HomeMy WebLinkAboutSCOTCH PINES SIXTH - Filed OA-OTHER AGREEMENTS - 2004-02-10AGREUI ITT
THIS AGPJ7011i1fF is nade and entered into this��day of
A.D. 19 by and Uctw_cii Z'EE CITY OF FORD COLLINS, COLORADO, a melliieipal
cor_lx ration, hereinafter Formtimes designated as the "City", and
H.C.I., Inc. ___ — hereinafter design, I as th^_- "Developer
WI1'NTESSET11:
WHEREAS, is the ounler of:
SCOTCH PINES, SIXTH FILING situate in the northwest 1/4 of
Section 25, T 7 N, R 6 9 W of the sixth P.M. , Fort Collins,
Colorado,
nore 1»r1_icul.arly descrilxxl on the sutxlivi.sion plat me :File in the City Pingincer's
office and by this reEer_ence made a part hereof; and
i,VIILR1AS, F,velopc,r_
desires to develop
said property
as a multiple family
s:ulxlivi.sion and has
sri)lnittcxd to the City a
utility plan
for said lands, a copy
of which is on file
in the City Engineer's
office and by
this reference made a
part hereof; and
WIlEREAS, the parties hereto have agreed that the development of said
lands will require increased municipal services from the City in order to
serve such area and will further require the installation of certain improvements
primarily of benefit to the ].ands to be developed and not to the City of Fort
Collins as a whole; and
NOW, THUREGORE, in consideration of the premises and the terms and conclitions
herein sLaUA nd for other valuable consideration, t e adegi,acy of which is
acknowledged by Uie parties hereto, it is agreed as_follnws:
1. Except as otherwise herein specifically agrccl, the Cx,veloper agrees
to install and pay for all utility lines, storm drainage facilities, streets
and otlier iunicipal=acilities necessary to serve the lands described on the
saklivision plat.
2. 6oator Lines.
a. Develop>r agrees to install all water lines as shown on the utility
plans
in accordance with
the requirements and as shown
on said plans,
whether
such lines
are actually
on the property, bordering the
property or on
other
lands oDnnecting the subject property to the e.cisting City water distribution
system.
b. Such water linos shall be installed in full compliance with the
standard spccifi.cations of Uie City on file in the office of the City Engineer
relating to the installation of such lines
c. Devclo1x�r agrees to complete the installation of said lines no later
than December 1, 1978.
d. Developer understands and agrees that no building permit for any
structure in the sutylivi.si-on shall be issued by the City unA L'the fire hydrant
serving such structure is installed and accepted by the City
e. All of said lines shall be installed at the sole e.cpense of. the
Developer.•
f. The installation of said lines shall be inspected by the Engineering
Services Department of the City and shall he subject to ,such department's
approval. Developer_ agrees to correct any deficiencies in such installation in
order to meet the requirements of the plans and the specifications applicable
to such installation. In the event such installation is not completC'( 1 and
approved within the time set- forth above, the City shall have the right be
cause such additional work to be done as it deems necessary to complete the
-2-
installation in a satisfactory manner and the Developer shall be liable for the
costs OF such additional. work.
3. Sanitary Sewer Col_lcction Lines.
a. The Deve�loper agrees to install all sanitary sewer collection lines_.
sho�,nl on the utility plans whether the same be on or oft the subject property-
b. Such sanitary sewer lines shall be installed in full compliance
with the standard'sp2cifications of the City on file in the office of the
City Engineer relatincp to the installation of such lines.
c. Developer nlrces to complete the installation of said lines no later
than December 1; 1978.
d. Develolx?r understands and agrees that no building permit shall
lx issued by the City for any structure in the sulxlivi.sion tultil the sanitary
sewer line serving such structure is installed and accepted by the City.
e. All of said lines shall be installed at the sole expense of the
Developer.
f. The installation of, said lines shall le inspected by the Engineering
Services Department of the City and subject to such depar w nt's approval.
Developer agree- to correct any deficiencies in such installation in order
to meet the r_ecuireznents of the plans and the specifications applicable to
such installation. In the event such installation is not cogAetcd and approved
within the time set forth above, the City shall have the right to cause such
additional work to be done as it deems necessary to complete the installation
in a satisfactory maiulcr and the Developer shall be liable for the costs of
such additional work.
-3-
4. Electric Lines and Facilities.
a. The City Light and Power Department shall_ install all electric
di.strikukion 7_incs and Facilities required for the subject property and Clio
Developer shall pay for such work in accordance with the estahlished charges
OF the Light alrrl Po�,nr Department
lights required for tie development
Such installation shall include all street
5. Storm Sewer Lines and Facilities.
a. The DevoloCr_r shallinstall all storm sewer lines and facilities
shown on the utility plans.
b. Such storm sewer lines and facilities shall lx installed in full
compliance wLth UZe standard specifications of the City on file in the office
of the City Engineer ralating to the installation of such lines.
c. Developer agrees to complete the installation of said lines and
facilities in an orderly fashion during the process of develotxnent so as to assure
that tJio health, safety, welfare, and property of the City and citizens is
safequarcled and protected through the proper control and drainage of storm waters.
d. All of said lines shall be installed at the sole expense of the
Developer..
e, qhe installation of all of such lines and facilities shall be
nspecte!] by the Engineering Services Department of the City and sha11 be subject
to such departeient's approval. Developer agrees to correct any deficiencies
in such installation in order to meet the requirements of tie plans and the
spcci[icatiolr; applicablc to such installation. In the event such instillation
is not completed and approvLxd within the time sot forth abivc, the City shall
have the right Lo.cause such additional work to he done as it- do_uns necessary to
complete. the installation in a satisfactory manner and the Developer shall be
liable for the cost of such additional work.
-4-
b. Streets.
a. The Developer agrees to install all street improvements on Drake
Road front the west lane of said development to Lemay Avenue, complete with asphalt
paving, curb, gutter and sidewalks. Developer further agrees to install all
street improvements for Scotch Pine Road as shown on the utility plan.
b. Such streets stall be installed in full compliance with the standard
specifications of the City on file in the office of the City Engineer relating to
the installation of such lines.
c. Developer agrees to conplete the installation of street improvements
on tie south side of Drake Road from the west line of said development to Lemay
Avenue no later than. September 1, 1977. Should the City Council initiate an im-
provenent district to include these improvements prior to September 1, 1977, it is
understood that the Developer would fulfill his obligations by participating in
the district
d. No building permit for the construction of any structure in the sub-
division shall be issued by the City until the street providing access to the
structures is improved with at least the gravel base required.
e. The installation of all streets shall be inspected by the Engineering
Services Department of the City and subject to such department's approval.
ueveloper agrees to correct any deficiencies in such installation in order to
meet the requirements of the plans and the specifications applicable to such
installation. In tie event the improvements are not completed and approved within
the time set fortis above, the City shall have the right to cause such additional
work to be done as it deems necessary to complete the installation in a satis-
factory manner and the Developer shall be liable for the cost of such additional
work, including all normal charges made by the City for financing, engineering,
publication, legal and miscellaneous on City Special Street Improvement Districts.
- 5 -
f. Street Improvemeiits shall not be installed until all utility lines
to L)e placed in the street have been completely installed and all services to
individual lots have been installed from main utility lines to the property line..
'rids ayree:nent shall be binding upon the parties hereton, their heirs,
personal representatives and assigns.
IN WIT1U:.SS WHuwF, the parties hereto have caused this agreement to be
signed tile day and year first hereiralove written.
ATTEST:
D
City Cleric
APPROVED:
- 6 -
THE CITY OF FORT COLLINS, COLORAEO
By J�L , j f -
City manager