HomeMy WebLinkAboutVILLAGE EAST REPLAT LOTS 12-17 - Filed OA-OTHER AGREEMENTS - 2004-03-10AGREEMENT
'PHIS AGREF7MT-NT is made and entered into this OYU day of 43;�qp ,
A.D. 19:17, by and between THE CITY OF FORT COLLINS, COLORADO, a municipal
corporation, hereinafter sometimes designated as the "City", and Bartran
Homes Incorporated hereinafter designated as the "Developer",
WITNESSLTH:
WHEREAS, Developer is the owner of:
VILLAGE EAST, SECOND FILING and REPLAT OF LOTS 12, 13, 14, 15, 16,
and 17, VILLAGE EAST, FIRST FILING, situate in the south z of
Section 25, T 7N, R 6 9 W of the sixth P.M., City of Fort Collins,
County of Larimer, State of Colorado.
more particularly described on the subdivision plat on file in the City Engineer's
Office and by this reference made a part hereof; and
wTiEREA.S, Developer desires to develop said property as a residential
subdivision and has submitted to the City a utility plan for said lands, a copy
of which is on file in the City Engineer's Office and by this reference made a
part hereof; and
WHERFAS, the parties hereto have agreed that the development of said
lands will require increased municipal services from the City in order to
serve such area and will further require the installation of certain improvements
primarily of benefit to the lands to be developed and not to the City of Fort
Collins as a whole; and
NOW, THEREFORE, in consideration of the premises and the terms and conditions
herein stated and for other valuable consideration, the adequacy of which is
acknowledged by the parties hereto, it is agreed as follows:
1. Except as otherwise herein specifically agreed, IYie Developer agrees
to install and pay for all utility lines, storm drainage facilities, streets
and other municipal facilities necessary to serve the lands described on the
subdivision plat.
2. Water Lines.
a. Developer agrees to install all water lines as shown on the utility
plans in accordance with the requirements and as shown on said plans, whether
such lines are actually on the property, bordering the property or on other
lands connecting the subject property to the existing City water_ distribution
system.
b. Such water lines shall be installed in full compliance with the
standard specifications of the City on file in the office of the City Engineer
relating to the Installation of such lines.
c. Developer agrees to complete the installation of said lines no later
than June 1, 1978.
d. Developer understands and agrees that no building permit for any
structure in the subdivision shall be issued by the City until the fire hydrant
serving such structure is installed and accepted by the City.
e. All of said lines shall be installed at the sole expense of the
Developer.
f. The installation of said lines shall be inspected by the Engineering
Services Department of the City and shall be subject to such department's
approval. Developer agrees to correct any cleficiencies in such installation in
order to meet the requirements of the plans and the specifications applicable
to such installation. In the event such installation is not completed and
approved within the time set forth above, the City shall have the right to
cause such additional work to be done as it deems necessary to complete the
-2-
installation in a satisfactory manner and the Developer shall be liable for the
costs of such additional work.
3. Sanitary Sewer Collection Lines.
a. The Developer agrees to install all sanitary sewer collection lines
shown on the utility plans whether the sane be on or off the subject property.
b. Such sanitary seer lines shall be installed in full compliance
with the standard. specifications of the City on file in the office of the
City Engineer relating to the installation of such lines.
c. Developer agrees to complete the installation of said lines no later
than June 1, 1978.
d. Developer understands and agrees that no building permit shall
be issued by the City for any structure in the subdivision until the sanitary
sewer line serving such structure is installed and accepted by the City.
e. A11 of said lines shall be installed at the sole expense of the
Developer.
f. The installation of said lines shall be, inspected by the Engineering
Services Department of the City and subject to such depa rtrnent's approval.
Developer agrees to correct any deficiencies in such installation in order
to meet the requirements of the plans and the specifications applicable to
such installation. In the event such installation is not completed and approved
within the tine set forth above, the City shall have the right to cause such
additional work to be done as it deems necessary to complete the installation
in a satisfactory manner and the Developer shall be liable for the costs of
such additional work.
-3-
4. Electric Lines and Facilities.
a. The City Light and Power Department shall install all electric
distribution lines and facilities required for the subject property and the
Developer shall pay for such work in accordance with the established charges
of the Light and Poorer Department
lights required for the development
Such installation shall include all street
5. Storm Sewer Lines and Facilities.
a. The Developer shall install all storm sewer lines and facilities
shown on the utility plans.
b. Such storm sewer lines and facilities shall be installed in full
compliance with the standard specifications of the City on file in the office
of the City Engineer relating to the installation of such lines.
c. Developer agrees to =nplete the installation of said lines and
facilities in an orderly fashion during the process of develolxrent so as to assure
that the health, safety, welfare, and property of the City and citizens is
safeguarded and protected through the proper control and drainage of storm waters.
d. All of said lines shall be installed at the sole expense of the
Developer..
e. The installation of all of such lines and facilities shall be
inspected by the Engineering Services Department of the City and shall be subject
to such department's approval. Developer agrees to correct any deficiencies
in such installation in order to meet the requirements of the plans and the
specifications applicable to such installation. In the event such installation
is not completed and approved within the time set forth above, the City shall
have the right to cause such additional work to be clone as it deems necessary to
complete the installation in a satisfactory manner and the Developer shall be
liable for the cast of such additional work.
150
6. Streets.
a. The Developer agrees to install all streets shown on the utility
plan, complete with asphalt paving, curb, gutter and sidewalks.
b. Such streets shall be installed in full compliance with the standard
specifications of the City on file in the office of the City Engineer relating to
the installation of such lines.
c. Developer agrees to complete the installation of street improvements
no later than .Lune 1, 1978.
d. No building permit for the constnicti.on of any structure in the sub-
division shall be issued by the City until the street providing access to the
structures is improved with at least the gravel base required.
e. The installation of all streets shall be inspected by the Engineering
Services Department of the City and subject to such department's approval.
Developer agrees to correct any deficiencies in such installation in order to
meet the requirements of the plans and the specifications applicable to such
installation. In the event the improvements are not completed and approved within
the time set forth above, the City shall have the right to cause such additional
work to be done as it deems necessary to complete the installation in a satis-
factory manner and the Developer shall be liable for the cost of such additional
work, including al.l normal charges made by the City for financing, engineering,
publication, legal and miscellaneous on City Special. Street Improvement Districts.
f. Street Improvements shall not be i.nstallcd until all utility lines to
be placed in the street have been completely installed and all services to
individual lots have been installed from main utility lines to the property
line.
-5-
7. other Requirements.
None.
This agreement shall be binding upon the parties hereto, their heirs,
personal representatives and assigns.
IN WITNESS MIERFOF, the parties hereto have caused this agreement to be
signed the day and year first hereinabove written.
ATTEST:
City Clerk
APPROVED:
TE CITY OF FORI' COLLINS, COLORADO
]3y
City Manager
IJ
D veloper Title
-6-