HomeMy WebLinkAboutTOWER SHOPPES PUD - Filed DA-DEVELOPMENT AGREEMENT - 2004-03-04DEVELOPMENT AGREEMENT
THIS AGREEMENT, made and entered into this—_l_day of T
199 > by and between the CITY OF FORT COLLINS, COLORADO, a
Municipal Corporation, hereinafter referred to as the "City"; and
TIMBERLINE PARTNERS LIMITED, a Colorado limited partnership,
hereinafter referred to as the "Developer".
WITNESSETH:
WHEREAS, the Developer is the Owner of certain property
situated in the County of Larimer, State of Colorado, (hereafter
referred to as the "Property") and legally described as follows, to
wit:
TOWER SHOPPES P.U.D., LOTS 1 AND 3, a Tract of land located in
the Southwest Quarter of Section 29, Township 7 North, Range
68 West of the 6th P.M., City of Fort Collins, County of
Larimer, State of Colorado.
WHEREAS, the Developer desires to develop the Property and has
submitted to the City a subdivision plat and/or a site plan and
landscape plan, a copy of which is on file in the office of the
Director of Engineering and made a part hereof by reference; and
WHEREAS, the Developer has further submitted to the City
utility plans for the Property, a copy of which is on file in the
office of the Director of Engineering and made a part hereof by
reference; and
WHEREAS, the parties hereto have agreed that the development
of the Property will require increased municipal services from the
City in order to serve such area and will further require the
installation of certain improvements primarily of benefit to the
lands to be developed and not to the City of Fort Collins as a
whole; and
WHEREAS, the City has approved the subdivision plat and/or
site plan and landscape plan submitted by the Developer subject to
certain requirements and conditions which involve the installation
of and construction of utilities and other municipal improvements
in connection with the Property.
NOW, THEREFORE, in consideration of the promises of the
parties hereto and other good and valuable consideration, the
receipt and adequacy of which is hereby acknowledged, it is agreed
as follows:
EXHIBIT "B"
NOT APPLICABLE
owe]
City of Fort Collins, Colorado
DEVELOPMENT CONSTRUCTION PERMIT
' !, ; _,jf
Permit Number: _ Issuance Date:
Project Name: rower Shoppes PUD
Project A.K.A.:
Project Location: NE Corner of Horsetooth Road And Timberline Road
Permittee: Michael Blank Rincon Development. Inc. (303) 442-8687
Citv and developer contacts: See attached F_xhibit "A"for names and phone numbers of all
contact persons for this project.
Fees: Permit Application Fee ($150.00 - small project) $150.00
Construction Inspection Fee (paid prior to issuance of this permit) 1$ 80.00
Total $ 330.00
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$ 5,500.00
Form of security deposited with the City: ('I
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
l . The Pcrmittee shall be responsible to require their Project Engineer to incorporate into all
design drawings and specifications the certification of all materials testing by an Engineer. The
Pcrmittee shall have an Engineer prepare revised design drawings and secure City approval for
all revisions to the Utility Plans and related documents. The Permitter shall have an Engineer
represent, as required by the City in the Development Agreement, that the improvements arc
constructed in conformance with the approved Utility Plans and the standards and specifications
of the City. The Permitter shall provide "as -constructed" plans prepared by an Engineer prior to
the C'ity's acceptance of the constructed public improvements. (All references above to the terms
"Project I?nginccr" and "Engineer" shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in
conformance with City requirements.
3. Construction time restri
4. The applicant understands that additional permits may be required for this development
project and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design,
traffic study, drainage report, plat easements and any other official documents), shall be kept on
the development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use
Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration
date. Such application shall contain information sufficient to justify the granting of the
extension. An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions
contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or
Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable,
are met. If the Development Agreement does not specify times for completion of public
improvements, or if there is no Development Agreement, then the improvement requirements
specified in Section 24-95 of the City Code shall apply, which provides that construction of all
improvements shall be required prior to the time of issuance of the first building permit .
R. Acceptance by the City of the public improvements shall be after (1) final inspection has
been conducted by the City ; (2) punch list items from the final inspection are completed and
accepted by the City; and (3) required certifications from the licensed professional engineer that
improvements are completed to City standards, specifications and approved Utility Plans; and the
"as -constructed" plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the
City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the
Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of
the Land Use Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty four (24) hours prior to
any planned constriction on this project. All required perimeter silt fencing and other
erosion/sediment control best management practices (BMP's) that can be installed prior to
construction must be in place and inspected by the City Erosion Control Inspector before any
land disturbing activity begins.
11. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
12. Other conditions:
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of
the owners of the property (including all owners having legal or equitable interest in the real property,
as defined in Section 1-2 of the City Code; and including common areas legally connected to or
associated with the property which is the subject of this application) without whose consent and
authority the requested action could not lawfully be accomplished. Pursuant to said authority. I hereby
Permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter
upon such properly to perform work required of the applicant if the applicant were to fail to perform
the required work. I also acknowledge that I have read this permit document with all its requirements
and conditions, and I agree to all of the terms and conditions so stated in this permit.
Applicant/ Proiect Manager's
Approval for issuance:
� r
City lingineerApproval: �..
C:t;� Date.
r i
(Permit Issuance Date)
EXHIBIT "A"
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name: Tower Shoppes PUD
Project A.K.A.:
City Staff Contact Persons:
Development Engineer: Sheri Wamhoff
281 N. College Avenue, Fort Collins, Co 80524
(970) 221-6750 x7140
Construction Inspector: Rhonda Henson
281 N. College Avenue, Fort Collins, Co 80524
(970) 221-6605
Cell (970) 217-4089
Current Planner: Ted Shepard
281 N. College Avenue, Fort Collins, Co 80524
(970)221-6750
Water Utilities Engineer: Roger Buffington
700 Wood Street, Fort Collins, Co 80521
(970)221-6681
Erosion Control Inspector: Bob 7ackley
700 Wood Street, Fort Collins, Co 80521
(970)224-6063
Natural Resources: Kim Kreimeyer
281 N. College Avenue, Fort Collins, Co 80524
(970)221-6641
Traffic Operations: Eric Bracke
625 Ninth Street, Fort Collins, Co 80524
(970) 224-6062
Street closures: Syl Mireles
625 Ninth Street, Fort Collins, Co 80524
(970)221-6815
Transportation Planning: Kathleen Reavis
210 E. Olive, Fort Collins, Co 80524
(970)224-6140
Forestry: Tim Buchanan
281 N. College, Fort Collins, Co 80524
(970)221-6361
Light and Power: Doug Martine
700 Wood Street, Fort Collins, Co 80521
(970)224-6152
Developer's Contact Person:
Project Manager:
Michael Blank
Rincon Development, Inc.
4875 Pearl E. Circle #300
Boulder, Co 80301
(303)442-8687
Fax (303) 442-8757
Developer: William W. Reynolds
Timberline Partners Ltd. LLLP
4875 Pearl E. Circle #100
Boulder, Co 80301
(303) 442-8687
Fax (303) 442-8757
Owner(s): William W. Reynolds
Timberline Partners Ltd. LLLP
4875 Pearl E. Circle #300
Boulder, Co 80301
(303) 442-8687
Fax (303) 442-8757
Architect/Planner:
Project Engineer:
General Contractor:
Stan Meyers
Sear Brown Group
209 South Meldrum
Fort Collins, Co 80521
(970) 482-5922
Michael Blank
Rincon Development, Inc.
4875 Pearl E. Circle 9300
Boulder, Co 80301
(303) 442-8687
Fax (303) 442-8757
TOWER SHOPPES P.U.D.
DESCRIPTION
PUBLIC IMPROVEMENTS
FIRE HYDRANT
LANDSCAPING
PRIVATE IMPROVEMENTS
LANDSCAPING
U.M. QUAN. COST COST UNIT FEE TOTAL
EXTENSION INSPECTION
EA 1 5500 $5,500.00
SF 12273 2.25 $27,613.13
SF
TOTAL INSPECTION FEE
TOTAL COST OF IMPROVEMENTS
600 2.25 $1,350.00
$34,463.13
180 $180.00
$180.00
f -1
0
J
IV2
I 7
1
�
V
T
a
I
�
�
o
o
�
I
ui
W
w
0
o
R
�
I
d
i
OV0N 3Nna3ewu
di 03NOZ
l.11 0 1f1V 213MOd 213A1a 3210f10d
TOWER SHOPPES P.U.D.
TASK
INSTALL FIRE HYDRANT
LANDSCAPING
PUBLIC IMPROVEMENTS COMPLETION SCHEDULE
NOV.22 NOV.29 DEC.6 DEC.13
XXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
DEVELOPMENT AGREEMENT
THIS AGREEMENT, is made and entered into this 1I7-N day of PECs, ,,c
2005, by and between the CITY OF FORT COLLINS, COLORADO, a Municipal
Corporation, hereinafter referred to as the "City"; and William David Beard Jr. and
Susan M. Beard, individuals, hereinafter referred to as the "Developer."
WITNESSETH:
WHEREAS, the Developer is the owner of certain real property situated in the
County of Larimer, State of Colorado, (hereafter sometimes referred to as the "Property"
or "Development") and legally described as follows, to wit:
Tower Shoppes P.U.D., Lot 4 (Sonic Drive -In), located in Section 29, Township 7
North, Range 68 West of the 6th P.M., City of Fort Collins, County of Larimer,
State of Colorado.
WHEREAS, the Developer desires to develop the Property and has submitted to
the City all plats, plans (including utility plans), reports and other documents required for
the approval of a final plan according to the City's development application submittal
requirements master list (the "Final Development Plan Documents") copies of which are
on file in the office of the City Engineer and made a part hereof by reference; and
WHEREAS, the parties hereto have agreed that the development of the Property
will require increased municipal services from the City in order to serve such area and
will further require the installation of certain improvements primarily of benefit to the
lands to be developed and not to the City of Fort Collins as a whole; and
WHEREAS, the City has approved the Final Development Plan Documents
submitted by the Developer subject to certain requirements and conditions, which
involve the installation of and construction of utilities and other municipal improvements
in connection with the Property.
NOW, THEREFORE, in consideration of the promises of the parties hereto and
other good and valuable consideration, the receipt and adequacy of which are hereby
acknowledged, it is agreed as follows:
I. General Conditions
A. The terms of this Agreement shall govern all development
activities of the Developer pertaining to the Property. For the
purposes of this Agreement, "development activities" shall include,
but not be limited to, the following: (1) The actual construction
of improvements, (2) Obtaining a building permit therefor, or (3)
Any change in grade, contour or appearance of said property caused
by, or on behalf of, the Developer with the intent to construct
improvements thereon.
B. All water lines, sanitary sewer collection lines, storm
sewer lines and facilities, streets, curbs, gutters, sidewalks, and
bikepaths shall be installed as shown on the approved utility plans
and in full compliance with the Council -approved standards and
specifications of the City on file in the office of the Director of
Engineering at the time of approval of the utility plans relating
to the specific utility, subject to a three (3) year time
limitation from the date of execution of this Agreement. In the
event that the Developer commences or performs any construction
pursuant hereto after three (3) years from the date of execution of
this agreement, the Developer shall resubmit the project utility
plans to the Director of Engineering for reexamination. The City
may require the Developer to comply with approved standards and
specifications of the City on file in the office of the Director of
Engineering at the time of resubmittal.
C. No building permit for the construction of any structure
within the development shall be issued by the City until the water
lines, fire hydrants, sanitary sewer lines and streets (including
curb, gutter and sidewalk and pavement with at least the base
course completed) serving such structure have been completed and
accepted by the City. Notwithstanding the foregoing, the Developer
shall be entitled to receive a footing and foundation permit for
the construction of improvements within the development upon the
installation of access to provide fire protection and other
emergency services to the site during construction. Adequate water
lines and fire hydrants shall be installed prior to the Developer
being allowed to place combustible materials on the site. All such
access (temporary or permanent) completed prior to footing and
foundation permit and water lines and fire hydrants (temporary or
permanent) completed prior to the placement of combustible material
on the site s:2all be accepted by the Director of Engineering. No
building permits shall be issued for any structure located in
excess of nine hundred feet (9001) from a single point of access.
D. Any water lines, sanitary sewer lines, storm drainage
lines, and/or streets described on Exhibit "A," attached hereto,
shall be installed within the time and/or sequence required on
Exhibit "A." If the Director of Engineering has determined that
any water lines, sanitary sewer lines, storm drainage facilities
and/or streets are required to provide service or access to other
2
I. General Conditions
A. The terms of this Agreement shall govern all development activities of the
Developer pertaining to the Property. For the purposes of this Agreement,
"development activities" shall include, but not be limited to, the following: (1) the actual
construction of improvements, (2) obtaining a permit therefor, or (3) any change in
grade, contour or appearance of the Property caused by, or on behalf of, the Developer
with the intent to construct improvements thereon.
B. All water lines, sanitary sewer collection lines, storm sewer lines and
facilities, streets, curbs, gutters, sidewalks, and bikepaths shall be installed as shown on
the Final Development Plan Documents and in full compliance with the standards and
specifications of the City on file in the office of the City Engineer at the time of approval
of the utility plans relating to the speck utility, subject to a three (3) year time limitation
from the date of approval of the site specific development plan. In the event that the
Developer commences or performs any construction pursuant hereto after the passage
of three (3) years from the date of approval of the site specific development plan, the
Developer shall resubmit the utility plans to the City Engineer for reexamination. The
City may then require the Developer to comply with the approved standards and
specifications of the City on file in the office of the City Engineer at the time of the
resubmittal.
C. No building permit for the construction of any structure within the Property
shall be issued by the City until the public water lines and stubs to each lot, fire
hydrants, electrical lines, sanitary sewer lines and stubs to each lot, and public streets
(including curb, gutter, and pavement with at least the base course completed) serving
such structure have been completed and accepted by the City. No building permits
shall be issued for any structure located in excess of six hundred and sixty feet (660')
from a single point of access, unless the structures contain sprinkler systems that are
approved by the Poudre Fire Authority.
D. Any water lines, sanitary sewer lines, storm drainage lines, electrical lines,
and/or streets described on Exhibit 'A," attached hereto, shall be installed within the
time and/or sequence required on Exhibit "A." If the City Engineer has determined that
any water lines, sanitary sewer lines, storm drainage facilities and/or streets are
required to provide service or access to other areas of the City, those facilities shall be
shown on the Final Development Plan Documents and shall be installed by the
Developer within the time as established under "Special Conditions" in this document.
E. Except as otherwise herein specifically agreed, the Developer agrees to
install and pay for all water, sanitary sewer, and storm drainage facilities and
appurtenances, and all streets, curbs, gutters, sidewalks, bikeways and other public
improvements required by this Development as shown on the Final Development Plan
Documents and other approved documents pertaining to this Development on file with
the City.
2
F. Street improvements shall not be installed until all utility lines to be placed
therein have been completely installed, including all individual lot service lines (water
and sewer) leading in and from the main to the property line and all electrical lines.
G. The installation of all utilities shown on the Final Development Plan
Documents shall be inspected by the Engineering Department of the City and shall be
subject to such department's approval. The Developer agrees to correct any
deficiencies in such installations in order to meet the requirements of the plans and/or
specifications applicable to such installation. In case of conflict, the Final Development
Plan Documents shall supersede the standard specifications, except that if the conflicts
are a result of Federal or State mandated requirements, then the Federal or State
mandated requirements shall prevail.
H. Public easements shall be provided for access, utilities and drainage as
required by the design and location of such infrastructure and as reflected on the plans.
Alignment and grades on privately maintained streets and drives shall allow for safe
access, ingress and egress by owners, visitors, the general public and public safety
officials and equipment, as approved by the City Engineer.
I. All storm drainage facilities shall be so designed and constructed by the
Developer as to protect downstream and adjacent properties against injury and to
adequately serve the Property (and other lands as may be required, if any). The
Developer shall meet or exceed the minimum requirements for storm drainage facilities
as have been established by the City in its Drainage Master Plans and Design Criteria.
The Developer, for itself and its successor(s) in interest, does hereby indemnify and
hold harmless the City from any and all claims that might arise, directly or indirectly, as
a result of the discharge of injurious storm drainage or seepage waters from the
Property in a manner or quantity different from that which was historically discharged
and caused by the design or construction of the storm drainage facilities, except for (1)
such claims and damages as are caused by the acts or omissions of the City in
maintenance of such facilities as have been accepted by the City for maintenance; (2)
errors, if any, in the general concept of the City's master plans (but not to include any
details of such plans, which details shall be the responsibility of the Developer); and (3)
specific written or otherwise documented directives that may be given to the Developer
by the City. The City agrees to give notice to the Developer of any claim made against
it to which this indemnity and hold harmless agreement by the Developer could apply,
and the Developer shall have the right to defend any lawsuit based on such claim and to
settle any such claim provided Developer must obtain a complete discharge of all City
liability through such settlement. Failure of the City to give notice of any such claim to
the Developer within ninety (90) days after the City first receives a notice of such claim
under the Colorado Governmental Immunity Act for the same, shall cause this indemnity
and hold harmless agreement by the Developer to not apply to such claim and such
failure shall constitute a release of this indemnity and hold harmless agreement as to
such claim. Approval of and acceptance by the City of any storm drainage facility
design or construction shall in no manner be deemed to constitute a waiver or
relinquishment by the City of the aforesaid indemnification. The Developer shall engage
3
a Colorado licensed professional engineer to design the storm drainage facilities as
aforesaid and it is expressly affirmed hereby that such engagement shall be intended
for the benefit of the City, and subsequent purchasers of property in the Development.
J. The Developer shall pay storm drainage basin fees in accordance with
Chapter 26, Article VII of the City Code. Storm drainage improvements eligible for
credit or City repayment under the provisions of Chapter 26 are described together with
the estimated cost of the improvements on the attached Exhibit "B," which
improvements, if applicable, shall include right-of-way, design and construction costs.
See Section II.C, Special Conditions, Storm Drainage Lines and Appurtenances, for
specific instructions.
K. The Developer shall provide the City Engineer with certified Record Plan
Transparencies on Black Image Diazo Reverse Mylars upon completion of each phase
of the construction. Utilities will not be initially accepted prior to as -built drawings being
submitted to and approved by the City of Fort Collins.
L. The Developer specifically represents that to the best of its knowledge all
property dedicated (both in fee simple and as easements) to the City associated with
this Development (whether on or off -site) is in compliance with all environmental
protection and anti -pollution laws, rules, regulations, orders or requirements, including
solid waste requirements, as defined by the U. S. Environmental Protection Agency
Regulations at 40 C.F.R., Part 261, and that such property as is dedicated to the City
pursuant to this Development, is in compliance with all such requirements pertaining to
the disposal or existence in or on such dedicated property of any hazardous
substances, pollutants or contaminants, as defined by the Comprehensive
Environmental Response Compensation and Liability Act of 1980, as amended, and
regulations promulgated thereunder. The Developer, for itself and its successor(s) in
interest, does hereby indemnify and hold harmless the City from any liability whatsoever
that may be imposed upon the City by any governmental authority or any third party,
pertaining to the disposal of hazardous substances, pollutants or contaminants, and
cleanup necessitated by leaking underground storage tanks, excavation and/or backfill
of hazardous substances, pollutants or contaminants, or environmental cleanup
responsibilities of any nature whatsoever on, of, or related to any property dedicated to
the City in connection with this Development, provided that such damages or liability are
not caused by circumstances arising entirely after the date of acceptance by the City of
the public improvements constructed on the dedicated property, except to the extent
that such circumstances are the result of acts or omissions of the Developer. Said
indemnification shall not extend to claims, actions or other liability arising as a result of
any hazardous substance, pollutant or contaminant generated or deposited by the City,
its agents or representatives, upon the property dedicated to the City in connection with
this Development. The City agrees to give notice to the Developer of any claim made
against it to which this indemnity and hold harmless agreement by the Developer could
apply, and the Developer shall have the right to defend any lawsuit based on such claim
and to settle any such claim provided the Developer must obtain a complete discharge
of all City liability through such settlement. Failure of the City to give notice of any such
4
claim to the Developer within ninety (90) days after the City first receives a notice of
such claim under the Colorado Governmental Immunity Act for the same, shall cause
this indemnity and hold harmless agreement by the Developer to not apply to such
claim and such failure shall constitute a release of this indemnity and hold harmless
agreement as to such claim.
M. The Developer acknowledges and agrees that the City, as the owner of
any adjacent property (the "City Property") on which off -site improvements may be
constructed, or that may be damaged by the Developer's activities hereunder, expressly
retains (and does not by this Development Agreement waive) its rights as property
owner. The City's rights as owner may include without limitation those rights
associated with the protection of the City Property from damage, and/or the
enforcement of restrictions, limitations and requirements associated with activities on
the City Property by the Developer as an easement recipient.
II. Saecial Conditions
A. Water Lines
Not Applicable
B. Sewer Lines
Not Applicable
C. Storm Drainage Lines and Appurtenances
1. All on -site and off -site storm drainage improvements associated
with this Development, as shown on the Final Development Plan Documents, shall be
completed by the Developer in accordance with said Final Development Plan
Documents prior to the issuance any certificate of occupancy. Completion of
improvements shall include the certification by a professional engineer licensed in
Colorado that the drainage facilities which serve this Development have been
constructed in conformance with said Final Development Plan Documents. Said
certification shall be submitted to the City at least two weeks prior to the issuance of any
certificate of occupancy in this Development.
2. The Developer shall be responsible for maintaining the structural
integrity and operational functions of all drainage facilities throughout the build -out of
this Development. If at any time following certification (as required pursuant to
paragraph one (1) above) of said drainage facilities and during the construction of
structures and/or lots within this Development the City reasonably decides that said
drainage facilities no longer comply with the Final Development Plan Documents, the
City shall give written notice to the Developer of all items which do not comply with the
Final Development Plan Documents. Unless the Developer successfully appeals the
5
decision of non-compliance, it shall bring such facilities back up to the standards and
specifications as shown on the Final Development Plan Documents. Failure to maintain
the structural integrity and operational function of said drainage facilities following
certification shall result in the withholding of the issuance of additional building permits
and/or certificates of occupancy until such drainage facilities are repaired to the
operational function and structural integrity which was approved by the City.
3. The Developer agrees to provide and maintain erosion control
improvements as shown on the Final Development Plan Documents to stabilize all over -
lot grading in and adjacent to this Development. The Developer shall also be required
to post a security deposit in the amount of $3,295.00 prior to beginning construction to
guarantee the proper installation and maintenance of the erosion control measures
shown on the Final Development Plan Documents. Said security deposit(s) shall be
made in accordance with the criteria set forth in the City's Storm Drainage Design
Criteria and Construction Standards (Criteria). If, at any time, the Developer fails to
abide by the erosion control provisions of the Final Development Plan Documents or the
erosion control provisions of the Criteria after receiving notice of the same or an
emergency situation exists which would reasonably require immediate mitigation
measures, then, in either event, and notwithstanding any provisions contained in
paragraph III(J) to the contrary, the City may enter upon the Property for the purpose of
making such improvements and undertaking such activities as may be necessary to
ensure that the provisions of said plans and the Criteria are properly enforced. The City
may apply such portion of the security deposit(s) as may be necessary to pay all costs
incurred by the City in undertaking the administration, construction, and/or installation of
the erosion control measures required by said plans and the Criteria. In addition, the
City shall have the option to withhold building permits and certificates of occupancy, as
stated in Paragraph III.D of this Agreement, as it deems necessary in order to ensure
that the Developer installs and maintains the erosion control measures throughout the
build -out of this Development.
4. It is important that all lots be graded to drain in the configuration
shown on the Final Development Plan Documents. For this reason the following
additional requirements shall be followed for all buildings/structures on all lots:
Prior to the issuance of a certificate of occupancy for any lot or building
the Developer shall provide the City with certification that the lot and or the
building has been graded correctly. This grading certification shall
demonstrate that the lot or building finish floor elevation has been built in
accordance with the elevation specified on the Final Development Plan
Documents. The certification shall also show that the minimum floor
elevation or minimum opening elevation for any building constructed is in
compliance with the minimum elevation as required on the Final
Development Plan Documents. The certification shall demonstrate as well
that any minor swales adjacent to the building or on the lot have been
graded correctly and in accordance with the grades shown on the Final
Development Plan Documents. The certification shall also show that the
2
elevations of all corners of the lot are in accordance with the elevations
shown on the Final Development Plan Documents. Said certification shall
be completed by a Colorado licensed professional engineer and shall be
submitted to the City at least two weeks prior to the date of issuance of the
desired certificate of occupancy.
5. The Developer shall limit the construction of the off -site storm
drainage improvement lines to the limits of construction as shown on the Final
Development Plan Documents. The contractor shall re -seed and restore all areas that
are disturbed during construction of the off -site storm drainage improvements in
accordance with the Final Development Plan Documents promptly following
construction. The Developer shall ensure that no negative impact occurs to the
adjoining property during the construction of the detention pond facilities. No grading
shall be done outside of the approved areas as shown on the Final Development Plan
Documents.
6. The drainage design for this Development provides for the
evacuation of storm drainage runoff in a reasonable amount of time out of the water
quality and detention facilities and into the drainage outfall system. The water quality
and detention facilities have been designed to discharge stormwater runoff from
frequent storms over a 40 hour period through a small diameter outlet. Under the
intended operation of the water quality and detention pond, there will not be standing
water in the pond more than 48 hours after the end of a rainfall event. If, during or
within 2 years after construction and acceptance of the detention facilities associated
with this Development, surfacing or standing water conditions persist in these facilities,
and if such conditions are beyond what can be expected in accordance with the
approved stormwater design, the Developer shall promptly, upon such discovery, install
an adequate de -watering system in the detention facilities. Such a system shall be
reviewed and approved by the City prior to installation.
7. The Developer shall be responsible for maintenance of all storm
drainage facilities that are constructed outside of the public right-of-way, to include the
maintenance of the water quality pond that will be constructed off -site on land owned by
the general developer of the Tower Shoppes P.U.D.
D. Streets.
1. No street oversizing reimbursement from the City is due the
Developer for this Development.
2. Notwithstanding any provision herein to the contrary, the Developer
shall be responsible for all costs for the initial installation of traffic signing and striping
for this Development, including both signing and striping related to the Developer's
internal street operations and the signing and striping of any adjacent or adjoining local,
collector or arterial streets that is made necessary because of the Development.
3. Following completion of all public infrastructure improvements, the
Developer shall continue to have responsibility for maintenance and repair of said
improvements in accordance with Sections 2.2.3, 3.3.1 and 3.3.2 of the Land Use Code
of the City.
E. Natural Resources
Not Applicable
F. Soil Amendment
1. In all areas associated with this Development that are to be
landscaped or planted in accordance with the Final Development Plan Documents, and
do not require a building permit, the soils shall be loosened and amended by the
Developer in accordance with Section 3.8.21 of the Land Use Code prior to the
issuance of any certificate of. occupancy in this Development. Completion of soil
amendments shall include certification by the Developer that the work has been
completed. This certification shall be submitted to the City at least two (2) weeks prior
to the date of issuance of any certificate of occupancy in this Development.
G. Ground Water, Subdrains and Water Rights
1. The City shall not be responsible for, and the Developer (for itself
and its successor(s) in interest) hereby agrees to indemnify and hold harmless the City
against any damages or injuries sustained in the Development as a result of ground
water seepage or flooding, structural damage, or other damage unless such damages
or injuries are proximately caused by the City's negligent operation or maintenance of its
storm drainage facilities in the Development. However, nothing herein shall be deemed
a waiver by the City of its immunities, defenses, and limitations to liability under the
Colorado Governmental Immunity Act (Section 24-20-101 CRS, et. seq.) or under any
other law.
2. If the Development includes a subdrain system, any such subdrain
system, whether located within private property or within public property such as street
rights -of -way or utility or other easements, shall not be owned, operated, maintained,
repaired or reconstructed by the City and it is agreed that all ownership, operation,
maintenance, repair and reconstruction obligations shall be those of the Developer or
the Developer's successor(s) in interest. Such subdrain system is likely to be located
both upon private and public property and, to the extent that it is located on public
property, all maintenance, operation, repair or reconstruction shall be conducted in such
a manner that such public property shall not be damaged, or if damaged, shall, upon
completion of any such project, be repaired in accordance with then existing City
standards. The City shall not be responsible for, and the Developer, for itself and its
successor(s) in interest, hereby agrees to indemnify and hold harmless the City against
any damages or injuries sustained in the Development as the result of groundwater
8
seepage or flooding, structural damage or other damage resulting from failure of any
such subdrain system.
3. Without admitting or denying any duty to protect water rights, the
Developer, for itself and its successor(s) in interest, hereby agrees to indemnify and
hold harmless the City against any damages or injuries to water rights caused, directly
or indirectly by the construction, establishment, maintenance or operation of the
Development.
4. The City agrees to give notice to the Developer of any claim made
against it to which the foregoing indemnities and hold harmless agreements by the
Developer could apply, and the Developer shall have the right to defend any lawsuit
based on such claim and to settle any such claim provided the Developer must obtain a
complete discharge of all City liability through such settlement. Failure of the City to
give notice of any such claim to the Developer within ninety (90) days after the City first
receives notice of such claim under the Colorado Governmental Immunity Act for the
same, shall cause the forgoing indemnities and hold harmless agreements by the
Developer to not apply to such claim and such failure shall constitute a release of the
foregoing indemnities and hold harmless agreements as to such claim.
H. Hazards and Emergency Access
1. No combustible material will be allowed on the site until a
permanent water system is installed by the Developer and approved by the City.
2. Prior to beginning any building construction, and throughout the
build -out of this Development, the Developer shall provide and maintain at all times an
accessway to said building or buildings. Such accessway shall be adequate to handle
any emergency vehicles or equipment, and the accessway shall be kept open during all
phases of construction. Such accessway shall be constructed to an unobstructed width
of at least 20 feet with 4 inches of aggregate base course material compacted according
to city standards and with an 100 foot diameter turnaround at the building end of said
accessway. The turnaround is not required if an exit point is provided at the end of the
accessway. Prior to the construction of said accessway, a plan for the accessway shall
be submitted to and approved by the Poudre Fire Authority and City Engineer. (Three
plan sets shall be submitted to the Poudre Fire Authority at 102 Remington Street for
review and processing.) If such accessway is at any time deemed inadequate by the
Poudre Fire Authority or City Engineer, the accessway shall be promptly brought into
compliance and until such time that the accessway is brought into compliance, the City
and/or the Poudre Fire Authority may issue a stop work order for all or part of the
Development.
Footing and Foundation Permits
1. Notwithstanding any provision in this Agreement to the contrary, the
Developer shall have the right to obtain a Footing and Foundation permit upon the
0
installation of all underground water, sanitary sewer, and storm sewer facilities, and an
emergency accessway for the Phase in which the permit is being requested. Facilities
shall include but not be limited to all mains, lines, services, fire hydrants and
appurtenances for the site as shown on the Final Development Plan Documents.
J. Development Construction Permit
1. The Developer shall apply for and obtain a Development
Construction Permit for this Development, in accordance with Division 2.6 of the Land
Use Code (or Section 29-12 of the Transitional Land Use Regulations, if applicable),
prior to the Developer commencing construction. The Developer shall pay the required
fees for said Permit and construction inspection, and post security to guarantee
completion of the public improvements required for this Development, prior to issuance
of the Development Construction Permit.
K. Maintenance and Repair Guarantees
1. The Developer agrees to provide a two-year maintenance
guarantee and a five-year repair guarantee covering all errors or omissions in the
design and/or construction of the public improvements required for this Development,
which guarantees shall run concurrently and shall commence upon the date of
completion of the public improvements and acceptance thereof by the City. More
specific elements of these guarantees are noted in Exhibit "C." Security for the
maintenance guarantee and the repair guarantee shall be as provided in Section
3.3.2(C) of the Land Use Code, or Section 29-14 of the Transitional Land Use
Regulations, as applicable. Notwithstanding the provisions of paragraphs III (H) and (1)
of this Agreement to the contrary, the obligations of the Developer pursuant to this
paragraph and Exhibit "C" may not be assigned or transferred to any other person or
entity unless the warranted improvements are completed by, and a letter of acceptance
of the warranted improvements is received from the City by, such other person or entity.
III. Miscellaneous
A. The Developer agrees to provide and install, at its expense, adequate
barricades, warning signs and similar safety devices at all construction sites within the
public right-of-way and/or other areas as deemed necessary by the City Engineer and
Traffic Engineer in accordance with the City's "Work Area Traffic Control Handbook"
and shall not remove said safety devices until the construction has been completed.
B. As required pursuant to Chapter 20, Article IV of the City Code, the
Developer shall, at all times, keep the public right-of-way free from accumulation of
waste material, rubbish, or building materials caused by the Developer's operation, or
the activities of individual builders and/or subcontractors; shall remove such rubbish as
often as necessary, but no less than daily and; at the completion of the work, shall
remove all such waste materials, rubbish, tools, construction equipment, machinery,
1Q
and surplus materials from the public right-of-way. The Developer further agrees to
maintain the finished street surfaces so that they are free from dirt caused by the
Developer's operation or as a result of building activity. Any excessive accumulation of
dirt and/or construction materials shall be considered sufficient cause for the City to
withhold building permits and/or certificates of occupancy until the problem is corrected
to the satisfaction of the City Engineer. If the Developer fails to adequately clean such
streets within two (2) days after receipt of written notice, the City may have the streets
cleaned at the Developer's expense and the Developer shall be responsible for prompt
payment of all such costs. The Developer also agrees to require all contractors within
the Development to keep the public right-of-way clean and free from accumulation of
dirt, rubbish, and building materials.
C. The Developer hereby agrees that it will require its contractors and
subcontractors to cooperate with the City's construction inspectors by ceasing
operations when winds are of sufficient velocity to create blowing dust which, in the
inspector's opinion, is hazardous to the public health and welfare.
D. The Developer shall, pursuant to the terms of this Agreement, complete all
improvements and perform all other obligations required herein, as such improvements
or obligations may be shown on the Final Development Plan Documents, or any
documents executed in the future that are required by the City for the approval of an
amendment to a development plan, and the City may withhold (or to the extent
permitted by law, revoke) such building permits and certificates of occupancy as it
deems necessary to ensure performance in accordance with the terms of this
Development Agreement. The processing and "routing for approval" of the various
development plan documents may result in certain of said documents carrying dates of
approval and/or execution that are later than the date of execution of this Development
Agreement or the Memorandum Of Agreement (if any) recorded to give record notice of
this Agreement. The Developer hereby waives any right to object to any such
discrepancy in dates.
E. Nothing herein contained shall be construed as a waiver of any
requirements of the City Code, Land Use Code, or Transitional Land Use Regulations
(as applicable) and the Developer agrees to comply with all requirements of the same.
F. In the event the City waives any breach of this Agreement, no such waiver
shall be held or construed to be a waiver of any subsequent breach hereof.
G. All financial obligations of the City arising under this Agreement that are
payable after the current fiscal year are contingent upon funds for that purpose being
annually appropriated, budgeted and otherwise made available by the Fort Collins City
Council, in its discretion.
H. This Agreement shall run with the Property and shall be binding upon and
inure to the benefit of the parties hereto, their respective personal representatives,
heirs, successors, grantees and assigns. It is agreed that all improvements required
11
areas of the City, those facilities shall be shown on the utility
plans and shall be installed by the Developer within the time as
established under "Special Conditions" in this document.
E. Except as otherwise herein specifically agreed, the
Developer agrees to install and pay for all water, sanitary sewer,
and storm drainage facilities and appurtenances, and all streets,
curbs, gutters, sidewalks, bikeways and other public improvements
required by this development as shown on the plat, site, landscape
and utility plans, and other approved documents pertaining to this
development on file with the City.
F. Street improvements (except curbs, gutters and walks)
shall not be installed until all utility lines to be placed therein
have been completely installed, including all individual lot
service lines leading in and from the main to the property line.
G. The installation of all utilities shown on the utility
plans shall be inspected by the Engineering Department of the City
and shall be subject to such department's approval. The Developer
agrees to correct any deficiencies in such installations in order
to meet the requirements of the plans and/or specifications
applicable to such installation. In case of conflict, the utility
plans shall supersede the standard specifications.
H. All storm drainage facilities shall be so designed and
constructed by the Developer as to protect downstream and adjacent
properties against injury and to adequately serve the Property (and
other lands as may be required, if any). The Developer shall meet
or exceed the minimum requirements for storm drainage facilities as
have been established by the City in its Drainage Master Plans and
Design Criteria. The Developer does hereby indemnify and hold
harmless the City from any and all claims that might arise,
directly or indirectly, as a result of the discharge of injurious
storm drainage or seepage waters from the development in a manner
or quantity different from that which was historically discharged
and caused by the design or construction of the storm drainage
facilities, except for (1) such claims and damages as are caused by
the acts or omissions of the City in maintenance of such facilities
as have been accepted by the City for maintenance; (2) errors, if
any, in the general concept of the City's master plans (but not to
include any details of such plans, which details shall be the
responsibility of the Developer); and (3) specific directives that
may be given to the Developer by the City. Approval of and
acceptance by the City of any storm drainage facility design or
construction shall in no manner be deemed to constitute a waiver or
relinquishment by the City of the aforesaid indemnification. The
Developer shall engage a licensed professional engineer to design
the storm drainage facilities as aforesaid and it is expressly
affirmed hereby that such engagement shall be intended for the
benefit of the City, and subsequent purchasers of property in the
development.
pursuant to this Agreement touch and concern the Property regardless of whether such
improvements are located on the Property. Assignment of interest within the meaning
of this paragraph shall specifically include, but not be limited to, a conveyance or
assignment of any portion of the Developer's legal or equitable interest in the Property,
as well as any assignment of the Developer's rights to develop the Property under the
terms and conditions of this Agreement.
I. In the event the Developer transfers title to the Property and is thereby
divested of all equitable and legal interest in the Property, the Developer shall be
released from liability under this Agreement with respect to any breach of the terms and
conditions of this Agreement occurring after the date of any such transfer of interest. In
such event, the succeeding property owner shall be bound by the terms of this
Agreement.
J. Each and every term of this Agreement shall be deemed to be a material
element hereof. In the event that either party shall fail to perform according to the terms
of this Agreement, such party may be declared in default. In the event that a party has
been declared in default hereof, such defaulting party shall be given written notice
specifying such default and shall be allowed a period of ten (10) days within which to
cure said default. In the event the default remains uncorrected, the party declaring
default may elect to: (a) terminate the Agreement and seek damages; (b) treat the
Agreement as continuing and require specific performance or; (c) avail itself of any
other remedy at law or equity.
K. In the event of the default of any of the provisions hereof by either party
which shall require the party not in default to commence legal or equitable action
against said defaulting party, the defaulting party shall be liable to the non -defaulting
party for the non -defaulting party's reasonable attorney's fees and costs incurred by
reason of the default. Nothing herein shall be construed to prevent or interfere with the
City's rights and remedies specified in Paragraph III.D of this Agreement.
L. Except as may be otherwise expressly provided herein, this Agreement
shall not be construed as or deemed to be an agreement for the benefit of any third
party or parties, and no third party or parties shall have any right of action hereunder for
any cause whatsoever.
M. It is expressly understood and agreed by and between the parties hereto
that this Agreement shall be governed by and its terms construed under the laws of the
State of Colorado and the City of Fort Collins, Colorado.
N. Any notice or other communication given by any party hereto to any other
party relating to this Agreement shall be hand -delivered or sent by certified mail, return
receipt requested, addressed to such other parry at their respective addresses as set
forth below; and such notice or other communication shall be deemed given when so
hand -delivered or three (3) days after so mailed:
12
If to the City: Engineering Development Review
City of Fort Collins
P.O. Box 580
Fort Collins, CO 80522
With a copy to: City Attorney's Office
City of Fort Collins
P.O. Box 580
Fort Collins, CO 80522
If to the Developer: William D. Beard and Susan M. Beard
35061 Cornerstone Way
Windsor, CO 80550
Notwithstanding the foregoing, if any party to this Agreement, or its successors,
grantees or assigns, wishes to change the person, entity or address to which notices
under this Agreement are to be sent as provided above, such party shall do so by giving
the other parties to this Agreement written notice of such change.
O. When used in this Agreement, words of the masculine gender shall
include the feminine and neuter gender, and when the sentence so indicates, words of
the neuter gender shall refer to any gender; and words in the singular shall include the
plural and vice versa. This Agreement shall be construed according to its fair meaning,
and as if prepared by all parties hereto, and shall be deemed to be and contain the
entire understanding and agreement between the parties hereto pertaining to the
matters addressed in this Agreement. There shall be deemed to be no other terms,
conditions, promises, understandings, statements, representations, expressed or
implied, concerning this Agreement, unless set forth in writing signed by all of the
parties hereto. Further, paragraph headings used herein are for convenience of
reference and shall in no way define, limit, or prescribe the scope or intent of any
provision under this Agreement.
U
City Clerk
,.
APPROVED AS TO CONTENT:
aaDzv�l
City Engineer
APPROV D S TO FORM:
Deputy City Attorney
THE CITY OF FORT COLLINS, OLORADO,
a Municipal Corporation
By:
City Manager
DEVELOPER:
By: i /
William D. Beard, an individ al
By: �l66cl 'vim- � . o
Susan M. Beard, an individual
14
EXHIBIT "A'
Schedule of electrical service installation.
Electrical lines need to be installed prior to the installation of the sidewalk, curb
returns, handicap ramps, paving and landscaping. If the Developer installs any curb
return, sidewalk or handicap ramp prior to the installation of electrical lines in an area
that interferes with the installation of the electrical line installation, the Developer shall
be responsible for the cost of removal and replacement of those items and any
associated street repairs.
2. Schedule of water lines to be installed out of sequence.
Not Applicable.
3. Schedule of sanitary sewer lines to be installed out of sequence.
Not Applicable.
4. Schedule of street improvements to be installed out of sequence.
Not Applicable
5. Schedule of storm drainage improvements to be installed out of sequence.
Not Applicable.
Ls
EXHIBIT "B"
Not Applicable
16
EXHIBIT "C"
MAINTENANCE GUARANTEE:
The Developer hereby warrants and guarantees to the City, for a period of two (2) years
from the date of completion and first acceptance by the City of the public improvements
warranted hereunder, the full and complete maintenance and repair of the public
improvements constructed for this Development. This warranty and guarantee is made
in accordance with the City of Fort Collins Land Use Code and/or the Transitional Land
Use Regulations, as applicable. This guarantee applies to the streets and all other
appurtenant structures and amenities lying within the rights -of -way, easements and
other public properties, including, without limitation, all curbing, sidewalks, bike paths,
drainage pipes, culverts, catch basins, drainage ditches and landscaping. Any
maintenance and/or repair required on utilities shall be coordinated with the owning
utility company or city department.
The Developer shall maintain said public improvements in a manner that will assure
compliance on a consistent basis with all construction standards, safety requirements
and environmental protection requirements of the City. The Developer shall also correct
and repair, or cause to be corrected and repaired, all damages to said public
improvements resulting from development -related or building -related activities. In the
event the Developer fails to correct any damages within thirty (30) days after written
notice thereof, then said damages may be corrected by the City and all costs and
charges billed to and paid by the Developer. The City shall also have any other
remedies available to it as authorized by this Agreement. Any damages which occurred
prior to the end of said two (2) year period and which are unrepaired at the termination
of said period shall remain the responsibility of the Developer.
REPAIR GUARANTEE:
The Developer agrees to hold the City of Fort Collins, Colorado, harmless for a five (5)
year period, commencing upon the date of completion and acceptance by the City of the
public improvements constructed for this Development, from any and all claims,
damages, or demands arising on account of the design and construction of public
improvements of the Property shown on the approved plans and documents for this
Development; and the Owner furthermore commits to make necessary repairs to said
public improvements, to include, without limitation, the roads, streets, fills,
embankments, ditches, cross pans, sub -drains, culverts, walls and bridges within the
right-of-way easements and other public properties, resulting from failures caused by
design and/or construction defects. This agreement to hold the City harmless includes
defects in materials and workmanship, as well as defects caused by or consisting of
settling trenches, fills or excavations.
17
Further, the Developer agrees that the City shall not be liable to the Developer during
the warranty period, for any claim of damages resulting from negligence in exercising
engineering techniques and due caution in the construction of cross drains, drives,
structures or buildings, the changing of courses of streams and rivers, flooding from
natural creeks and rivers, and any other matter whatsoever on private property. Any
and all monetary liability occurring under this paragraph shall be the liability of the
Developer.
The obligations of the Developer pursuant to the "maintenance guarantee" and "repair
guarantee" provisions set forth above may not be assigned or transferred to any other
person or entity unless the warranted improvements are completed by, and a letter of
acceptance of the warranted improvements is received from the City by, such other
person or entity.
18
I. The Developer shall pay storm drainage basin fees in
accordance with Chapter 26, Article VII of the City Code. Storm
drainage improvements eligible for credit or City repayment under
the provisions of Chapter 26 are described together with estimated
cost of the improvements on the attached Exhibit "B," which
improvements, if applicable, shall include right-of-way, design and
construction costs. See Section II.C, Special Conditions, Storm
Drainage Liner and Appurtenances, for specific instructions.
J. The Developer shall provide the Director of Engineering
with certified Record Plan Transparencies on Black Image Diazo
Reverse Mylars upon completion of any phase of the construction.
K. The Owner specifically represents that to the best of its
knowledge all. portions of the Property dedicated to the City
associated with this development are in compliance with all
environmental protection and anti -pollution laws, rules,
regulations, orders or requirements, including solid waste
requirements, as defined by the U. S. Environmental Protection
Agency Regulations at 40 C.F.R., Part 261, and that such portions
of the Property as are dedicated to the City pursuant to this
development, are in compliance with all such requirements
pertaining to the disposal or existence in or on such dedicated
property of any hazardous substances, pollutants or contaminants,
as defined by the Comprehensive Environmental Response Compensation
and Liability Act of 1980, as amended, and regulations promulgated
thereunder. The Owner does hereby indemnify and hold harmless the
City from any liability whatsoever that may be imposed upon the
City by any governmental authority, pertaining to the disposal of
hazardous substances, pollutants or contaminants, and cleanup
necessitated by leaking underground storage tanks, excavation
and/or backfill of hazardous substances, pollutants or
contaminants, or environmental cleanup responsibilities of any
nature whatsoever on, of or related to any property dedicated to
the City pursuant to this development. The Owner further agrees to
indemnify and hold harmless the City from any claims or actions
based directly, indirectly or in any manner on any of the
aforementioned environmental risks brought against the City by
third parties arising as a result of the dedication of portions of
the Property to the City pursuant to this development. Said
indemnification shall not extend to claims, actions or other
liability arising as a result of any hazardous substance, pollutant
or contaminant generated or deposited by the City, its agents or
representatives, upon portions of the Property dedicated to the
City pursuant to this development.
II. Special Conditions
A. Water Lines
Not Applicable
S
B. Sewer Lines
Not Applicable
C. Storm Drainage Lines and Appurtenances
1. The Developer and the City agree that all on -site and
off -site storm drainage improvements for Phase I shall be completed
by the Developer in accordance with the approved plans prior to the
issuance of any certificate of occupancy for Phase I. The
Developer and the City agree that all on -site and off -site storm
drainage improvements for Phase II shall be completed in accordance
with the approved plans prior to the issuance of any certificate of
occupancy for Phase II. Completion of improvements shall include
the certification by a Colorado licensed professional engineer that
the drainage facilities which serve this development have been
constructed ir- conformance with said approved plans. In addition,
said certification shall include a certification that the lowest
opening elevation to the building is at or above the minimum
opening elevation required on the approved utility plans. Said
certification shall be submitted to the City at least two weeks
prior to the date of issuance for any certificate of occupancy.
2. The Developer agrees to provide and maintain erosion
control improvements as shown on the approved utility plans to
stabilize all over -lot grading in and adjacent to this development.
The Developer shall also be required to post a security deposit in
the amount of $12,945.00 prior to beginning construction to
guarantee the proper installation and maintenance of the erosion
control measures shown on the approved Plan. Said security deposit
shall be made in accordance with the criteria set forth in the
Storm Drainage Design Criteria and Construction Standards.
D. Streets
1. The Developer and the City agree that no street
oversizing reimbursement is due the Developer for this development.
E. Hazards and Emergency Access.
1. No combustible material will be allowed on the site
until a permanent water system is installed by the Developer and
approved by the City.
2. Prior to beginning any building construction, the
Developer shall provide and maintain at all times an accessway to
said building or buildings. Such accessway shall be adequate to
handle any emergency vehicles or equipment, and the accessway shall
be kept open during all phases of construction. Prior to the City
allowing combustible material on the site (other than forming
material for concrete footings, foundations and/or concrete walls)
5
such accessway shall be improved to a width of at least 20 feet
with 4 inches of aggregate base course material compacted according
to City Standards and with an 80 foot diameter turnaround at the
building end of said accessway. The turnaround is not required if
an exit point is provided at the end of the accessway.
3. The issuance of any building permit by the City is
made solely at the Developer's own risk and the Developer shall
hold the City harmless from any and all damages or injuries arising
directly or indirectly out of the issuance of said permit prior to
the completion of the requirements in accordance with Section 29-
678 of the Code of the City.
III. Miscellaneous
A. The Developer agrees to provide and install, at its
expense, adequate barricades, warning signs and similar safety
devices at all construction sites within the public right-of-way
and/or other areas as deemed necessary by the Director of
Engineering '_n accordance with the City's "Work Area Traffic
Control Handbook" and shall not remove said safety devices until
the construction has been completed and approved by the Director of
Engineering.
B. The Developer shall, at all times, keep the public right-
of-way free from accumulation of waste material or rubbish caused
by the Developer's operation; shall remove such rubbish no less
than weekly and; at the completion of the work, shall remove all
such waste materials, rubbish, tools, construction equipment,
machinery, and surplus materials from the public right-of-way. The
Developer further agrees to maintain the finished street surfaces
so that they are free from dirt caused by the Developer's
operation. Any excessive accumulation of dirt and/or construction
materials shall be considered sufficient cause for the City to
withhold building permits and/or certificates of occupancy until
the problem is corrected to the satisfaction of the Director of
Engineering. If the Developer fails to adequately clean such
streets within two (2) days after receipt of written notice, the
City may have the streets cleaned at the Developer's expense and
the Developer shall be responsible for prompt payment of all such
costs.
C. The Developer hereby agrees that it will require its
subcontractors, to cooperate with the City's construction inspectors
by ceasing operations when winds are of sufficient velocity to
create blowing dust which, in the inspector's opinion, is hazardous
to the public health and welfare.
D. The Developer shall, pursuant to the terms of this
Agreement, complete all improvements and perform all other
obligations required herein, as such improvements or obligations
may be shown on the original plat and related documents, or any
2
replat as subsequently filed by the Developer, and the City may
withhold such building permits and certificates of occupancy as it
deems necessary to ensure performance hereof.
E. Nothing herein contained shall be construed as a waiver of
any requirements of the City Code, and the Developer agrees to
comply with all requirements of the same.
F. In the event the City waives any breach of this Agreement,
no such waiver shall be held or construed to be a waiver of any
subsequent breach hereof.
G. Financial obligations of the City of Fort Collins payable
after the current fiscal year and/or not appropriated or budgeted
are contingent upon funds for that purpose being appropriated,
budgeted and otherwise made available.
H. This Agreement shall run with the Property and shall be
binding upon the parties hereto, their personal representatives,
heirs, successors, grantees and assigns. It is agreed that all
improvements required pursuant to this Agreement touch and concern
the Property regardless of whether such improvements are located on
the Property. Assignment of interest within the meaning of this
paragraph shall specifically include, but not be limited to, a
conveyance or assignment of any portion of the Developer's real or
proprietary interest in the Property, as well as any assignment of
the Developer's rights to develop the Property under the terms and
conditions of this Agreement.
I. In the event the Developer transfers title to the Property
and is thereby divested of all equitable and legal interest in the
Property, the: City hereby agrees to release said Developer from
liability under this Agreement with respect to any breach of the
terms and conditions of this Agreement occurring after the date of
any such transfer of interest. In such event, the succeeding
lessor and/or property owner shall be bound by the terms of this
Agreement.
J. Each and every term of this Agreement shall be deemed to
be a material element hereof. In the event that either party shall
fail to perform according to the terms of this Agreement, such
party may be declared in default. In the event that a party has
been declared in default hereof, such defaulting party shall be
given written notice specifying such default and shall be allowed
a period of thirty (30) days within which to cure said default. In
the event the default remains uncorrected, the party declaring
default may elect to: (a) terminate the Agreement and seek damages;
(b) Treat the Agreement as continuing and require specific
performance or; (c) avail itself of any other remedy at law or
equity. Notwithstanding the foregoing, if the nature of the
default is such that it cannot be reasonably cured within said
7
thirty (30) days, then the time for curing said default may be
extended to a time mutually agreed upon in writing by the parties.
K. In the event of the default of any of the provisions
hereof by either party which shall require the party not in default
to commence :Legal or equitable action against said defaulting
party, the defaulting party shall be liable to the non -defaulting
party for the non -defaulting party's reasonable attorney's fees and
costs incurred by reason of the default. Nothing herein shall be
construed to prevent or interfere with the City's rights and
remedies specified in Paragraph III.D of this Agreement.
L. This Agreement shall not be construed as or deemed to be
an agreement for the benefit of any third party or parties, and no
third party or parties shall have any right of action hereunder for
any cause whatsoever.
THE CITY OF FORT COLLINS, COLORADO,
a Municipal Corporation
Gity Manage
AT EST:
CITY CLERK
APPROVED AS TO.CONTENT:-
Director of Engineer
APAPRR/nOVE�IAS TO FORM:
City Attorney
FI)XIFUSELSIUM �
TIMBERLINE PARTNERS LIMITED,
a Colorado limited partnership
By: ld �1�
Gerald P. Lee, General Partner
0
EXHIBIT "A"
1. Schedule of water lines to be installed out of sequence.
Not Applicable.
2. Schedule of sanitary sewer lines to be installed out of
sequence.
Not Applicable.
3. Schedule of street improvements to be installed out of
sequence.
Not Applicable.
4. Schedule of storm drainage improvements to be installed out
of sequence.
Not Applicable.
01