Loading...
HomeMy WebLinkAboutWOODWEST THIRD - Filed OA-OTHER AGREEMENTS - 2004-03-18lc THIS AGUZ T, ,riade and entered into this > > t h day of August A. D. 19 72 y by and beinwcen Till CITY G? CPLT GOLL1i\TS, a municipal Corporation, hC ein ter designated as firsv paLuy, and hereinafter designated as seco,,(. party, L`�T IliJ.S L'Tii: Wiiis`IE:. S, second party has heretofore submitted a subdivision plat of the subdivision to be known as WOODWEST, THIRD FILING lFor approval by the 1•unicilOal :.anning and Zc)ning j3oard and the City Council of the City of Port Collins, and VdIE EELS, said subdivision plat is acceptable to first party and first p.^artyls Planning and Zoning Board, subject to CDnstVUc V'10:, 02 utilities in the area to be subciivided, ii GV•J, THEREFCL-E, in c0nsi6era"t-" c)a of the promises and t .e ter,-; of this agreement, it is mutually agreed as follows. 1. First party agrees that said subdivision plat shall Joy and the same is hereby approved. 2,-In consideration of the approval of said plat by first party, and first party's .lanning and 'Zoning Board, second partiy agrees as follows: (A) To submit to first party the following detailed improvement plans, acceptable to the first party: (1) A plan of the proposed grater distribution system including the Connecting pipei.ines to `i::ie points of co'anecti.o''a to t}:e f1rSt party is e_,isting water distribution system a'rd sll ow:1, g a1i Va.:.'.':;s and fire hydrants. (2) Plans and profiles of the proposed sanitary surer system including all Rklnholes and Connec'U-ions to the first party's existing sanitary sewer system. (3) A plan of the proposed electrical distribution sy5td:�: including connecting lilies to the first 'paruyls existing electrical distribution system and including all Street lights. (1t) Plans and profiles of all street improvements. (5) Plans and profiles of the proposed street drain.go system showing the connections to the first party's storm sewer system and including ail storm sewer inlets and manholes. If a storm sewer outfail line is not available, second party agrees to join into a special inprove- meat district for the installation of such outfail line upon request there or by first party and to sign any petition and perform any other act necessary to font such district. (6) Items A (1) to A (S) inclusive are to be financed by the ,arty of the second part, excepting only Item (3) electrical distribution system. All material required for street lights are to be paid for by the party of the second part to the Light I Power Department of the City. in the event the City of Fort Collins shall require larger wooer mains, sanitary sewer mains or storm sewer ;rains to be constructed wiw in the subdivision than would be required by standard engineering practices to serve the subdivision, in order to properly extend these services to Other areas, the City of Fort Collins Will pay a portion or the cost of SAC.: enlarged facility based o; proration of the cost of the facility actnally constructed and the estimated cost of such facility as shown on the suL- W vioer's approved plan. Such proration of costs between the City of Fort Collins and the subdivider shall be determlaed in advance of co structio.. by the City Engineer and in tic event of any dispute this matter shall be submitted to the City Council for final determination. IN WIThNESS WKEREOP, first party has caused these presents to be signed by its Mayor and its corporate seal. to be Thereto affixed attest to by its City Clerk, pursuant to motion of the Council of the City of Port Collins dated the J co day of A. U. , 19 7_ and second party has hereto set his hand and sea;. the day and year first hereinabove written. ATT ST: City Clerk By: APPROVED: C.ily I!n��ini"t• TEE CITY OF PORT COLLINS A Municipal Corporation //7 By 1; A (� Mayor First Party TRI-CITY DEVELOPMENT CO Partnership 00;t IRO17n 07ES,nINfi P , a Limited General Partner _(S:AL)' a r y