FIRST AMENDMENT AGREEMENT
THIS AMENDMENT AGREEMENT, made and entered into this/t
day of 1990, by and between the CITY OF FORT COLLINS, COLO-
RADO, municipal corporation ("City"), and STORCK DEVELOPMENT
CORPORATION, a Colorado Corporation ("Developer"), is an amendment to that
certain Development Agreement dated the 4th day of May, 1989, by and
between the City and the Developer, ("Development Agreement").
WHEREAS, the parties hereto previously executed the Development Agree-
mcnt, and
WHEREAS, the Developer has received approval of a replat of Lots I
through 22 into a different configuration; and
WHEREAS, the replat of said lots necessitates the modification of certain
provisions of the Development Agreement; and
WHEREAS, the parties are presently desirous of modifying the Develop-
ment Agreement.
NOW, THEREFORE, in consideration of the promises of the parties
hereto and other good and valuable consideration, the receipt and adequacy of
which is hereby acknowledged, the parties agree as follows:
Subheading 2. Special Conditions, subparagraph B (i) of the Development
Agreement shall be modified in its entirety to provide as follows:
B. Sewer Lines.
(i) Lot 36 is burdened by a utility access easement. Prior to
the issuance of any Certificate of Occupancy for the lot,
the developer shall construct fencing along the perimeter
of said lot to the extent that such perimeter also touches
upon said easement and provided further that a gate of
not less than ten (10) feet in width shall be installed for
utility access to said easement in the fence installed. The
gate shall be installed on the side yard perimeter of the
lot to enable the City to have ready utility access to the
easement.
Subheading 2. Special Conditions, subparagraph C (i) of the Development
Agreement shall be modified in its entirety to provide as follows:
C. Storm drainage lines and appurtenances.
(i) The Developer and the City agree that all on -site and
off -site storm drainage improvements shall be completed
by the Developer prior to the issuance of the 20th
building permit. Completion of improvements shall
include the certification by a licensed professional
engineer that the drainage facilities which service this
development, have been constructed in conformance with
the approved plans.
Except as herein amended or modified, the Development Agreement shall
continue in full force and effect. This Agreement and the Development
Agreement constitute the entire understanding of the parties.
IN WITNESS WHEREOF, the parties hereto have set their hands the day
and year _first above written.
CITY OF FORT COLLINS
A MUNICIPAL CORPORATION
By:
C
St6ven C. Burkett
City Manager
Cityy ler( K �S
APPROVEP-�XS TO FORM:
City Attorney
s 1L /a
,/I)ircctor df ngineering
DEVELOPER:
STORCK DEVELOPMENT CORPORATION,
a Colorado Corporation
By: / /
Rigid Storck, esider�nt
ATTEST:
' a
0
By:
Aletha Langha - o�dwin, Secretary
e/
(corporate scat)
-2-