February 25, 2002
Ms. Susan .toy
City of Fort Collins Engineering Department
281 North College Avenue
Fort Collins, Colorado 80522
RE: Spanjer Office Building
Request for Variance - Easements
Susan,
This letter is in regards to the Spanjer Office Building project, and in particular, to request a
variance. Our client for this project is Spanjer Construction Corporation.
The specific area of concern is along the easterly boundary of the project. A 6' sidewalk has been
requested to be installed along the westerly side of the frontage road. Currently, the existing
Right -of -Way is approximately V west of the existing back of curb. There is also an existing 10'
utility easement west of the Right -of -Way line. Therefore, the developer would either need to
dedicate additional Right -of -Way to accommodate the new sidewalk, or he would need to
dedicate a 5' pedestrian access easement on top of the existing utility easement.
Given the unique constraints of the existing site, and the nature of the proposed improvements,
dedication of additional Right -of -Way would be detrimental to the site layout. After some
discussion with City staff, and the affected utilities, the idea of a combined easement was
suggested, and was generally agreed to be a feasible alternative.
Therefore, on behalf of our client, we are requesting a variance to City standards to allow a
pedestrian easement be dedicated within the existing utility easement, instead of dedicating
additional Right -of -Way.
We feeljustitied in requesting the variance. This allows pedestrian and utility access while
optimizing the space of the site. We do not feel that this variance will be detrimental to the public
health, safety or welfare, nor will it cause conflict between the easements.
Please call if you have any questions.
me
I� �t b11G-----...✓
Roger A 'urtiss, P.E.
Project Manager
cc: Steve Spanjer— Spanjer Construction
Trista Sigler— Land Images
Bud Frick — WJ Frick Design Group
970 SOUTH 110dFS SU!TF 202. FORT (OLHNS, (OLORA00 80521, (970) 221-4158, FAX (970) 221-4159
Transportation Services
Engineering Department
City of Fort Collins
May 20, 2002
Roger A. Curtiss, P.E.
Northern Engineering Services, Inc.
420 South Howes, Suite 202
Fort Collins, CO 80521
RE: Spanjer Office Building — Variance request for Overlapping Easements
Dear Roger,
This letter is in response to the variance request, dated February 25, 2002, to dedicate a
public access easement with the existing utility easement.
The variance request is granted.
This variance request does not set a precedence or change the application of our design
standards in other situations. If you have any questions, please contact Susan Joy at 221-
6605.
Sincerely,
Susan Joy I
Development ie� ngineer
Cc: Steve Olt, file
_SI Nor1h C o11rF,c Acrnuc • I'_O. Boy 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 • FAX (970) 221-6978
w w ka.ci. i ort-col l in S. co. us
Transportation Services
Engineering Department
City of Fort Collins
May 23, 2002
Roger A. Curtiss, P.E.
Northern Engineering Services, Inc.
420 South Howes, Suite 202
Fort Collins, CO 80521
RE: Harmony Ridge Replat — Variance Requests
Dear Roger,
This letter is in response to the variance requests, dated April 18, 2002.
The variance request to Table 7-3, minimum distance between driveway and a street
intersection has been granted. The driveways for lots 90, 108, and 63 may be constructed
as shown.
The variance request to Table 7-3, minimum 12' distance between driveway edges has
been granted. The driveways may have less than the 12' distance between them because
of their cul-de-sac location.
The variance to section 9.4.2 requiring that driveway approaches intersect at 90 degrees,
plus or minus 10 degrees has been granted. The driveway approaches may be
constructed as shown on the plans.
This variance request does not set a precedence or change the application of our design
standards in other situations. If you have any questions, please contact Susan Joy at 221-
6605.
Sincerely,
let
an Joy
Development Review ngmeer
Cc: Steve Olt, file
38I Not College Avenue • I'.O_ Boz 780 • Fort Collins, CO 80522-0580 • (970) 221-6605 • FAX (970) 221-6378
www.ci.fort-colIins.co.us
Landscape Architecture — Site Planning - Photography
215 W. Magnolia Street, ste. 202
Fort Collins, CO. 80521
970.472.8954
July 10, 2001
Brian Grubb
Fort Collins Planning Department
281 North College Avenue
Fort Collins, Colorado 80521
Ref.: Spanjer Office Building Planning Objectives
Dear City Review Staff,
We are pleased to submit this statement of planning objectives for Spanjer Office Building. The
following information was prepared in compliance with the Submittal Requirements for type I
Project Development Plan Review for commercial sites.
Spanjer Office Building is located at Cameron Drive, adjacent to the College Avenue frontage
road. The property is currently zoned C-commercial and is a vacant lot. The zoning for the
property is to remain commercial.
The total project is approximately .45 acres in size. A 3613 s.f. office building is proposed with a
920 s.f. storage unit The building will be occupied by Spanjer Construction and one other office
tenant. In general, the site slopes from the northwest to the southeast.
The landscaping will be designed to meet a 6% internal landscape requirement and incorporate
xeriscape principles where applicable. The landscape will also serve functional uses such as
screening near property lines or enhancing views into and out of the site. Standard street tree
spacing is used on Cameron Drive but can not be incorporated along the frontage road due to the
existing utility easement.
Parking will be contained within the site and will include nine standard spaces and one handicap
accessible space.
Please see accompanying engineering report for a description of existing and proposed utilities
including sewage disposal, water supply, stormwater facilities, and fire protection. Also see
engineering drainage reports.
If you have any questions or comments regarding planning objectives, please feel free to contact
me at your convenience.
Thank
Michael Chalona
Susan Joy - Re trans coord 10/4 Page 1
From: Dave Stringer
To: Cam McNair, Eric Bracke, GayLene Rossiter, Kath_.
Date: Wed, Oct 3 2001 3 01 PM
Subject: Re trans coord 1014
I would be interested in hearing the out come or discussions for the reverse parking proposed by Rigden
Farms Eric/Cam cr Troy I'm not sure who all is involved in these discussions
Dave
>>> Sheri Wamhoff 10/03 2,30 PM >>>
Here is the agenda for this week.
1. South College site - Kathleen
2 Centerpoint plaza - rr xing who pays and is responsible - sheri and mark
Let me know if there is anything more.
Sheri
S10E��-
tmPo.�v�:� .
.- •
TO:
FROM
DATE:
RE:
MEMORANDUM
Dennis GreCnwalt'AT&T
Susan Joy, Development Review Engineer
March 26. 2002
REQUEST TO PLACE A SIDEWALK OVER A PORTION OF AN EASEMENT
Attached for you review and comment is a sketch showing The Spanjer Office Building at the
Cameron Park Subdivision located at the Northwest corner of Cameron Drive and College Avenue
Montage road, with the portion of the utility and access easement that is proposed for overlap shaded
in. The overlap is being requested in order to meet the city's sidewalk requirement along the
frontage road while maintaining the existing 10' utility easement. Attached is a copy of the variance
request from Northern Engineering Services and a vicinity map of the site.
Please sign and return any comments to Susan Joy in the Development Review Center by Thursday,
April 1 I , 2002. If we do not hear from you by this date, we will assume you have no objections to
the proposed overlap. Please cal I Susan at 221-6750 if you have any questions. Thank You.
No Problems
roblems/Concems as follows: L
C -�
_Et:AorlhCol��ge?..enue 110.Box 5B41 • FortCollins,CO807 A2 80 • (97( -, 1 6605 • FAX (970)"1-6378
www. tcgov.com
Public Access & Utility
Easement Overlap Request
I �t
Existing 1o'
Utility Easement Proposed 5'
_ Public Access
—77i,, Easement
— Lj
Spanjer Office
Building
Ii
i`
THICKENED EDGE
'
-
SIDEWALK
+ =
i`
'
5.33' SIDEWALK
i 1
I
1 A
I �
•
I �
I
AND
n
-<
D
£
I m
1
v
O
t7�A •
r
l/I Z�Z
A�
Z
I~
w
_
O O
Sl m
m
cn
1
DC
m
m
OZ
m
of
A
m
C. I
mSt
f
ZC j
e
��.
�� 1
10
5' ACCESS EASEMENT
6' WALK
m m f
ZpoCi U
-�'— - --- - -- — -- -- -- 00
FRONTAGE BROAD g m goo
z
�i
--------------- -'— '-------------
- - — - ---COLLEGE AVEP
V.
City of Fort Collins
Transportation Services
I minrering Department
MEMORANDUM
TO: Basil Hamden/Stormwater
FROM: Susan Joy, Development Review Engineer
DATE: March 26, 2002
RE: REQUEST TO PLACE A SIDEWALK OVER A PORTION OF AN EASEMENT
Attached for you review and comment is a sketch showing The Spanjer Office Building at the
Cameron Park Subdivision located at the Northwest corner of Cameron Drive and College Avenue
frontage road, with the portion of the utility and access easement that is proposed for overlap shaded
in. The overlap is being requested in order to meet the city's sidewalk requirement along the
fi-ontagc road while maintaining the existing 10' utility easement. Attached is a copy of the variance
request from Northern Engineering Services and a vicinity map of the site.
Please sign and return any comments to Susan ,toy in the Development Review Center by Thursday,
April 11, 2002. 11 we do not hear from you by this date, we will assume you have no objections to
the proposed overlap. Please call Susan at 221-6750 if you have any questions. Thank You.
No Problems
Problems/Concerns as follows:
_ .....li .1.�•.: i,t��ii��w(t.p.. tCnllim.CQh0522-0580•(970)2o1_660h.14X(97f1);78
llm.com
Citv of Fort Collins
Transportation Services
Int>ineering Department
MEMORANDUM
TO: Bruce Vogel/Light and Power
FROM: Susan Joy, Development Review Engineer
DATE: March 26, 2002
RE: REQUEST TO PLACE A SIDEWALK OVER A PORTION OF AN EASEMENT
Attached for you review and comment is a sketch showing The Spanjer Office Building at the
Cameron Park Subdivision located at the Northwest corner of Cameron Drive and College Avenue
frontage road, with the portion of the utility and access easement that is proposed for overlap shaded
in. The overlap is being requested in order to meet the city's sidewalk requirement along the
fYontagc road while maintaining the existing 10' utility easement. Attached is a copy of the variance
request from Northern Engineering Services and a vicinity map of the site.
Please sign and return any continents to Susan Joy in the Development Review Center by Thursday,
April 11, 2002. Uwe do not hear from you by this date, we will assume you have no objections to
the proposed overlap. Please call Susan at 221-6750 if you have any questions. Thank You.
No Problems
Problems/Concerns as follows:
/`: 4 �Aoac,
OSfh11_0;Sll. (97(1)2)1.(60; • IA\iQ70)221_6,7ti
�c�c�rA, gov Com
MEMORANDUM
TO: Rogcr Bullington!Watc+,'Wastcwatcr
FROM: Susan .Ioy, Development Review Engineer
DATE: March 26, 2002
RE: REQUEST TO PLACE A SIDEWALK OVER A PORTION OF AN EASEMENT
Attached for you review and comment is a sketch showing The Spanjer Office Building at the
Cameron Park Subdivision located at the Northwest corner of Cameron Drive and College Avenue
frontage road, with the portion of the utility and access easement that is proposed for overlap shaded
in. "fhe overlap is being requested in order to meet the city's sidewalk requirement along the
frontage road while maintaining the existing 10' utility easement. Attached is a copy of the variance
request from Northern Engineering Services and a vicinity map of the site.
Please sign and return any comments to Susan Joy in the Development Review Center by Thursday,
April 11, 2002. If we do not hear from you by this date, we will assume you have no objections to
the proposed overlap. Please call Susan at 221-6750 if you have any questions. Thank You.
—ia�Eroblems
I
r .. -=
/
..✓
Problems/Concerns as follows:
281 No it!) Colleg., Avenue • P.O Box 580 • Port Coltin=_, CO 80522-0580 • (910) 221-6605 • FAX (970) 221-6378
www.fcgov.com
FORT COLLINS LOVELAND WA"IF.R DISTRICT
v
60
SOUn I FORT COLLNS SANrfATTON DISTRICT
i
April 10, 2002
Ms. Susan Joy
City of Fort Collins
P.O. Box 580
Fort Collins, CO 80525
RE: Request to place a sidewalk over a portion of an casement
Spanjer Office Building
Dear Ms.Jov,
The Fort Collins - Loveland Water District and the South Fort Collins Sanitation District have reviewed
the above mentioned request and submit the following comments.
There are District water meter pits located within the easement. The meter pits cannot be located
under the sidewalk or within 10 feet of landscaping, such as trees. The relocation of the meter pits
must be done in accordance with District requirements and standards.
Please do not hesitate to contact me at 226-3104, ext. 14, if you have any questions or require additional
information.
Respectfully, /%�
�"�
Mr.W. FarFarrill
Systems Engineer
xc: Mr. Michael D. DiTullio, District Manager
5150 Snead Drive, Fort Collins, CO 80525 Phone (970) 226-3104 Fax (970) 226-0186
APPROVED
By: L Date: O2—
® City of Fort Collins
Engineering Department
Interoffice Memorandum
Date: May 10, 2002 r�
To: Cam McNair, City Engineer JCll�l
Thru: Dave Stringer, Development Review Manager o
From: Susan Joy, Development Review Engineer
RE: Variance Request for the Spanjer Office Building
Northern Engineering Services Inc., on behalf of the Developer for the Spanjer Office Building project,
has submitted a variance request to the City of Fort Collins design standards. In accordance with detail
7-8F, the Developer is required to dedicate a 9' utility easement from the back of walk. The property in
question is bordered on the east by the College Avenue Frontage Road (a modified Connector Local
street with an attached walk) and the west by Cameron Drive (a Connector Local street). The variance
is for overlapping the existing 10' utility and the proposed 6' attached sidewalk in order to preserve the
platted site layout.
This variance request was routed to the City's Light and Power, Stormwater, and Water/Wastewater
departments, as well as PSCO/Excel, Qwest, AT&T, and the Fort Collins Water District. Only two
utilities returned concerns, AT&T and the FCLWD. AT&T requires that two existing 2" PVC duct lines
along the frontage road be relocated and the FCLWD requires that all District water meter pits be
relocated behind the sidewalk and at least 10 feet away from landscaping, such as trees. Both of these
items will be addressed at the Utility Coordination meeting to be scheduled prior to construction. No
other utility or department had problems or concerns with granting this variance.
It is my opinion that this variance can be supported based on the fact that the Utilities find it acceptable
as long as their requirements are met and granting the overlapping utility easement and sidewalk will not
adversely affect or harm the City of Fort Collins in any way.
Please let me know if you have any questions or concerns and if you need any additional clarification.
Sincerely,
Susan Joy
Enclosures