HomeMy WebLinkAboutCENTRE FOR ADVANCED TECHNOLOGY 22ND FILING - Filed DCP-DEV. CONSTRUCTION PERMIT - 2004-07-26City of Fort Collins
Transportation Services
Engineering Department
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: _CJ '> Issuance Date:�2
Project Name: Centre for Advanced Technology, 22nd Filing, Community Horticultural
Center
Project A.K.A.: _ Gardens on Spring Creek
Project Location: 2145 Centre Avenue, Fort Collins, CO
Permittee: Stephen See}eld, Facilities Project Manager, City Operations Services
City and developer contacts: See attached Exhibit "A" for names and phone numbers of all
contact persons for this project.
Fees: Permit Application Fee (paid at the time of application) $ N/A
Construction Inspection Fee (paid prior to issuance of this permit) $ N/A
Total $ N/A
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$ N/A
Form of security deposited with the City: N/A
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design
drawings and specifications the certification of all materials testing by an Engineer. The Permittee
shall have an Engineer prepare revised design drawings and secure City approval for all revisions to
the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required
by the City in the Development Agreement, that the improvements are constructed in conformance
with the approved Utility Plans and the standards and specifications of the City. The Permittee shall
provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the
constructed public improvements. (All references above to the terms "Project Engineer" and
"Engineer" shall mean a Professional Engineer licensed in Colorado.)
i �:,;rkll ( oli« �>e 1� ri.��: • l'(� Ro'�.:i8i1 Fort C ull n CC) 80 > �2-0580 • (0"0) 221-66105 • FAX (9170) 221-6: 78
5ti'LC�ti'.fC�'(1V".COi11
ESTIMATED COST OF INFRASTRUCTURE IMPROVEMENTS: Provide the estimated
value of all public infrastructure improvements that will be constructed and accepted by the City
to own and maintain. In additional provide the value of all private infrastructure improvements
that the City will inspect and require certification for. The estimate shall be in the same format
as the attached sheet titled "Project Quantities and Cost Estimate Sheet."
Public infrastructure, estimated cost:
Private infrastructure, estimated cost:
I certify that the information on this permit application along with the required additional
submittals are true and correct to the best of my knowledge, and that in filing this application I
am acting with the knowledge, consent, and authority of the owners of the property (including all
owners having legal or equitable interest in the real property, as defined in Section 1-2 of the
City Code; and including common areas legally connected to or associated with the property
which is the subjecl of this application) without whose consent and authority the requested action
could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to
enter upon the property for purposes on inspection and, if necessary.. to enter upon such property
to perform work required of the applicant if the applicant were to fail to perform the required
work..
Applicant Signature:
�n "C'd a?� Date:
�v
y
�
41 S
b
�
C
✓ ICI � I i
c
U Q � o U a•a
� 7 .
1
y
gill IIII, li €F W
I'
O
� 1
i g}}ag
y
a
4
p
s
fill
�
# I f I
0000
;1! 4ia�BiBB
a3
x =m ofi s fill
00
,It
LO
a�
0
L
O
Y
W
W
W
J
C
W rn
F d
U
U) O
J z
Q m
rcr-
o
O
U)
milli
I
Bill
gill
11
11
mill
1
mililligil
Nil
logillimil
milloll
mill
mill
I
Project Quantities and Cost Estimate Sheet
Fort Collins community Horticultural Center 5111101
Infrastructur l Inspectiol
e
n Fee
Constructio '',
Total
11 per Unit
n Cost per
Estimated
1 (provide
Total
Units of
Estimated
Unit of Infrastructure
d by
Inspection
Description
Measure
Quantity
Measure
a Cost
City)
Fee
Storm Sewer
Reinforced Concrete Pipe
L.F.
548
$0.00
$0.00
$0.60
$328.80
Trench
L.F.
378
$0.00
$0.00
$0.60
$226.80
Concrete Headwall & Box Culy.
C.Y.
5
$0.00
$0.00
$3.00
$15.00
Water Quality Outlet Structure
C.Y.
0
$0.00
$0.00
$3.00
$0.00
All Inlet Types
EACH
2
$0.00
$0.00
$90.00
$180.00
Manhole
EACH
1
$0.00
$0.00
$90.00
$90.00
Water & Sanitary Sewer
--
- --
Sanitary Sewer Main
L.F.
0
$0.00
$0.00
$0.60
$0.00
Water Main
L.F.
692
$0.00
$0.00
$0.60
$415.20
Trench
L.F.
814
$0.00
$0.00
$0.60
$488.40
Water/Sewer Service Line Stub
EACH
3
$0.00
$0.00
$60.00
$180.00
Fire Hydrant
EACH
1
$0.00
$0.00
$60.00
$60.00
Manhole
EACH
1
$0.00
$0.00
$90.00
! $90.00
Valves
EACH
4
$0.00
$0.00
$60.00
$240.00
Meter Pit (2")
EACH
2
$0.00
$0.00
$30.00
$60.00
Fitting (Bend, Tee, Cross)
EACH
4
$0.00
$0.00
$30.00
$120.00
Water Main Connection
EACH
0
$0.00
$0.00
$0.00
$0.00
Street System
Grading
L.S.
0
$0.00
$0.00
$0.00
$0.00
Pavement
S.Y.
2,200
$0.00
$0.00
$0.30
$660.00
Curb & Gutter
L.F.
1,000
$0.00
$0.00
$0.80
$ 820.00
Detached Sidewalk
L.F.
920
$0.00
$0.00
$0.80
$ 756.00
Pedestrian Ramps
L.F.
40
$0.00
$0.00
$0.80
$ 52.00
Apron
S.F.
0
$0.00
$0.00
$0.10
$ 55.00
Crossnan
S.F.
1,101
$0.00
$0.00
$0.10
$ 165.10
(Total Inspection Fee
Development Construction Permit, Page 2/5
2. All contractors who perform work on this project must be bonded and licensed in conformance
with City requirements.
3. Construction time restrictions:
4. The applicant understands that additional permits maybe required for this development project
and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic
study, drainage report, plat easements and any other official documents), shall be kept on the
development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or
Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration date.
Such application shall contain information sufficient to justify the granting of the extension.
An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions contained
in the Development .Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-
678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the
Development Agreement does not specify times for completion of public improvements, or if there is
no Development Agreement, then the improvement requirements specified in Section 24-95 of the
City Code shall apply, which provides that construction of all improvements shall be required prior
to the time of issuance of the first building permit.
8. Acceptance by the City of the public improvements shall be after (1) final inspection has been
conducted by the City; (2) punch list items from the final inspection are completed and accepted by
the City; and (3) required certifications from the licensed professional engineer that improvements
are completed to City standards, specifications and approved Utility Plans; and the "as -constructed"
plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the City
of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional
Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use
Development Construction Permit, Page 3/5
Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any
planned construction on this project. All required perimeter silt fencing and other erosion/sediment
control best management practices (BMP's) that can be installed prior to construction must be in
place and inspected by the City Erosion Control Inspector before any land disturbing activity begins.
11. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
12. Other conditions: N/A
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of
the owners of the property (including all owners having legal or equitable interest in the real property, as
defined in Section 1-2 of the City Code; and including common areas legally connected to or associated
with the property which is the subject of this application) without whose consent and authority the
requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City
officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such
property to perform work required of the applicant if the applicant were to fail to perform the required
work. I also acknowledge that I have read this permit document with all its requirements and
conditions, and I agree to all of the terms and conditions so stated in this permit.
i
Applicant/Project Manager' s Signature: k'I✓� zdA—Date:
Approval for issuance:
City Engineer Approval:Date:
i (Permit Issuance Date)
Development Construction Permit, Page 4/5
EXHIBIT "A"
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name:
Project A.K.A.:
City Staff Contact Persons:
Development Engineer:
Construction Inspector:
Name, address and numbers
Centre for Advanced Technology, 22°d Filing,
Community Horticultural Center
Gardens on Spring Creek
Marc Virata / City of Fort Collins, 281 North
College Avenue, Fort Collins, CO 80524
970 221-6605 x7188
Rhonda Henson / City of Fort Collins, 281 North
College Avenue, Fort Collins, CO 80524
970 217-4089
Current Planner: Steve Olt / City of Fort Collins, 281 North College
Avenue, Fort Collins, CO 80524
970 221-6341
Water Utilities Engineer: Roger Buffington / City of Fort Collins, 700 Wood
Street, Fort Collins, CO 80521
970 221-6854
Erosion Control Inspector: Bob Zakely / City of Fort Collins, 700 Wood Street
Fort Collins, CO 80521
970 221-6063
Natural Resources: Doug Moore / City of Fort Collins, 281 North
College Avenue, Fort Collins, CO 80524
970 224-6143
Traffic Operations: Eric Bracke / City of Fort Collins, 625 Linden
Street, Fort Collins, CO 80524
970 224-6062
Street closures: Syl Mireles / City of Fort Collins, 625 Linden
Street, Fort Collins, CO 80524
970 221-6815
Development Construction Permit, Page 5/5
Transportation Planning: Tom Reiff / City of Fort Collins, 215 North Mason
Street, Fort Collins, CO 80524
970 416-2040
Forestry: Tim Buchanan / City of Fort Collins, 281 North
Collegc Avenue, Fort Collins, CO 80522
970 221-6361
Li"111 and Vowel-: Doup- Martine i City of l:ort Collins, 700 Wood
Street. Fort Collins, CO 8i121
970 224-6154
Developer' Contact Persons:
Project I\T;niacrl
l)cvclolxr/O��ncr
1'lannelWI.1)j 1;nrinccr:
Steve Secfeld / City of l,ort Collins, 117 N.
Mason Street, Fort Collins, CO 80522
970 221-0227
97l'1 2'22-2 I 7 1
O7O 22_-9434 (fax)
sc_c11Cd�ir`v.Coill
Da�, 1d `>t1hC , ( TWO t lnrst / 1�1
1A1oUll?-11n Aveww. 1'hf( Colki1 �,. l) 'l�.r''.•�
9 r 0 48-4-007 i
970 ASS-5518
sti�ed(c%cda�ti.con1
General Contractor: Jeff Dingwall / Golden Trianbte Construction, Inc.
700 Weaver Paul: Road, Longmont. CO 80501
303 772-4051
720 323-0471
303 776-6525
jdingwallO-tc Lnet
DEVELOPMENT CONSTRUCTION PERMIT APPLICATION
�,991
For City use only: Application Number: - Q > Application Date:
Permit application fee: $
INSTRUCTIONS:
1. Complete this form (some question may not apply to you) and attach all necessary
documeints and submit to the Development Engineering Section of the City.
2. If you have any questions contact the Development Engineer
at 221-6750.
3. Submit the Application and pay the Application Fee at the Engineering counter at 281
N. College Avenue.
PROJECT INFORMATION:
Project Name (as approved by the City):
Community Horticulture Center
Project A.K.A. (Marketing name if different form Project Name):
Garden on Spring Creek
Project Location: 2145 Centre Avenue, Fort Collins, CO
Property Owner (At the time of this permit issuance):
Name: Citv of Fort Collins
Address: 300 LaPorte Avenue (117 N. Mason Street)
Phone number(s): Operations Services
Office: (9970) 221-6611
Cell phone: n/a/
Fax number: (970) 221-6534
Email: n/a
Applicant/Project Manager (The primary contact person for all matters regarding this project,
and the person responsible for all matters referencing "the Developer" in the Development
Agreement for this project):
Name: Ste
t)hen Seefeld
Address: 117 N. Mason Street — Fort Collins, CO 80522
Phone Number(s):
Office: (970) 221-6227
Cell phone: (970) 222-2371
Fax number: (970) 223-9434
Email: ssee1e.1"rrrfcoov_corn
Project Engineer (A Colorado licensed professional engineer who is the civil engineer the
person responsible for the design of this project, responsible for certification that improvements
are constructed in accordance with approved plans, responsible for making revisions to plans
with City approval and for providing as -constructed plans):
Name: David Stipe / Greg Hurst
Address: 240E Mountain Avenue — Fort Collins. CO
Phone number(s):
Office: (970) 484-6073
Cell phone: n/a
Fax number: (970) 484-8518
Email: sti�aed'tteda .com
Professional License Number: Registration # Colorado 18890
Developer (The party or parties referenced in the Development Agreement who are responsible
for the Developer's obligations contained in the Agreement -add additional names below):
Name: City of Fort Collins
Address: 300 LaPorte Avenue
Phone number(s):
Office: (970) 221-6227
Cell phone: (970) 222-2371
Fax number: (970) 221-6534
Email: ssee1eld'ii-f6_,ov.c01n
General Contractor (The contractor in overall charge of the public infrastructure construction):
Name: Golden Triangle Construction Inc — Jeff Dingwall
Address: 700 Weaver Park Road Longmont CO 80501
Phone number(s):
Office: (303) 772-4051
Cell phone: (720) 323-0471
Fax number: (303) 776-6525
Email:�dingw�il ('tr<tc l .net
If you have no General Contractor, list all other contractors below.
Grading contractor
Name:
Address:
Phone number(s):
Office:
Cell phone:_
Fax number:
Email:
Utility Contractor
Name:
Address:
Phone number(s):
Office:
Cell phone:_
Fax number:
Email:
Concrete contractor for flat work
Name:
Address:_
Phone number(s):
Office:
Cell phone:
Fax number:
Email:
Concrete contractor for structures
Name:
Address:_
Phone number(s):
Office:
Cell phone:
Fax number:
Email:
Paving contractor
Name:
Phone number(s):
Office:
Cell phone:_
Fax number:
Email:
Landscape contractor
Name:
Address:_
Phone number(s):
Office:
Cell phone:_
Fax number:
Email:
Other contractors and parties involved in the project:
SUBMIT THE FOLLOWING ITEMS (Required for all projects):
• 8'/2" x I I" copy of the Site Plan -✓
• Proposed Project Schedule V
• Project quantities and cost estimate for all of the public improvements to be constructed.
In addition, include all private improvements that are required to be inspected by the City
Construction Inspectors. This information must be submitted in the format shown on the
attached form title "Project Quantities and Cost Estimate Sheet."
ADDITIONAL SU13MITTALS (Required if checked):
❑ Traffic control plan(s) for the project
❑ Proposed haul routes shown on the City map
❑ Shop drawings
❑ Other
CONSTRUCTION COORDINATION MEETING: A construction coordination meeting to
discuss plans and special requirements for your project, is required for all development projects.
The people required to attend the meeting are the Project Manager, Project Engineer, Developer,
Architect/Land Planner and General Contractor (if no General Contractor, representative for each
of the contractors expected to work on this project)
People to Attend: List the peoples names and titles for those who will attend the pre -