Loading...
HomeMy WebLinkAboutLARIMER COUNTY CANAL NUMBER 2 AT COLLEGE AVENUE - Filed BC-BRIDGES & CULVERTS - 2009-04-07ARP s� ELE CP-EMS #4 REBAR W/ ALUM. CAP - - ----- M- - - ELEV.= 5027.72 - - - - N= 1,441,157.09 , E= 3,118,453.93� LINE TABLE CURVE TABLE LINE LENGTH BEARING CURVE I RADIUS LENGTH I TANGENT I CHORD CH BEARING DELTA L6 11.76 S00'09'42"E C5 3.00 2.501 1.331 2.43 S24'03'36"E 47'47'47" L7 3.99 S47'57'30"E C6 3.00 2.52 1.34 2.45 N23'51'45"W 48'11'30" L8 52.45 S00'14'00"W C7 10.00 5.60 2.87 5.53 N16'16'24"E 32'04'48" L9 4.31 S32'18'48"W CS 10.00 5.46 2.80 5.40 S16'39'27"W 31'18'41" L10 9.54 S01'00'06"W EX. FOOTHILLS FASHION MALL SIGN -- (- -I TO REMAIN APPROX. LOCATION OF ELE J :' r ElTELEPHONE LINE TO / REMAIN �1 IEEE- � % APPRO} ®� r OF EX., REMAIN w --LIMITS` OF ROCK AND EX. TREE TO ` _ V �CONSTRUC�TfON REMAIN X. VALVE BOX TO •\ E REMAIN (TYP.);�� v� EX. BUS SHELTER r TO REMAIN S +09 TOW i -L6 C5 STA=0+00.00 pC=0+11.76 N 1441133.15 E 3118427.87 PT=0+14.26 STA=0+10.00 BEGIN CONSTRUCTION CONCRETE APPROACH MATCH EXISTING WALK (BY OTHERS) TOW-5030.67 CP-FND PIN #4 REBAR W/ BROKEN OPC ILLEGIBLE ELEV= 5030.46 N= 1,441,068.64 E= 3,118.485.46 MATCH EX. TOP J LA. tiKIUGt ANU I �Im UT41+•01 w a BACK OF CURB HEADWALL TO REMAIN 52' LONG x 8' WIDE TOP OF OPENING = PEDESTRIAN BRIDGE 5029.36 P�P ,/SANITARY SEWER MANHOLE G i TO REMAIN - b031 66 CROSSING PLAN COLLEGE AVENUE (HWY. 287) UJ END PRE-ENGINEERED BRIDGE END CONSTRUCTION _ o P STA = 0+7 PVI STA = 0+84.82 P STA = 0+9 .14 ELEV = 5032.00 .87 PA ELE = 5031.88 ELEV = 5032 m P P 02 z Y o 0: _ > 0 0 n PRO IOSED TOP OF L 5032 + o w DEC r ® CENTERLINE _ zom Z A n Z- 0 11 Z W U .. 2 ~ .:. 0Q55 o_ .. --.. .� .. 5031 m�aa w ._ _. 1-4 5030CT I ; 1 EXISTING GROUNDit 5029 „ + ;it �..: I it I i I i it it 1 'it I it t U 5028 I, , � ) T it , II T it 5027 _IX PIER Gil - _.. :.. .. DEPTH.... ;! .... `+- ! ...,....I .. : _...... .... .. ..._ i.,. it O ..- -....(MINIM .....12' OFF OF '1 _. .,.. _ _ ...+ .. .... J. �,... j. ... .. - 5026 SHEET) ; 1 iif ' t ! v - 4 it it {.. it if 5025 if 41 11 HELIX PIER I II . ; j (MINIMUM DEP - - _4 II { I .. ,.f - 12' -OFF OF j j i t - SHEET) _ 5024ci _ _ t it _EXISTING"WING ALL ;------------ � h r ooTERsit 5023 !it zilt -. n __. . .. .. it _.,. ... .. CR _ .. .... _. SSI _ ._,.. G PR FILE _.- , .... ... 0 5022 cu 0+00 0+20 0+40 0+60 0+80 1+00 1+20 RIM ELEV.- , INV. N EUEV.=,:5017.78 , INV, S ELEV,= 5017.82 INV. W ELEV.= 501E 07 I s \� 1 j � HT/OF WAY �- �CONC,RETE APPI6, (By,/ / TO REMAIN .,� STA: 0+98.14 END CONSTRUCTION N 1441038.15 E 3118427.07 SEX. NO PARKING SIGN TO BE RELOCATED L EXISTING CURB & GUTTER TO REMAIN PT=0+88.59 CALL UTILITY NOTIFICATION CENTER OF COLORAD❑ H00=922=1987 CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. PROJECT NOTES: 10 5 0 10 20 SCALE 1" = 10' 1. THE BRIDGE SHALL BE 52.0' LONG, HAVE BICYCLE SAFE RAILS AND A 8.0' WIDTH (CLEAR BETWEEN THE RAILS). THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE ABUTMENT DIMENSIONS AND LAYOUT AND COORDINATING THE BRIDGE FABRICATION TO INSURE THAT THE BRIDGE WILL FIT PROPERLY ON THE ABUTMENTS. THE BRIDGE SHALL BE INSTALLED PRIOR TO POURING THE CONCRETE APPROACHES TO THE BRIDGE. THE BRIDGE SHALL BE PRE-ENGINEERED & MEET THE PROJECT SPECIFICATIONS. 2. EROSION CONTROL SHALL INCLUDE SILT FENCE ON THE EAST SIDE OF THE CONSTRUCTION ALONG THE IRRIGATION DITCH BANKS. 3. THE IRRIGATION DITCH SHALL BE KEPT FREE OF DEBRIS IN THE CONSTRUCTION AREA. 4. ALL DISTURBED AREAS SHALL HAVE 4" OF TOPSOIL REPLACED AND BE SEEDED PER CITY STANDARDS. EROSION CONTROL SHALL REMAIN UNTIL SEED IS ESTABLISHED. 5. IF THE DITCH BANKS ARE DISTURBED DURING ABUTMENT CONSTRUCTION, THEY SHALL BE RECONSTRUCTED TO A CONDITION BETTER THAN EXISTING CONDITION. THE SIDE SLOPES OF THE DITCH SHALL BE REPLACED WITH A MINIMUM OF 12" OF CLAY TO PREVENT SEEPAGE FROM THE DITCH. 6. SIDEWALKS SHALL BE 6" THICK. 7. BENCHMARK: ALL ELEVATIONS SHOWN ARE BASED ON AN ELEVATION TAKEN FROM FORT COLLINS BENCHMARK D322, 3 3/4" BRASS DISK STAMPED "USCGS D 322 RESET 1971", LOCATED IN BOX CULVERT SOUTH AND EAST OF COLLEGE AVENUE AND FOOTHILLS PARKWAY. ELEVATION= 5031.28 (UNADJUSTED 1929 DATUM) 8. EXISTING CURB & BOX STRUCTURE SHALL BE PROTECTED IN PLACE. 9. ALL WORK RELATING TO REMOVAL OF EXISTING SIDEWALK AND CONSTRUCTION OF NEW CONCRETE APPROACHES SHALL BE PERFORMED BY OTHERS, UNLESS OTHERWISE NOTED. 10. REFER TO SHEET 6 FOR BRIDGE FOUNDATION DETAILS. 11. THE MINIMUM VERTICAL CLEARANCE BETWEEN THE TOP OF THE EXISTING WINGWALLS AND THE BOTTOM OF THE PROPOSED PEDESTRIAN BRIDGE SHALL BE 6". General Notes LARIMER COUNTY CANAL No. 2 PLAN APPROVAL Title Date 1. All materials, workmanship, and construction of public improvements shall meet or exceed the standards and specifications set forth in the Lorimer County Urban Area Street Standards and applicable state and federal regulations. Where there is conflict between these plans and the specifications, or any applicable standards, the most restrictive standard shall apply. All work shall be inspected and approved by the Local Entity. 2. The type, size, location and number of all known underground utilities are approximate when shown on the drawings. It shall be the responsibility of the Contractor to verify the existence and location of all underground utilities along the route of the work before commencing new construction. 3. If a conflict exists between existing and proposed utilities and/or a design modification is required, the Contractor shall coordinate with the engineer to modify the design. Design modification(s) must be approved by the Local Entity prior to beginning construction. 4. The Contractor shall be responsible for all aspects of safety including, but not limited to, excavation, trenching, shoring, traffic control, and security. Refer to OSHA Publication 2226, Excavating and Trenching. 5. If, during the construction process, conditions are encountered which could indicate a situation that is not identified in the plans or specifications, the contractor shall contact the Designer and the Local Entity Engineer immediately. 6. Damaged curb, gutter and sidewalk existing prior to construction, as well as existing fences, trees, streets, sidewalks, curbs and gutters, landscaping, structures, and improvements destroyed, damaged or removed due to construction of this project, shall be replaced or restored in like kind at the Contractors expense, unless otherwise indicated on these plans, prior to the acceptance of completed improvements. 7. When on existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be documented by the Local Entity Construction Inspector before any cuts are made. Patching shall be done in accordance with the Local Entity Street Repair Standards. The finished patch shall blend in smoothly into the existing surface. All large patches shall be paved with an asphalt lay -down machine. In streets where more than one cut is made, an overlay of the entire street width, including the patched area, may be required. The determination of need for a complete overlay shall be made by the Local Entity Engineer and/or the Local Entity Inspector at the time the cuts are made. 8. Upon completion of construction, the site shall be cleaned and restored to a condition equal to, or better than, that which existed before construction, or to the grades and condition as required by these plans. 9. At all times during construction, the Contractor shall be responsible for preventing and controlling on -site erosion due to wind and runoff, as well as vehicle tracking. avr� vnu�XPAtt m NSION oncn 0nsrawJOsiauctwcs. EINT SIDEWALK DETAIL LAREIM COUNTY CONSTRUCTION REVISION NO: 1 DRAIIING URBAN AREA DRAWINGS STREET STANDARDS DATE: 09/02/01 1602 Z O �LO LID O (fl co O � 0 O N 00 N 0 0 00 }� E0r T V O L O c) rY� 3 N C O �v O C O X O�§ELT O Li Q Z O (n LIJ IN 1 O Ln O O II In 4 c 0 0 V o o 0 N 0 WZZ 0 Q Q �WQ �_J Z MZV o0 Q I �aZ0o /-�WDZI� V/ 0 0 < 0 W W 0 > W -i rr u a. 0 W 02 cr a J SHEET 5 .Job No. 203-04 Z G - I F i i