HomeMy WebLinkAboutCAMERON PARK REPLAT LOT 7 - Filed GC-GENERAL CORRESPONDENCE - 2004-07-22EENEKEU�� February 25, 2002 Ms. Susan .toy City of Fort Collins Engineering Department 281 North College Avenue Fort Collins, Colorado 80522 RE: Spanjer Office Building Request for Variance - Easements Susan, This letter is in regards to the Spanjer Office Building project, and in particular, to request a variance. Our client for this project is Spanjer Construction Corporation. The specific area of concern is along the easterly boundary of the project. A 6' sidewalk has been requested to be installed along the westerly side of the frontage road. Currently, the existing Right -of -Way is approximately V west of the existing back of curb. There is also an existing 10' utility easement west of the Right -of -Way line. Therefore, the developer would either need to dedicate additional Right -of -Way to accommodate the new sidewalk, or he would need to dedicate a 5' pedestrian access easement on top of the existing utility easement. Given the unique constraints of the existing site, and the nature of the proposed improvements, dedication of additional Right -of -Way would be detrimental to the site layout. After some discussion with City staff, and the affected utilities, the idea of a combined easement was suggested, and was generally agreed to be a feasible alternative. Therefore, on behalf of our client, we are requesting a variance to City standards to allow a pedestrian easement be dedicated within the existing utility easement, instead of dedicating additional Right -of -Way. We feeljustitied in requesting the variance. This allows pedestrian and utility access while optimizing the space of the site. We do not feel that this variance will be detrimental to the public health, safety or welfare, nor will it cause conflict between the easements. Please call if you have any questions. me I� �t b11G-----...✓ Roger A 'urtiss, P.E. Project Manager cc: Steve Spanjer— Spanjer Construction Trista Sigler— Land Images Bud Frick — WJ Frick Design Group 970 SOUTH 110dFS SU!TF 202. FORT (OLHNS, (OLORA00 80521, (970) 221-4158, FAX (970) 221-4159 Transportation Services Engineering Department City of Fort Collins May 20, 2002 Roger A. Curtiss, P.E. Northern Engineering Services, Inc. 420 South Howes, Suite 202 Fort Collins, CO 80521 RE: Spanjer Office Building — Variance request for Overlapping Easements Dear Roger, This letter is in response to the variance request, dated February 25, 2002, to dedicate a public access easement with the existing utility easement. The variance request is granted. This variance request does not set a precedence or change the application of our design standards in other situations. If you have any questions, please contact Susan Joy at 221- 6605. Sincerely, Susan Joy I Development ie� ngineer Cc: Steve Olt, file _SI Nor1h C o11rF,c Acrnuc • I'_O. Boy 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 • FAX (970) 221-6978 w w ka.ci. i ort-col l in S. co. us Transportation Services Engineering Department City of Fort Collins May 23, 2002 Roger A. Curtiss, P.E. Northern Engineering Services, Inc. 420 South Howes, Suite 202 Fort Collins, CO 80521 RE: Harmony Ridge Replat — Variance Requests Dear Roger, This letter is in response to the variance requests, dated April 18, 2002. The variance request to Table 7-3, minimum distance between driveway and a street intersection has been granted. The driveways for lots 90, 108, and 63 may be constructed as shown. The variance request to Table 7-3, minimum 12' distance between driveway edges has been granted. The driveways may have less than the 12' distance between them because of their cul-de-sac location. The variance to section 9.4.2 requiring that driveway approaches intersect at 90 degrees, plus or minus 10 degrees has been granted. The driveway approaches may be constructed as shown on the plans. This variance request does not set a precedence or change the application of our design standards in other situations. If you have any questions, please contact Susan Joy at 221- 6605. Sincerely, let an Joy Development Review ngmeer Cc: Steve Olt, file 38I Not College Avenue • I'.O_ Boz 780 • Fort Collins, CO 80522-0580 • (970) 221-6605 • FAX (970) 221-6378 www.ci.fort-colIins.co.us Landscape Architecture — Site Planning - Photography 215 W. Magnolia Street, ste. 202 Fort Collins, CO. 80521 970.472.8954 July 10, 2001 Brian Grubb Fort Collins Planning Department 281 North College Avenue Fort Collins, Colorado 80521 Ref.: Spanjer Office Building Planning Objectives Dear City Review Staff, We are pleased to submit this statement of planning objectives for Spanjer Office Building. The following information was prepared in compliance with the Submittal Requirements for type I Project Development Plan Review for commercial sites. Spanjer Office Building is located at Cameron Drive, adjacent to the College Avenue frontage road. The property is currently zoned C-commercial and is a vacant lot. The zoning for the property is to remain commercial. The total project is approximately .45 acres in size. A 3613 s.f. office building is proposed with a 920 s.f. storage unit The building will be occupied by Spanjer Construction and one other office tenant. In general, the site slopes from the northwest to the southeast. The landscaping will be designed to meet a 6% internal landscape requirement and incorporate xeriscape principles where applicable. The landscape will also serve functional uses such as screening near property lines or enhancing views into and out of the site. Standard street tree spacing is used on Cameron Drive but can not be incorporated along the frontage road due to the existing utility easement. Parking will be contained within the site and will include nine standard spaces and one handicap accessible space. Please see accompanying engineering report for a description of existing and proposed utilities including sewage disposal, water supply, stormwater facilities, and fire protection. Also see engineering drainage reports. If you have any questions or comments regarding planning objectives, please feel free to contact me at your convenience. Thank Michael Chalona Susan Joy - Re trans coord 10/4 Page 1 From: Dave Stringer To: Cam McNair, Eric Bracke, GayLene Rossiter, Kath_. Date: Wed, Oct 3 2001 3 01 PM Subject: Re trans coord 1014 I would be interested in hearing the out come or discussions for the reverse parking proposed by Rigden Farms Eric/Cam cr Troy I'm not sure who all is involved in these discussions Dave >>> Sheri Wamhoff 10/03 2,30 PM >>> Here is the agenda for this week. 1. South College site - Kathleen 2 Centerpoint plaza - rr xing who pays and is responsible - sheri and mark Let me know if there is anything more. Sheri S10E��- tmPo.�v�:� . .- • TO: FROM DATE: RE: MEMORANDUM Dennis GreCnwalt'AT&T Susan Joy, Development Review Engineer March 26. 2002 REQUEST TO PLACE A SIDEWALK OVER A PORTION OF AN EASEMENT Attached for you review and comment is a sketch showing The Spanjer Office Building at the Cameron Park Subdivision located at the Northwest corner of Cameron Drive and College Avenue Montage road, with the portion of the utility and access easement that is proposed for overlap shaded in. The overlap is being requested in order to meet the city's sidewalk requirement along the frontage road while maintaining the existing 10' utility easement. Attached is a copy of the variance request from Northern Engineering Services and a vicinity map of the site. Please sign and return any comments to Susan Joy in the Development Review Center by Thursday, April 1 I , 2002. If we do not hear from you by this date, we will assume you have no objections to the proposed overlap. Please cal I Susan at 221-6750 if you have any questions. Thank You. No Problems roblems/Concems as follows: L C -� _Et:AorlhCol��ge?..enue 110.Box 5B41 • FortCollins,CO807 A2 80 • (97( -, 1 6605 • FAX (970)"1-6378 www. tcgov.com Public Access & Utility Easement Overlap Request I �t Existing 1o' Utility Easement Proposed 5' _ Public Access —77i,, Easement — Lj Spanjer Office Building Ii i` THICKENED EDGE ' - SIDEWALK + = i` ' 5.33' SIDEWALK i 1 I 1 A I � • I � I AND n -< D £ I m 1 v O t7�A • r l/I Z�Z A� Z I~ w _ O O Sl m m cn 1 DC m m OZ m of A m C. I mSt f ZC j e ��. �� 1 10 5' ACCESS EASEMENT 6' WALK m m f ZpoCi U -�'— - --- - -- — -- -- -- 00 FRONTAGE BROAD g m goo z �i --------------- -'— '------------- - - — - ---COLLEGE AVEP V. City of Fort Collins Transportation Services I minrering Department MEMORANDUM TO: Basil Hamden/Stormwater FROM: Susan Joy, Development Review Engineer DATE: March 26, 2002 RE: REQUEST TO PLACE A SIDEWALK OVER A PORTION OF AN EASEMENT Attached for you review and comment is a sketch showing The Spanjer Office Building at the Cameron Park Subdivision located at the Northwest corner of Cameron Drive and College Avenue frontage road, with the portion of the utility and access easement that is proposed for overlap shaded in. The overlap is being requested in order to meet the city's sidewalk requirement along the fi-ontagc road while maintaining the existing 10' utility easement. Attached is a copy of the variance request from Northern Engineering Services and a vicinity map of the site. Please sign and return any comments to Susan ,toy in the Development Review Center by Thursday, April 11, 2002. 11 we do not hear from you by this date, we will assume you have no objections to the proposed overlap. Please call Susan at 221-6750 if you have any questions. Thank You. No Problems Problems/Concerns as follows: _ .....li .1.�•.: i,t��ii��w(t.p.. tCnllim.CQh0522-0580•(970)2o1_660h.14X(97f1);78 llm.com Citv of Fort Collins Transportation Services Int>ineering Department MEMORANDUM TO: Bruce Vogel/Light and Power FROM: Susan Joy, Development Review Engineer DATE: March 26, 2002 RE: REQUEST TO PLACE A SIDEWALK OVER A PORTION OF AN EASEMENT Attached for you review and comment is a sketch showing The Spanjer Office Building at the Cameron Park Subdivision located at the Northwest corner of Cameron Drive and College Avenue frontage road, with the portion of the utility and access easement that is proposed for overlap shaded in. The overlap is being requested in order to meet the city's sidewalk requirement along the fYontagc road while maintaining the existing 10' utility easement. Attached is a copy of the variance request from Northern Engineering Services and a vicinity map of the site. Please sign and return any continents to Susan Joy in the Development Review Center by Thursday, April 11, 2002. Uwe do not hear from you by this date, we will assume you have no objections to the proposed overlap. Please call Susan at 221-6750 if you have any questions. Thank You. No Problems Problems/Concerns as follows: /`: 4 �Aoac, OSfh11_0;Sll. (97(1)2)1.(60; • IA\iQ70)221_6,7ti �c�c�rA, gov Com MEMORANDUM TO: Rogcr Bullington!Watc+,'Wastcwatcr FROM: Susan .Ioy, Development Review Engineer DATE: March 26, 2002 RE: REQUEST TO PLACE A SIDEWALK OVER A PORTION OF AN EASEMENT Attached for you review and comment is a sketch showing The Spanjer Office Building at the Cameron Park Subdivision located at the Northwest corner of Cameron Drive and College Avenue frontage road, with the portion of the utility and access easement that is proposed for overlap shaded in. "fhe overlap is being requested in order to meet the city's sidewalk requirement along the frontage road while maintaining the existing 10' utility easement. Attached is a copy of the variance request from Northern Engineering Services and a vicinity map of the site. Please sign and return any comments to Susan Joy in the Development Review Center by Thursday, April 11, 2002. If we do not hear from you by this date, we will assume you have no objections to the proposed overlap. Please call Susan at 221-6750 if you have any questions. Thank You. —ia�Eroblems I r .. -= / ..✓ Problems/Concerns as follows: 281 No it!) Colleg., Avenue • P.O Box 580 • Port Coltin=_, CO 80522-0580 • (910) 221-6605 • FAX (970) 221-6378 www.fcgov.com FORT COLLINS LOVELAND WA"IF.R DISTRICT v 60 SOUn I FORT COLLNS SANrfATTON DISTRICT i April 10, 2002 Ms. Susan Joy City of Fort Collins P.O. Box 580 Fort Collins, CO 80525 RE: Request to place a sidewalk over a portion of an casement Spanjer Office Building Dear Ms.Jov, The Fort Collins - Loveland Water District and the South Fort Collins Sanitation District have reviewed the above mentioned request and submit the following comments. There are District water meter pits located within the easement. The meter pits cannot be located under the sidewalk or within 10 feet of landscaping, such as trees. The relocation of the meter pits must be done in accordance with District requirements and standards. Please do not hesitate to contact me at 226-3104, ext. 14, if you have any questions or require additional information. Respectfully, /%� �"� Mr.W. FarFarrill Systems Engineer xc: Mr. Michael D. DiTullio, District Manager 5150 Snead Drive, Fort Collins, CO 80525 Phone (970) 226-3104 Fax (970) 226-0186 APPROVED By: L Date: O2— ® City of Fort Collins Engineering Department Interoffice Memorandum Date: May 10, 2002 r� To: Cam McNair, City Engineer JCll�l Thru: Dave Stringer, Development Review Manager o From: Susan Joy, Development Review Engineer RE: Variance Request for the Spanjer Office Building Northern Engineering Services Inc., on behalf of the Developer for the Spanjer Office Building project, has submitted a variance request to the City of Fort Collins design standards. In accordance with detail 7-8F, the Developer is required to dedicate a 9' utility easement from the back of walk. The property in question is bordered on the east by the College Avenue Frontage Road (a modified Connector Local street with an attached walk) and the west by Cameron Drive (a Connector Local street). The variance is for overlapping the existing 10' utility and the proposed 6' attached sidewalk in order to preserve the platted site layout. This variance request was routed to the City's Light and Power, Stormwater, and Water/Wastewater departments, as well as PSCO/Excel, Qwest, AT&T, and the Fort Collins Water District. Only two utilities returned concerns, AT&T and the FCLWD. AT&T requires that two existing 2" PVC duct lines along the frontage road be relocated and the FCLWD requires that all District water meter pits be relocated behind the sidewalk and at least 10 feet away from landscaping, such as trees. Both of these items will be addressed at the Utility Coordination meeting to be scheduled prior to construction. No other utility or department had problems or concerns with granting this variance. It is my opinion that this variance can be supported based on the fact that the Utilities find it acceptable as long as their requirements are met and granting the overlapping utility easement and sidewalk will not adversely affect or harm the City of Fort Collins in any way. Please let me know if you have any questions or concerns and if you need any additional clarification. Sincerely, Susan Joy Enclosures