Loading...
HomeMy WebLinkAboutTIMBERLINE APARTMENTS PUD - Filed OA-OTHER AGREEMENTS - 2004-03-04TIMBERLINE, APARTMENTS P.U.D. (to be known as Timberline Village P.U.D.) AMENDMENT AGREEMENT No. 2 THIS AGREEMENT is made and entered into this day of September, 1985, by and between THE CITY OF FORT COLLINS, COLORADO, a municipal corporation (the "City"), and EVERITT ENTERPRISES, INC., a Colorado corporation (the "Developer"), WHEREAS, on September 23, 1983, the City and the Developer entered into an agreement for development of the Timberline Apartments P.U.D. (the "Development Agreement") ") which Development Agreement was subsequently amended by an agreement on June 30, 1985, and WHEREAS, the parties hereto desire to further amend said Development Agreement and provide for the construction, install- ation and payment of certain additional storm drainage improve- ments as a part of the construction of street improvements for the Development. NOW, THEREFORE, in consideration of the premises and the terms and conditions acknowledged by the parties hereto, it is agreed as follows: 1. The Developer agrees that those storm drainage improve- ments shown on the Timberline Road Foothills Drainage Project Utility Plans on file with and finally approved by the City shall be constructed and installed by the Developer in accordance with said Utility Plans and as a part of the construction and installation of Timberline Road improvements required for the Development. 2. The parties hereto understand and agree that the above - referenced storm drainage improvements are basin -wide improvements for the Foothills Drainage Basin and that the development of said storm drainage improvements is therefore the responsibility of the City, notwithstand- ing Developer's agreement to construct said improvements as a part of the street improvement for the Development. The City has budgeted the funds necessary for completion of said storm drainage improvements and hereby agrees to pav for such improvements in the form of monthly progress pavments to the Developer (which shall include payment for construction, engineering and surveying costs) upon receipt of an itemized billing from the Developer for the same. 3. The attached Exhibit "C", is a cost estimate for the storm drainage improvements described herein and which is incorporated herein by reference. The actual costs for such improvements shall be paid by the City in addition to those costs for storm drainage improvements for the Development as set forth on Exhibit "B" to the Development Agreement. 4. Except as amended or modified by earlier addendum or herein, the Development Agreement shall continue in full force and effect. This Agreement, the Development Agreement and any addenda thereto constitute the entire understanding of the parties. IN WITNESS WHEREOF, the parties hereto have set their hands the day and year first written. CITY OF FORT COLLINS A MunicipalCorporation 1 By City Manager ATTEST - Ci Perk' --------- APPROVED AS TO FO$M: City Atorney C1tY Engineer 7 - I EVERITT ENTERPRISES, INC., a Colorado c poration By:Z �/ Gerald R. Haxton, Preside t ATTEST: (Corporate Seal) A.rr Vice-PresideV , Secretary -Treasurer EXIIIBIT "C" The Development Agreement for This exhibit does apply to this development. COST ESTIMATE FOR MAJOR DRAINAGE IMPROVEMENTS Include only those major storm drainage basin improvements required by an adopted basin master plan. ITEM DESCRIPTION QUANTITY UNIT COST TOTAL COST 1. Storm sewer, manholes, end sections, etc. (a) 54 inch CMP (b) 18 inch Conc. (c) Raise 6 inch water (d) Headwall for 54 inch (e) Inlet box and grate for 12" PVC (f) Relocate Manholes (g) 12" PVC (SDR35) Sub -Total 2. Channel excavation, detention pond excavation and riprap (a) Misc. grading and excavation (b) Haul waste material (c) Sub -Total 480 L.f. 60.00 /L•f• $ 28,800.00 265 L.f. 30.00 /L,f, $ 7,950.00 1 Ea. 5,500.00 Ea. $ 5,500.00 2 Ea. 4,500.00 Ea. $ 9,000.00 1 Ea. 2,500.00 Ea. $ 2,500.00 2 Ea. 500.00 Ea. $ 1,000.00 240 L.f. 20.00 /L.f. $ 4,800.00 $ 59,550.00 500 C.Y. $ 2.00 /C.Y. $ 1,000.00 1000 C,Y, $ 2.00 /C.Y, $ 2,000.00 C.Y. $ /C.Y. $ $ 3,000.00 EXHIBIT B - Page 2 ITEM DESCRIPTION QUANTITY UNIT COST TOTAL COST 3. Right-of-way & easement acquisition (a) S.F. $ /S.F. $ (b) Ac. $ /Ac. $ Sub -Total $ 4. Professional Design (a) Design engineering and construction Lump Sum $ 5,500.00 surveying 5. Other (a) Raise telephone line $ 500.00 (b) Brace and bedding for 3 inch water $ 1,000.00 (c) Bedding for 16 inch water $ 500.00 (d) Plug pipe ends $ 500.00 (e) Final grading and seeding b 1,000.00 Total estimated cost of Storm Drainage improvements eligible for credit or City repayment $ 71550.00 \\\\111111111/1j)' Prepared by ¢���^ Title Address: J-N. Sfewar } gt a ice, >LPS Zl4- N. Hower For4- Call%hs (-O c5�O5,Z/ l 0/9% 8S