topic: Utility Plans
Number: 62 Created: 6/10/2003
Add water service line detail.
Department: Zoning Issue Contact: Peter Barnes
Topic: zoning
Number: 15 Created: 4/8/2003
REPEAT COMMENT: Need to show building envelope dimensions and setback to
McMurry. Their response letter states that the revised site plan shows the building
envelope dimensions. However I don't see them.
Number: 18 Created: 4/8/2003
REPEAT COMMENT: The way the drive -up is configured, I don't see how the stacking
can accommodate more than 1 vehicle for 3 drive -up "windows". I don't believe that's
acceptable. Original comment: In the event that a determination is made that 3
drive -up lanes does not violate the definition of "convenience shopping center", there
does not appear to be adequate room for stacking of vehicles.
There are several significant comments that must be addressed prior to this item
going to a Planning and Zoning Board public hearing. Another round of review may be
necessary; however, it is possible that this item could be scheduled for either a July
17'h or August 71h public hearing if the main issues can be resolved quickly. If another
round of review is going to be done then the proposal is subject to the 90-day
revision re -submittal requirement (from the date of this comment letter, being
June 18, 2003) as set forth in Section 2.2.11(A) of the Land Use Code. Be sure
and return all of your red -lined plans when You re -submit The number of copies of
each document to re -submit is shown on the attached Revisions Routing Sheet.
If you have any questions regarding these issues or any other issues related to this
project, please feel free to call me at 221-6341.
Your Truly,
Steve Olt,
City Planner
Page 5
cc: Marc Virata
Tom Reiff
Basil Hamdan
Jeff Hill
Stoner and Company
North Star Design
Current Planning File #14-03
Page 6
July 21, 2003
Steve Olt
City of Fort Collins Planning Department
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
RE: Response to comments letter, for GOLDEN MEADOWS PDP
Dear Steve,
Based on the meeting that you and I had on July 8, 2003, we have chosen to route the
submittal for one last expedited review, prior to our P&Z hearing on August 21. Our goal
in doing this is to be able to submit mylars immediately following the heating. It is our
hope that staff can review the minor site changes and discuss the project in about two
weeks. Please refer to the following responses to staff comments for any clarification.
We have routed copies of the plans to:
Basil Hamdan — Stormwater
Jeff Hill — Water Wastewater
Mark Virata — Engineering
Peter Barnes — Zoning
Steve Olt — Current Planning
Current Planning — Steve Olt:
74. Refer to the building elevations for revisions. Areas noted without poche' and
questions regarding lack of banding are accent brick masonry. These areas have been
modified and accent masonry is now delineated by a different masonry poche'. Final
colors have not been selected, however, consistent with the rendering displayed at the
neighborhood meeting, we are proposing a brown or red hue field brick with a
contrasting tan brick accent.
72. Landscaping has been added in the 5' landscape setback
73. The trees have been added, but we have had to move them farther away from the
property line because of an existing easement. Additionally, we have planted the
trees in clusters, which is allowed according to the code.
75. All of the requested information regarding the shadow analysis has been added
66. There are no longer two #12 notes
67. Refer to the plat for the access easement. All land outside of the building
envelope (including the walk along Harmony) is a drainage, utility, access and
emergency access easement per the Plat.
68. That existing tree will be removed, all others will be pruned (city forester was
consulted)
69. Another bike rack was provided by the plaza area
70. Additional dimensions have been added in regards to the building envelope
71. The sidewalk connection has been added
Engineering —Mark Virata:
36. The Plat and Plans have been revised to remove any right of dedication on Harmony
Road.
46. The title to the landscape plan, site plan, and elevations has been changed.
59. All land outside of the building envelope (including the walk along Harmony) is
a drainage, utility, access and emergency access easement per the Plat.
Natural Resources — Doug Moore:
79. Tree protection notes have been added to the landscape plan and the General Note sheet
of the utility plans.
Police — Joseph Gordon:
78. Lighting — The lighting on the south and west sides of the building will comply with the
code regarding minimum light levels for safety. Typically, the building mounted or
decorative: lighting is not included on the photometric plans. These detailed lights are
designed with the building permit drawings and are considered part of the construction
document set. Rarely does the lighting consultant show decorative lights on the plan,
because the photometric plan is a macro study of the site lighting. All decorative lights
will be cut off wall sconces or under canopy lights and they will comply with the
standard of .7 fc at 30 feet.
Stormwater — Basil Hamdan:
77. The proper detail is now referenced for the field collar.
55. The minor Swale design has been added to the grading plan. It is not possible to have
this swale drain to the rim of the proposed manhole on the east because the west end of
the swalc would not be able to drain the existing tree / utility area at the intersection of
McMurry and Harmony (fill is not allowed because of the existing features).
76. The plan view has been rotated so that the plan and profile of the 36" pipe are in the
same direction.
54. The US Nest easement (along the east property line) does not have a storm sewer within
it. The 36" pipe will be in an existing drainage and utility easement and does not need
the utility company's approval.
Transportation Planning — Tom Reiff:
63. An additional bike rack has been added at the west end of the building.
64. I have coordinated with the city forester and that tree will be removed.
65. The walk has been added.
Water Wastewater — Jeff Hill:
28. Thank you for indicating the location of the conflict. The more utilities there are, the
harder it its to find all of the potential conflicts. The tree has been moved away from the
utility.
60. Abandonment note has been added.
Project Comments Sheet
1.. l Selected Departments
Citv of Fort Collins
Department: Water Wastewater
Date: April 16, 2003
Project:
GOLDEN MEADOWS BUSINESS PARK PDP - TYPE II (LUC) #14-03
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
April 09, 2003
Note - Please identify your redlines for future reference
Issue Contact: Jeff Hill
Topic: General
Number: 28 Created: 4/14/2003
Show all existing and proposed water and sewer lines on the landscape plans.
Maintain the required landscape/utility separation distances on the landscape plans.
Number: 29 Created: 4/14/2003
Show existing/proposed gas and electric mains on the overall utility plans. Maintain
4 feet minimum separation between the proposed grease trap and all gas/electric
lines.
Number: 30 Created: 4/14/2003
Maintain 10 feet of separation between existing 36-inch water main and the
proposed flared end section on the proposed storm sewer.
Number: 31 Created: 4/14/2003
Show all proposed crossing of the storm sewer in the profile view. Show and label
required concrete encasement of storm sewer in the profile view.
Number: 42 Created: 4/16/2003
Abandon the existing 8-inch water main in McMurray and at the East edge of this
site. Extend water service and fire line from McMurray to the proposed building
See site, landscape and utility plans for other comments.
/t
Signature i
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _ Site Drainage Report Other_
_ Utility _ Redline Utility Landscape
Page 1
62. Service detail has been added.
Zoning — Peter Barnes:
15. The building envelope has been dimensioned and additional dimensions have been shown
on the site plan.
18. The bank drive-thru has been reconfigured to allow for fewer lanes and less stacking.
The ATM lane has been relocated so that ATM customers do not have to wait in line to
withdraw cash. By relocating the ATM, the stacking has been reduced and drive -up
facility is smaller. Additionally, the drive-thru traffic runs in a clockwise direction as
noted on the site plan.
Thank you for your consideration.
Sincerely,
Rachel Linder Lee
VF Ripley Associates
Project Comments Sheet
Selected Departments
City of Fort COP.lins
Department: Water Wastewater
Date: July 29, 2003
Project:
GOLDEN MEADOWS BUSINESS PARK PDP - TYPE II (LUC) #14-03
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
July 30, 2003
Note - Please identify your redlines for future reference
Issue Contact: Jeff Hill
Topic: General
Number: 82 Created: 7/29/2003
No comments at this time.
�3
Signature �//, Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat __ Site Drainage Report Other_
Utility __ Redline Utility Landscape
Page 1
Project Comments Sheet
Cityof Fort Collins Selected Departments
DepartEngineering
Date: August 4, 2003
Project:
GOLDEN MEADOWS BUSINESS PARK PDP - TYPE II (LUC) #14-03
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
June 11, 2003
Note - Please identify your redlines for future reference
Issue Contact: Marc Virata
Topic: Plat
Number: 84 Created: 8/4/2003
On the plat, please add below the titles of "Engineering Certificate" and "Planning Certificate", the phrases "Approved
as to Form" and "Approved" respectively.
Topic: Utility Plans
Number: 83 Created: 8/4/2003
Please indicate street patching on McMurry where the new driveway is to be installed as it is possible that the driveway
cannot be installed without damaging the pavement, requiring street repair.
Signature Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _ Site Drainage Report Other_
Utility _ Redline Utility Landscape
Page 1
6aProject Comments Sheet
�i
Selected Departments
City of Fort Collins
Department: Engineering
Date: August 14, 2003
Project:
GOLDEN (MEADOWS BUSINESS PARK PDP - TYPE II (LUC) #14-03
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
June 11, 2003
Note - Please identify your redlines for future reference
Issue Contact: Marc Virata
Topic: Plat
Number: 84 Created: 8/4/2003
On the plat, please add below the titles of "Engineering Certificate" and "Planning Certificate", the phrases "Approved
as to Form" and "Approved" respectively.
Topic: Utility Plans
Number: 83 Created: 8/4/2003
Please indicate street patching on McMurry where the new driveway is to be installed as it is possible that the driveway
cannot be installed without damaging the pavement, requiring street repair.
Da
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report / OtherCKrrr �rruas
Utility Redline Utility Landscape C17{6,25
e
Page 1
Project Comments Sheet
S
City of Fort Collins elected Departments
Department: Stormwater Utility
Date: August 14, 2003
Project:
GOLDEN MEADOWS BUSINESS PARK PDP -TYPE II (LUC) #14-03
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
June 11, 2003
Note - Please identify your redlines for future reference
Issue Contact: Basil Harridan
Topic: Drainage
Number: 56 Created: 4/17/2003
8/12103
This plan is ready for mylars from my perpective. Thank you for a good submittal. Please provide 3 signed and
stamped copies of the drainage report along with the mylars for approval
Topic: Erosion Control
Number: 57 Created: 4/18/2003
6/1012003
Plan is OK. Thank you very much.
Sign D to
CHECK HERE IF YOU WISH TO RE COPIES OF REVISIONS
Plat Site Drainage Report Other_
Utility _ Redline Utility Landscape
Page I
Project Comments Sheet
66" Selected Departments
City of Fort Collins
Department: Engineering
Date: April 17, 2003
Project:
GOLDEN MEADOWS BUSINESS PARK PDP - TYPE II (LUC) #14-03
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
April 09, 2003
Note - Please identify your redlines for future reference
Issue Contact: Marc Virata
Topic: Building Elevations
Number: 49 Created: 4/17/2003
Shouldn't the retaining wall shown on the construction drawings be reflected on the building elevation plan?
Topic: Construction Plans
Number: 40 Created: 4/16/2003
Indicate the curb return radius being proposed on the Harmony/McMurry ramp (it appears to be 20', a 25' radius is
required at collector/arterial Intersections).
Number: 41 Created: 4/16/2003
it appears that the sidewalk running along the south side of the building will be on top of the retaining wall running along
the south. Is this intended? The retaining wall appears to have close to a two foot drop at Its maximum.
Number: 45 Created: 4/17/2003
The utility plans show numerous utilities within the sidewalk to be constructed. These are obstacles that cannot be located
on a sidewalk and require separation from the sidewalk in accordance with LCUASS Figure 16-1. The sidewalk needs to be
realigned and/or utilities relocated. It is my understanding that City utilities are attempting to coordinate with the amount
of utilities in the area. Any discussion should also involve meeting sidewalk separation from these utility appurtenances.
Number: 48 Created: 4/17/2003
Show the installation of a Type III barricade at the termination of the public sidewalk along Harmony Road at the east end
of the site.
Topic: General
Number: 1 Created: 4/7/2003
Ensure that "McMurry" is shown as the name of the north -south street adjacent to the site (it's not "McMurray") on all the
documents. /
Number: 36
Signature
Created: 4/16/2003
Date
HECK ]HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other_
Utility _ Redline Utility Landscape
Page 1
It doesn't appear that the ultimate design of Harmony Road (three through lanes) was accommodated into the site design.
Please use the Information provided on the "Harmony Road - Lemay Avenue to 1-25 Horizontal Alignment" (C1-237) to
accommodate for the future widening, providing right-of-way dedication and establishing setbacks from future edge of
pavement. Additional right-of-way may be needed and the location of the building may need to be changed to ensure the
80' setback along the Harmony corridor.
Number: 37 Created: 4/16/2003
3.6.3(F) of the Land Use Code requires a local street connection along the eastern boundary of the site for future
development to the east. Iln discussion between Transportation and Planning staff, alternative compliance to this section
was viewed as acceptable, provided a bike/ped connection stub to the property is provided.
Number: 38 Created: 4/16/2003
A formal decision for the variance request from driveway separation requirements is forthcoming. This had been discussed
with Transportation staff during conceptual planning and no objections were raised.
Number: 39 Created: 4/16/2003
Ensure that a copy of the plat (after the cover sheet) is provided when the construction plans are finalized for signature.
Number: 46 Created: 4/17/2003
Ensure that the title to all the plans read as Golden Meadows Business Park 2nd Filing.
Topic: Plat
Number: 44 Created: 4/16/2003
Please rearrange the order of the plat language to ensure that the owner signs off after the Certificate of Dedication,
Maintenance at Repair Guarantees. (This accurately defines "undersigned" on the document.)
Number: 47
Technical Services had the following comments:
1. Boundary Closes
2. McMurry is spelled wrong on the plat.
3. Sight Distance Easement Note is not needed.
4. Plat name needs to be consistent, "2nd" in title v.
with other documents).
Created: 4/17/2003
"second" in "legal". (Assuming should be "2nd" to be consistent
Topic: Site Plan
Number: 43 Created: 4/16/2003
The site plan Indicates "Future ROW" for right-of-way being dedicated with this project. Please remove "future" as it
implies it is not to be dedicated at this time.
Page 2
STAFF PROJECT REVIEW
City of Fort Collins
VF Ripley Associates Date: 4/17/2003
c/o Rachel Linder
401 West Mountain Avenue #201
Fort Collins, CO. 80521
Staff has reviewed your submittal for GOLDEN MEADOWS BUSINESS PARK PDP -
TYPE II (LUC) #14-03, and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Steve Olt
Topic: 6eneral
Number: 50 Created: 4/17/2003
Eric Bracke, the City's Traffic Engineer, indicated that the intersection spacing with
the Safeway access, to the west, is short but it will work. The Transportation Impact
Study is acceptable.
Number: 51 Created: 4/17/2003
Rick Lee of the Building Inspection Department indicated that he is attaching a copy
of the various codes that the City of Fort Collins will enforce.
Number: 52 Created: 4/17/2003
Len Hilderbrand of Xcel Energy provided the following comments:
a. There is an existing gas main on the north side of East Harmony Road, 13' south
of the north right-of-way line for Harmony.
b. There is an existing gas main on the west side of McMurry Avenue that is in a
utility easement.
Number: 53 Created: 4/17/2003
Current Planning comments are on red -lined Site, Landscape, Building Elevations, and
Photometric plans that are being forwarded to the applicant.
Department: Engineering Issue Contact: Marc Virata
Topic: Building Elevations
Number: 49 Created: 4/17/2003
Shouldn't the retaining wall shown on the construction drawings be reflected on the
building elevation plan?
Page 1
Topic: Construction Plans
Number: 40 Created: 4/16/2003
Indicate the curb return radius being proposed on the Harmony/McMurry ramp (it
appears to be 20', a 25' radius is required at collector/arterial intersections).
Number: 41 Created: 4/16/2003
It appears that the sidewalk running along the south side of the building will be on top
of the retaining wall running along the south. Is this intended? The retaining wall
appears to have close to a two foot drop at its maximum.
Number: 45 Created: 4/17/2003
The utility plans show numerous utilities within the sidewalk to be constructed. These
are obstacles that cannot be located on a sidewalk and require separation from the
sidewalk in accordance with LCUA55 Figure 16-1. The sidewalk needs to be realigned
and/or utilities relocated. It is my understanding that City utilities are attempting to
coordinate with the amount of utilities in the area. Any discussion should also involve
meeting sidewalk separation from these utility appurtenances.
Number: 48 Created: 4/17/2003
Show the installation of a Type III barricade at the termination of the public sidewalk
along Harmony Road at the east end of the site.
Topic: General
Number: 1 Created: 4/7/2003
Ensure that "McMurry" is shown as the name of the north -south street adjacent to
the site (it's not "McMurray") on all the documents.
Number: 36 Created: 4/16/2003
It doesn't appear that the ultimate design of Harmony Road (three through lanes) was
accommodated into the site design. Please use the information provided on the
"Harmony Road - L.emay Avenue to I-25 Horizontal Alignment" (C1-237) to
accommodate for the future widening, providing right-of-way dedication and
establishing setbacks from future edge of pavement. Additional right-of-way may be
needed and the location of the building may need to be changed to ensure the 80'
setback along the Harmony corridor.
Number: 37 Created: 4/16/2003
3.6.3(F) of the Land Use Code requires a local street connection along the eastern
boundary of the site for future development to the east. In discussion between
Transportation and Planning staff, alternative compliance to this section was viewed as
acceptable, provided a bike/ped connection stub to the property is provided.
Page 2
Number: 38 Created: 4/16/2003
A formal decision for the variance request from driveway separation requirements is
forthcoming. This had been discussed with Transportation staff during conceptual
planning and no objections were raised.
Number: 39 Created: 4/16/2003
Ensure that a copy of the plat (after the cover sheet) is provided when the
construction plans are finalized for signature.
Number: 46 Created: 4/17/2003
Ensure that the title to all the plans read as Golden Meadows Business Park 2nd Filing.
Topic: Plat
Number: 44 Created: 4/16/2003
Please rearrange the order of the plat language to ensure that the owner signs off
after the Certificate of Dedication, Maintenance & Repair Guarantees. (This
accurately defines "undersigned" on the document.)
Number: 47 Created: 4/17/2003
Technical Services had the following comments:
1. Boundary Closes
2. McMurry is spelled wrong on the plat (not McMurray).
3. Sight Distance Easement Note is not needed.
4. Plat name needs to be consistent, "2nd" in title v. "second" in "legal". (Assuming
should be "2nd" to be consistent with other documents).
Topic: Site Plan
Number: 43 Created: 4/16/2003
The site plan indicates "Future ROW" for right-of-way being dedicated with this
project. Please remove "future" as it implies it is not to be dedicated at this time.
Department: PFA Issue Contact: Michael Chavez
Topic: Genera/
Number: 32 Created: 4/14/2003
Required Access: A fire lane is required. The fire lane shall be visible by painting and
signage, and maintained unobstructed. 97 UFC 901.2.2.1; 901.3; 901.4.2; 902.2.1; FCLUC
Number: 33 Created: 4/14/2003
Address Numerals: Address numerals shall be visible from the street fronting the
property, and posted with a minimum of 6-inch numerals on a contrasting background.
(Bronze numerals on brown brick are not acceptable). 97 UFC 901.4.4
Page 3
Number: 34 Created: 4/14/2003
Water Supply: Commercial - No commercial building can be greater then 300 feet
from a fire hydrant. Fire hydrants are required with a maximum spacing of 600 feet
along an approved roadway. Each hydrant must be capable of delivering 1500 gallons of
water per minute at a residual pressure of 20 psi. 97 UFC 901.2.2.2
Number: 35 Created: 4/14/2003
Sprinkler Requirement: This proposed building shall be fire sprinklered. PFA requires a
"Knox Box" to be mounted on the front of every new building equipped with a required
fire sprinkler system or fire alarm system. 97 UFC 902.4; PFA Policy 88-20
Department: Police
Topic: Genera/
Issue Contact: Joseph Gerdom
Number: 26 Created: 4/9/2003
Lighting: Need .7fc of lighting along South face of building for 30 feet from each
access point.
Number: 27 Created: 4/10/2003
Lighting: Need minimum of 0.5fc adjacent to west side of building.
Department: Transportation Planning Issue Contact: Mark Jackson
Topic: Genera/
Number: 24 Created: 4/9/2003
I'm still unclear as to the uses for this site. I see the bank drive-thru listed on the
site plan, but the TI5 lists "Day Spa" as the use for traffic generation. I'd like to
know if these estimates truly reflect the intended uses for this site.
Number: 25 Created: 4/9/2003
Is the 4' sidewalk to the back of the buildings only for employee access or will
customers use this as well?
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: Genera/
Number: 28 Created: 4/14/2003
Show all existing and proposed water and sewer lines on the landscape plans. Maintain
the required landscape/utility separation distances on the landscape plans.
Number: 29 Created: 4/14/2003
Show existing/proposed gas and electric mains on the overall utility plans. Maintain 4
feet minimum separation between the proposed grease trap and all gas/electric lines.
Page 4