Loading...
HomeMy WebLinkAboutGAMBLE - Filed CS-COMMENT SHEETS - 2004-07-20PROJECT COMMENT SHEET City of Fort Collins Current PlanninE DATE: March 21, 2003 TO: Technical Services PROJECT: #15-03 GAMBLE SUBDIVISION REPLAT TYPE I (LUC) All comments must be received by Troy Jones no later than the staff review meeting: April , 2003 J Note - PLEASE identify your redlines for future reference Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape Project Comments Sheet Engineering Department City of Fort Collins Department: Engineering Date: April 16, 2003 Project: GAMBLE SUBDIVISION REPLAT -TYPE I (LUC) #15-03 All comments must be received by Troy Jones in Current Planning, no later than the staff review meeting: April 16, 2003 Note - Please identify your redlines for future reference Issue Contact: Katie Moore Topic: General Number: 8 Created: 4/16/2003 If access is to be taken off the alley, then the alley must be designed and constructed by this development from the property's frontage to a street. Number: 9 Created: 4/16/2003 More information is needed prior to plat approval due to the possible need for more specific easements; please submit 5 utility plan sets showing grading and utilities to the Engineering Department (Attn: Katie Moore). Topic: Plat Number: 3 Created: 4/15/2003 Please dedicate the standard utility easement: B' along the alley. No utility easement is needed along the street. Number: 4 Created: 4/15/2003 Please label the adjacent properties to the north and south. Number: 5 Please label the scale correctly. Created: 4/15/2003 Number: 6 Created: 4/15/2003 Please use the word "extinguished" in lieu of "vacated" when used in reference to old lot lines. Number: 7 Created: 4/15/2003 Please revise the statement of ownership to more closely reflect the City's standard wording. .G Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Repots Other_ Utility Redline Utility Landscape Page 1 Project Comments Sheet Selected Departments I...—r Department: Engineering Date: May 28, 2003 Project: GAMBLE SUBDIVISION REPLAT -TYPE I (LUC) #15-03 All comments must be received by Troy Jones in Current Planning, no later than the staff review meeting: June 04, 2003 Note - Please identify your redlines for future reference Issue Contact: Katie Moore Topic: Utility plans Number: 16 Created: 5/28/2003 Please provide a legal description below the title on the cover sheet. Number: 17 Created: 5/28/2003 Please provide two benchmarks from the City of Fort Collins Vertical Control. The City no longer uses the bonnet bolt survey. Number: 18 Please include the plat (for reference only) Created: 5/28/2003 Number: 19 Created: 5/28/2003 Please provide the indemnification statement on the cover sheet: utility plan checklist Item I.M. Number: 20 Please label the existing retaining wall. How tall is it? Created: 5/28/2003 Number: 21 Created: 5/28/2003 Please show the approximate limits of the street cut and add the note: Limits of street cut are approximate. Final limits are to be determined in the feld by the City Engineering Inspector. All repairs are to be in accordance with City street repair standards. Signature Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other Z Utility Redline Utility Landscape Page 1