HomeMy WebLinkAboutSUNSTONE VILLAGE PUD THIRD - Filed DA-DEVELOPMENT AGREEMENT - 2004-03-01DEVELOPMENT AGREEMENT
THIS AGREEMENT, made and entered into this L day of May,
1988, by and between THE CITY OF FORT COLLINS, COLORADO, a
Municipal Corporation, hereinafter referred to as "The City", and SUN -
STONE VILLAGE ASSOCIATES, a Colorado General Partnership, hereinafter
referred to as "the Developer."
WITNESSETH
WHEREAS, the is the Owner of certain property situated in the
County of Larimer, State of Colorado, and legally described as follows,
to -wit:
SUNSTONE VILLAGE P.U.D. THIRD SUBDIVISION, being a
portion of Harmony Annexation #3 to the City of Fort Col-
lins, Colorado. Also, being a portion of the south half of the
northwest quarter of Section 32, Township 7 North, Range
68 West of the 6th P.M., County of Latimer, State of Colo-
rado.
WHEREAS, the Developer desires to develop said property and has
submitted to the City a subdivision plat and/or a site plan and landscape
plan, a copy of which is on file in the Office of the Director of Engineer-
ing and made a part hereof by reference; and
WHEREAS, the Developer has further submitted to the City a utility
plan for said lands, a copy of which is on file in the office of the Director
of Engineering and made a part hereof by reference; and
WHEREAS, the parties hereto have agreed that the development of
said lands will require increased municipal services from the City in order
to serve such area and will further require the installation of certain
improvements primarily of benefit to the lands to be developed and not to
the City of Fort Collins as a whole; and
WHEREAS, the City has approved the subdivision plat and/or site
plan and landscape plan submitted by the Developer subject to certain
requirements and conditions which involve the installation of and construc-
tion of utilities and other municipal improvements in connection with said
lands.
NOW, THEREFORE, in consideration of the promises of the parties
hereto and other good and valuable consideration, the receipt and ade-
quacy of which is hereby acknowledged, it is agreed as follows:
1. General Conditions.
A. The terms of this Agreement shall govern all development
activities of the Developer pertaining to the subject property
described above. For the purposes of this Agreement, "devel-
opment activities" shall include, but not be limited to, the
following: (1) The actual construction of improvements, (2)
Obtaining a building permit therefor, or (3) Any change in
grade, contour or appearance of said property caused by or
on behalf of the Developer with the intent to construct
improvements thereon.
B. All water lines, sanitary sewer collection lines, storm sewer
lines and facilities, streets, curbs, gutters, sidewalks, and
bikepaths shall be installed as shown on the approved utility
plans and in full compliance with the Council -approved stan-
dards and specifications of the City on file in the Office of
the Director of Engineering to the specific utility, subject to
a three (3) year time limitation from the date of execution of
this agreement. In the event that the Developer commences or
performs any construction pursuant hereto after three (3)
years from the date of execution of this agreement, the
Developer shall resubmit the project utility plans to the
Director of Engineering for reexamination. The City may
require the Developer to comply with approved standards and
specifications of the City on file in the Office of the Director
of Engineering at the time of resubmittal.
C. No building permit for the construction of any structure
within the development shall be issued by the City until the
water lines, fire hydrants, sanitary sewer and streets (with
at least the base course completed) serving such structure
have been completed and accepted by the City. No building
permits shall be issued for any structure located in excess of
six hundred sixty feet (660') from a single point of access.
D. Any water lines, sanitary sewer lines, storm drainage lines,
and/or streets described on Exhibit "A", attached hereto,
shall be installed within the time and/or sequence required on
Exhibit "A". If the Director of Engineering has determined
that any water lines, sanitary sewer lines, storm sewer facili-
tics and/or streets arc required to provide service or access
to other areas of the City, those facilities shall be shown on
the utility plans and shall be installed by the Developer
within the time as established under "Special Conditions" in
this document.
E. Except as otherwise herein specifically agreed, the Developer
agrees to install and pay for all water, sanitary sewer and
storm sewer facilities and appurtenances, and all streets,
curbing, gutter, sidewalks, bikeways and other public
improvements required by this development as shown on the
plat, utility and landscape plans, and other approved docu-
ments pertaining to this development on file with City.
F. Street improvements (except curbing, gutter and walks) shall
not be installed until all utility lines to be placed therein
have been completely installed, including all individual lot
-2-
service lines leading in and from the main to the property
line.
G. The installation of all utilities shown on the utility drawings
shall be inspected by the Engineering Department of the City
and shall be subjected to such department's approval. The
Developer agrees to correct any deficiencies in such installa-
tions in order to meet the requirements of the plans and/or
specifications applicable to such installation. In case of
conflict, the utility drawings shall supersede the standard
specifications.
H. All storm drainage facilities shall be so designed and con-
structed by the Developer as to protect downstream and adja-
cent properties against injury and to adequately serve the
property to be developed (and other lands as may be
required, if any). The Developer has met or exceeded mini-
mum requirements for storm drainage facilities as have been
established by the City in its Drainage Master Plans and
Design Criteria. The Developer does hereby indemnify and
hold harmless the City from any and all claims that might
arise, directly or indirectly, as a result of the discharge of
injurious storm drainage or seepage waters from the develop-
ment in a manner or quantity different from that which was
historically discharged and caused by the design or construc-
tion of the storm drainage facilities, except for (1) such
claims and damages as are caused by the acts or omissions of
the City in maintenance of such facilities as have been
accepted by the City for maintenance; (2) errors, if any, in
the general concept of the City's master plans (but not to
include any details of such plans, which details shall be the
responsibility of the Developer); and (3) specific directives
as may be given to the Developer by the City. Approval of
and acceptance by the City of any storm drainage facility
design or construction shall in no manner be deemed to con-
stitute a waiver or relinquishment by the City of the afore-
said indemnification. The Developer shall engage a licensed
professional engineer to design the storm drainage facilities as
aforesaid and it is expressly affirmed hereby that such
engagement shall be intended for the benefit of the City, and
subsequent purchasers of property in the development.
1. The Developer shall pay storm drainage basin fees in accor-
dance with Chapter 26, Article ViI of the City Code. Storm
drainage improvements eligible for credit or City repayment
under the provisions of Chapter 26 are described together
with the estimated cost of the improvements on the attached
Exhibit "B", which improvements shall include right-of-way,
design and construction costs. See Section 2.C, Special Con-
ditions, Storm Drainage Lines and Appurtenances, for specific
instructions.
-3-
J. The Developer shall provide the Director of Engineering with
certified Record Utility Drawing Transparencies on Black
Image Diazo Reverse Mylars upon completion of any phase of
the construction.
2. Special Conditions
A. Water lines.
Not Applicable.
B. Sewer lines.
Not Applicable.
C. Storm drainage lines and appurtenances.
(i) The Developer and the City agree that all on -
site and off -site storm drainage improvements
shall be completed by the Developer prior to
the issuance of more than 6 building permits.
(ii) The Developer agrees to provide and maintain
erosion control improvements as shown on the
approved utility plans to stabilize all over -lot
grading in and adjacent to this development.
The erosion control improvements must be com-
pleted prior to the issuance of any building
permit.
D. Streets.
(i) The Developer and the City agree that no
street oversizing reimbursement is due the
Developer for this development.
3. Miscellaneous.
A. The Developer agrees to provide and install, at his
expense, adequate barricades, warning signs and similar
safety devices at all construction sites within the public
right-of-way and/or other areas as deemed necessary by
the Director of Engineering in accordance with the
City's "Work Area Traffic Control Handbook" and shall
not remove said safety devices until the construction has
been approved by the Director of Engineering.
B. The Developer shall, at all times, keep the public right-
of-way free from accumulation of waste material or rub-
bish caused by the Developer's operation, shall remove
such rubbish no less than weekly and, at the completion
of the work, shall remove all such waste materials, rub-
bish, tools, construction equipment, machinery, and sur-
S!
plus materials from the public right-of-way. The Devel-
oper further agrees to maintain the finished street sur-
faces free from dirt caused by the Developer's oper-
ation. Any excessive accumulation of dirt and/or con-
struction materials shall be considered sufficient cause
for the City to withhold building permits and/or certifi-
cates of occupancy until the problem is corrected to the
satisfaction of the Director of Engineering. If the Devel-
oper fails to adequately clean such streets within two (2)
days after receipt of written notice, the City may have
the streets cleaned at the Developer's expense and the
Developer shall be responsible for prompt payment of all
such costs.
C. The Developer hereby insures that his subcontractors
shall cooperate with the City's construction inspectors
by ceasing operations when winds are of sufficient velo-
city to create blowing dust which, in the inspector's
opinion, is hazardous to the public health and welfare.
D. When the inspector determines that erosion (either by
wind or water) is likely to be a problem, the surface
area of erodible earth material exposed at any one time
shall not exceed 200,000 square feet for earthworks
operations. Temporary or permanent erosion control shall
be incorporated into the subdivision at the earliest prac-
ticable time. By way of explanation and without limita-
tion, said control may consist of seeding of approved
grasses, temporary dikes, gabions, and/or other
devices.
E. The Developer shall, pursuant to the terms of this
agreement, complete all improvements and perform all
other obligations required herein, as such improvements
or obligations may be shown on the original plat and
related documents, or on any replat subsequently filed
by the Developer, and the City may withhold such build-
ing permits and certificates of occupancy as it deems
necessary to ensure performance hereof.
F. Nothing herein contained shall be construed as a waiver
of any requirements of the City Code, and the Developer
agrees to comply with all requirements of the same.
G. In the event the City waives any breach of this agree-
ment, no such waiver shall be held or construed to be a
waiver of any subsequent breach hereof.
H. Financial obligations of the City of Fort Collins payable
after the current fiscal year and/or not appropriated or
budgeted are contingent upon funds for that purpose
being appropriated, budgeted and otherwise made avail-
able.
-5-
[. This Agreement shall run with the real property herein
above described and shall be binding upon the parties
hereto, their personal representatives, heirs, succes-
sors, grantees and assigns. Assignment of interest
within the meaning of this paragraph shall specifically
include, but not be limited to, a conveyance or assign-
ment of any portion of the Developer's real or propriet-
ary interest in the real property herein after described,
as well as any assignment of the Developer's rights to
develop such property under the terms and conditions of
this Agreement.
J. In the event the Developer transfers title to such real
property and is thereby divested of all equitable and
legal interest in said property, the City hereby agrees
to release said Developer from liability under this Agree-
ment with respect to any breach of the terms and condi-
tions of this Agreement occurring after the date of any
such transfer of interest. In such event, the succeeding
property owner shall be bound by the terms of this
Agreement.
K. Each and every term and condition of this Agreement
shall be deemed to be a material element thereof. In the
event either party shall fail or refuse to perform accord-
ing to the terms of this Agreement, such party may be
declared in default. In the event a party has been
declared in default hereof, such defaulting party shall
be allowed a period of five (5) days within which to cure
said default. In the event the default remains uncor-
rected, the party declaring default may elect to: (a)
terminate the Agreement and seek damages; (b) treat the
Agreement as continuing and require specific perfor-
mance; or, (c) avail itself of any other remedy at law or
equity.
L. In the event the default of any of the provisions hereof
by either party which shall require the party not in
default to co mmcnce legal or equitable action against said
defaulting party, the defaulting party shall be liable to
the non -defaulting party for the non -defaulting party's
reasonable attorney's fees and costs incurred by reason
of the default. Nothing herein shall be construed to pre-
vent or interfere with the City's rights and remedies
specified in Paragraph 3 E of this Agreement.
M
ATTEST:
City Clcr' -
APPROVED AS TO FORM:
rector/qf Engineering
i
City Attorney
THE CITY OF FORT COLLINS, COLORADO
A Muni 'pal Corporation By: C
City Manager
DEVELOPER:
SUNSTONE VILLAGE ASSOCIATES,
a Colorado General Partnership
By: ". Burns
na Con ruction Co., a
Coloiad'p Co
rpo ti n 1 Partn r
By: , �i✓l
DoE. Burns, President
(corporate seal)
By: Super Group, Inc., a Colorado
Corporation, General Partner
By. f�
Glenn Stephens, Pfesidcnt
(corporate seal)
-7-
EXHIBIT "A"
I. Schedule of water lines to be installed out of sequence.
Not Applicable.
2. Schedule of sanitary sewer lines to be installed out of sequence.
Not applicable.
3. Schedule of street improvements to be installed out of sequence.
Not Applicable.
4. Storm drainage improvements to be installed out of sequence.
Not applicable.
-8-
May 12, 1988
Project No. 3721-CD1J-01-568
Exhibit "B"
The
Development Agreement for Sunstone Village - P.U.D. Third
Subdivision, City of Fort Collins,
Larimer County, Colorado.
COST ESTIMATE FOR MAJOR DRAINAGE IMPROVEMENTS
Included are only those major drainage
basin improvements required by
the
adopted Fox Meadows Basin Master Plan.
Item Description
Quantity Unit Cost
Total Cost
1.
Storm sewer, manholes, end
section, etc.
a) 'Prickle Channel
1470 $3.75/L.F.
$5,512.50
Subtotal
$5,512.50
2.
Channel excavation, detention
pond excavation and rip rap
a) Channel fine grading
58,800 S.F. $0.05/S.F.
$2,940.00
b) Preparation and Seeding
58,800 S.F. $0.08/S.F.
$4,704.00
Subtotal
$7,644.00
3.
Right -of -Way and Easement
Acquisition
Not Applicable
4.
Professional Design
a) Basic Design Services
Lump Sum
$1,500.00
b) Construction Survey
Lump Sum
$ 750.00
c) Materials Testing
Lump Sum
$ .00
d) Construction Management
Lump Sum
$ 750.00
5. Other
10% Contingency
Total Estimated Cost of
Improve is Eligib,1e;;
Prepared B , r
avid Shu e, Colo.
Address: Landmar Engineeri
2300 W. Eisenhower
Loveland, Colorado
$3,000.00
$ 1,615.00
7 1 Repayment $17,772.15
y yam'"tt',
9 � E yi*cye„0. Project Manager
5914 W.
1 l
�O