HomeMy WebLinkAboutCENTRE FOR ADVANCED TECHNOLOGY PUD SIXTEENTH - Filed E-ELEVATION PLAN - 2001-09-20a
V ` '
PAINTED MTL GAP FLMHttIS
MECH twTS BEYOND, SEE MEGH pros.
�♦ PREFINISHED MTE EQUIP SCREEN AT MECH UNITS
A 9
l
G.J. C-L G.J. G.J. T.O. WALL
r+
BATTEN SCAM t—M
t3 FOR OW bfcAkNoEPNr N NOTEw, AND \
TRASM ENCLOSURE! —
SCE 4/A9
NOTE,
I. CONTROL JOINTS INDICATED BY 'G.J.'ON
ELEVATIONS. ALIGN AS SHAOWN AND INDICATED.
SEC I/A5 FOR GMU
NOTES AND TYPES
G.J.
{
TA. GONG.sLAD
EL. 100'-0"
ALUMINUM STOREFRONT
5Y5TEM
2 -WEST ELEVATION
SEE I/AS FOR GMU
NOTES AND TYPE5
f ,
a _
L MATCH OFP END L
4 SOUTH ELEVATION
1/8" - 1'-O•
160 X 60 SMOOTH FACE GML
ACCENT STRIPE. PAINTED.
16' X 6• SPLIT FACE GNU!
FIELD, TYP, STAIN AND SEA
W Co0 f� ^ FA URL
16' X 4" SMOOTH FACE CM
BLOCK BANDING, TYP
STAIN AND SEAL.
7?0 t -1 - 19Q ptI^1
16' X 6• SMOOTH FAGS CM
BLOCK BANDINS, TYP -
STAIN AND SEAL.
-W c4o�- �A^L
B1
I
MAIL SLOT
BVILDINS S16NAGE- 40'-O•X 2'-60
WITH CONGEALED L16MT 50U1GE- ONLY
LETTERS ARE ILLUMINATED
FAINTEV Mn- CAP FLAeWNS
MECH UNITS BEYOND, SR MECM DMus.
PREFINI5HEO MTL EQUIP SCREEN AT MECH UNITS
SEE 10/A9
BUILDING SIONAGE- 40'-O•X 2"-61
BACKLIT WITH CONGEALED LIOW
SOURCE- ONLY LETTERS ARE ILLUMINATED
G J G..L G J T.O. WALL
I -
1
(i
40'-0* Ta. A 44!Rr ST!lIp1E
EL. 116'-00
B.O. ROOF CAVE
- 1 _ EL.
_ _ '/vv �trRs �'hI NTBA �'nmipf N4 LL/ T"
;i
- 1 T.O. GONG.sLAD
EQ I Ems+ I EQ
PAINTED MTL GAP FLASHING
lfloLoR 70 MA� VLALI.
MECH UNITS BEYOND, WE MECH OW65.
PIREFINISHED MTL EQUIP SCREEN AT MECH UNITS
SEE 10/A9
G.J.
G.J.
T.O. ACCENT STRIp�
no. ROOF SAVE ih
- 1
r :1
- I y T.O. GONG. SLAB
EL. 100'-0" (Hp)
T.O. LONG. SLAB
EL. 98'-O• (L.PJ
EQ � EQ 6
L
PAINTED MTL GAP FLASHING '� PIPE '
co qt joMtK{} lvJtL1 Ork�sS.
TRASH ENCLOSURE WALL
MECH UNITS BEYOW, WE MEGH OW05. TJN aAoN oF- �_QJAL
PREFINISHED MTL EQUIP SCREEN AT MECH UNI
10/ATS
/ 15EE 9
B �AL16N QL OF JOINT rAL16N QL OF JOINT
WITH (k OF COLUMN WITH ED6E OF WALL
POSTER AROS OFGI- BOLT
TO WALL WITH I/2" VIA EDP
15OLT5 THRU 1/6" STL SPACERS
AS REOV TO SPACE PROM SPLIT
FACE GMU - FILL JOINTS AROUND
CASE TIGHT WITH SEALANT,
ALIGN GASES W/ QL OF BAY AS SHOWN
0
41 , a qJ I
O
CMU PLANTER
COURSING TO MATCH
BUILDIN6
T^N 6Xgf`- PR- r2%VAL-
TA. WALL
L, I -
BATTEN SEAM METAL
CANOPY ROOFING
&jmq-J 1w CoL.ofi
_ T.O. AGCI!NT p:r!t
EL. 116'-04
PAINTED STEEL COLUMN- D�dJZE mloR
B.O. ROOF EA�
EL. I10'-6•
A.UMINIM STOREFRONT SYSTEM-
P" ZI Cz�- Z
T.O. CONC. SLAB ,{�
EL. 1001-00 (HF) .
TA. CONC. S_LAA I �_
M. 96'-0" (L.PJ 0
CINEMA SAVERS
6-PLEX THEATER
FORT COLLWS
COLORADO
PROJECT K: 4521.02
ROTH ■SHEPPARD
A R C H
I T
E
C T
S
IM BLAKE ST. 0350
DEW40. COLORADO E0202
S 05.684. 7007
308.584.
7722(F A
J()
-X N& AYezmE�T
Eki�l ci'h:Y W[51L*N
I 45ra
LAN D5,- I N6 15 U NdtA &t P
GENERAL NOTES:
AL16N ALL GAP FLASHING JOINTS MOTH
MASONRY MORTAR JOINTS OF MA50NRY
COURSE DIRECTLY BELOW GAP FLASHINS
ALIGN ALL METAL ROOF FLASHING JOINTS
MOTH MASONRY MORTAR JOINTS OF MASONRY
COURSE DIRECTLY ABOVE FLASHINS.
i
ALL DRAWMDS AND WRITTEN MATERIAL AREARING
HEREIN CONSTITUTE THE ORIGINAL UNPUBLISHED
WORK OF THE ARCHITECT AND MAY NOT BE
DUPLICATED USED OR DISCLOSED WITHOUT THE
WRITTEN CONSENT OF THE ARCHITECT
CINEMA SAVERS
6-PLEX THEATER
FORT COLLINS,
COLORADO
3 OF 3
C -11 7 18P 19