Loading...
HomeMy WebLinkAboutGOLDEN MEADOWS BUSINESS PARK - Filed DA-DEVELOPMENT AGREEMENT - 2003-11-14SUBDIVISION AGREEMENT THIS AGREEMENT is made and entered into this day of , A.D. 1978, by and between THE CITY OF FORT OOLLINS, Cowes , a municipal corporation, hereinafter sometimes designated as the "City", and Collindale South Group A General Partnership hereinafter designated as the "Developer", WITNESSEPH: WHEREAS, Developer is the owner of certain property situate in the County of Larimer and State of Colorado and legally described as follows: GOMEN MEADOWS BUSINESS PARK, situate in the South 1/2 of Section 31, Township 7 North, Range 68 West of the Sixth P.M, City of Fort Collins. WHEi2EM, Developer desires to develop said property as a cmmtercial subdivision and has submitted to the City a subdivision plat (aryl a site plan of said property is to be developed as a Planned Unit Development), a cony of which is on file in the Office of the City Engineer and by this reference made a part hereof; and WHEREAS, Developer has further submitted to the City a utility plan for said lands, a copy of which is on file in the office of the City Engineer and by this reference made a part hereof; and wHERF,AS, the parties hereto have agreed that the development of said lands will require increased municipal services from the City in order to serve such area and will further require the installation of certain improvements primarily of benefit to tb,e lands to be developed and not to the City of Fort Collins as a whole; and WHEREAS, the City has approved the subdivision plat (and site plan where applicable) submitted by the Developer subject to certain rccTuirements and F. Street improvements (except curbs, gutters and walks) shall not be installed until all utility lines to be placed therein have been completely installed, including all individual lot service lines :leading in and from the main to the property line. G. The installation of all utilities shown on the utility plans shall be inspected by the Engineering Department of the City and shall be subject to such department's approval. The Developer agrees to correct any deficiencies in such installations in order to meet the requirements of the plans and/or specifications applicable to such installation. In case of conflict, the utility plans shall supersede the standard specifications. H. All storm drainage facilities shall be so designed and constructed by the Developer as to protect downstream and adjacent properties against injury and to adequately serve the Property (and other lands as may be required, if any). The Developer has met or exceeded the minimum requirements for storm drainage facilities as have been established by the City in its Drainage Master Plans and Design Criteria. The Developer does hereby indemnify and hold harmless the City from any and all claims that might arise, directly or indirectly, as a result of the discharge of injurious storm drainage or seepage waters from the development in a manner or quantity different from that which was historically discharged and caused by the design or construction of the storm drainage facilities, except for (1) such claims and damages as are caused by the acts or omissions of the City in maintenance of such facilities as have been accepted by the City for maintenance; (2) errors, if any, in the general concept of the City's master plans (but not to include any details of such plans, which details shall be the responsibility of the Developer); and (3) specific directives that may be given to the Developer by the City. Approval of and acceptance by the City of any storm drainage facility design or construction shall in no manner be deemed to constitute a waiver or relinquishment by the City of the aforesaid indemnification. The Developer shall engage a licensed professional engineer to design the storm drainage facilities as aforesaid and it is expressly affirmed hereby that such engagement shall be intended for the benefit of the City, and subsequent purchasers of property in the development. I. The Developer shall pay storm drainage basin fees in accordance with Chapter 26, Article VII of the City Code. Storm drainage improvements eligible for credit or City repayment under the provisions of Chapter 26 are described together with estimated cost of the improvements on the attached Exhibit "B," which improvements, if applicable, shall include right-of-way, design and construction costs. See Section II.C, Special Conditions, Storm Drainage Lines; and Appurtenances, for specific instructions. J. The Developer shall provide the Director of Engineering with certified Record Plan Transparencies on Black Image Diazo 3 Reverse Mylars upon completion of any phase of the construction. K. The Developer specifically represents that to the best of its knowledge all portions of the Property dedicated to the City associated with this development are in compliance with all environmental protection and anti -pollution laws, rules, regulations, orders or requirements, including solid waste requirements, as defined by the U. S. Environmental Protection Agency Regulations at 40 C.F.R., Part 261, and that such portions of the Property as are dedicated to the City pursuant to this development, are in compliance with all such requirements pertaining to the disposal or existence in or on such dedicated property of any hazardous substances, pollutants or contaminants, as defined by the Comprehensive Environmental Response Compensation and Liability Act of 1980, as amended, and regulations promulgated thereunder. Tlae Developer does hereby indemnify and hold harmless the City from any liability whatsoever that may be imposed upon the City by any governmental authority, pertaining to the disposal of hazardous substances, pollutants or contaminants, and cleanup necessitated by leaking underground storage tanks, excavation and/or backfill of hazardous substances, pollutants or contaminants, or environmental cleanup responsibilities of any nature whatsoever on, of or related to any property dedicated to the City pursuant to this development. The Developer further agrees to indemnify and hold harmless the City from any claims or actions based directly, indirectly or in any manner on any of the aforementioned environmental risks brought against the City by third parties arising as a result of the dedication of portions of the Property to the City pursuant to this development. Said indemnification shall not extend to claims, actions or other liability arising as a result of any hazardous substance, pollutant or contaminant: generated or deposited by the City, its agents or representatives, upon portions of the Property dedicated to the City pursuant to this development. II. Special Conditions A. Water Lines Not Applicable. B. Sewer Lines 1. The Developer shall reimburse the City the sum of $536.36 per gross acre for the cost of installation of the Warren Lake Trunk Sanitary Sewer to serve the development. Said reimbursement shall be paid prior to the issuance of the first building permit. C. Storm Drainage Lines and Appurtenances The Developer and the City agree that all on -site and C! off -site storm drainage improvements shall be completed by the Developer in accordance with the approved plans prior to the issuance of any certificate of occupancy. Completion of improvements shall include the certification by a licensed professional engineer that the drainage facilities which serve this development have been constructed in conformance with said approved plans. 2. The Developer agrees to provide and maintain erosion control improvements as shown on the approved utility plans to stabilize all over -lot grading in and adjacent to this development. The Developer shall also be required to post a security deposit in the amount of $1,182.00 prior to beginning construction to guarantee the proper installation and maintenance of the erosion control measures shown on the approved Plan. Said security deposit shall be made in accordance with the criteria set forth in the Storm Drainage: Design Criteria and Construction Standards. D. Streets. 1. Subject to the conditions of this Agreement, the City agrees to reimburse the Developer for oversizing public street improvements along Harmony Road for those portions of said street abutting the Property as shown on the approved utility plans. Reimbursement for Harmony Road shall be for oversizing the sidewalk from residential standards to major arterial standards. The City shall make reimbursement to the Developer for the aforesaid oversized street improvements in accordance with Section 24-121 of the Code of the City. The Developer agrees and understands that the City shall have no obligation to make reimbursement payments for street oversizing unless funds for such payments shall first have been budgeted and appropriated from the Street Oversizing Fund by the City Council; and the Developer further understands that to the extent that funds are not available for such reimbursement, the City may not, in the absence of the Developer's agreement, require the construction, at the Developer's expense, of any oversized portion of streets not reasonably necessary to offset the traffic impacts of the development. The Developer does hereby agree to construct the: aforesaid oversized street improvements with the understanding that the Developer may not be fully reimbursed by the City for the cost of such construction. The Developer further agrees to accept payment in accordance with Section 24-121 (d) of the Code of 'the City as full and final settlement and complete accord and satisfaction of all obligations of the City to make reimbursements to the Developer for street oversizing expenses. It is anticipated by the City that the City's reimbursement, in accordance with Section 24-121 (d), would not be less than fifty percent (50%) of the Developer's actual expenses incurred and will be calculated in accordance with the formula as set forth in Section 24-121 (d). 2. It is understood that the streets to be constructed 5 as described in this section II(D) are "city improvements" and, as such, any contract for the construction of the same must be executed in writing. If the cost of such improvements exceeds the sum of Fifteen Thousand Dollars ($15,000), the contract for the construction of the same must be submitted to a competitive bidding process resulting in an award to the lowest responsible bidder; and evidence must be submitted to the City prior to the commencement of the work showing that the award was given to the lowest responsible bidder. If the cost of such improvements exceeds fifty thousand dollars ($50,000), the contract for the construction of the improvements must be insured by a performance bond or other equivalent security. E. Hazards and Emergency Access. 1. No combustible material will be allowed on the site until a permanent water system is installed by the Developer and approved by the City. 2. Prior to beginning any building construction, the Developer shall provide and maintain at all times an accessway to said building or buildings. Such accessway shall be adequate to handle any emergency vehicles or equipment, and the accessway shall be kept open during all phases of construction. Prior to the City allowing combustible material on the site (other than forming material for concrete footings, foundations and/or concrete walls) such accessway shall be improved to at least 20 feet wide with 4 inches of aggregate base course material compacted according to City Standards and with an 80 foot diameter turnaround at the building end of said accessway. The turnaround is not required if an exit point is provided at the end of the accessway. 3. The issuance of any building permit by the City is made solely at the Developer's own risk and the Developer shall hold the City harmless from any and all damages or injuries arising directly or indirectly out of the issuance of said permit prior to the completion of the requirements in accordance with Section 29- 678 of the Code of the City. III. Miscellaneous A. The Developer agrees to provide and install, at its expense, adequate barricades, warning signs and similar safety devices at all construction sites within the public right-of-way and/or other areas as deemed necessary by the Director of Engineering in accordance with the City's "Work Area Traffic Control Handbook" and shall not remove said safety devices until the construction has been completed and approved by the Director of Engineering. B. The Developer shall, at all times, keep the public right- :l of -way free from accumulation of waste material or rubbish caused by the Developer's operation; shall remove such rubbish no less than weekly and; at the completion of the work, shall remove all such waste materials, rubbish, tools, construction equipment, machinery, and surplus materials from the public right-of-way. The Developer further agrees to maintain the finished street surfaces so that they are free from dirt caused by the Developer's operation. Any excessive accumulation of dirt and/or construction materials shall be considered sufficient cause for the City to withhold building permits and/or certificates of occupancy until the problem is corrected to the satisfaction of the Director of Engineering. If the Developer fails to adequately clean such streets within, two (2) days after receipt of written notice, the City may have the streets cleaned at the Developer's expense and the Developer shall be responsible for prompt payment of all such costs. C. The Developer hereby- agrees that it will require its subcontractors to cooperate with the City's construction inspectors by ceasing operations when winds are of sufficient velocity to create blowing dust which, in the inspector's opinion, is hazardous to the public health and welfare. D. The Developer shall, pursuant to the terms of this Agreement, complete all improvements and perform all other obligations required herein, as such improvements or obligations may be shown on the original plat and related documents, or any replat as subsequently filed by the Developer, and the City may withhold such building permits and certificates of occupancy as it deems necessary to ensure performance hereof. E. Nothing herein contained shall be construed as a waiver of any requirements of the City Code, and the Developer agrees to comply with all requirements of the same. F. In the event the City waives any breach of this Agreement, no such waiver shall be held or construed to be a waiver of any subsequent breach hereof. G. Financial obligations of the City of Fort Collins payable after the current fiscal year and/or not appropriated or budgeted are contingent upon funds for that purpose being appropriated, budgeted and otherwise made available. H. This Agreement shall run with the Property and shall be binding upon the parties hereto, their personal representatives, heirs, successors, grantees and assigns. It is agreed that all improvements required pursuant to this _Agreement touch and concern the Property regardless of whether such improvements are located on the Property. Assignment of interest within the meaning of this paragraph shall specifically include, but not be limited to, a conveyance or assignment of any portion of the Developer's real or 7 proprietary interest in the Property, as well as any assignment of the Developer's rights to develop the Property under the terms and conditions of this Agreement. I. In the event the Developer transfers title to the Property and is thereby divested of all equitable and legal interest in the Property, the City hereby agrees to release said Developer from liability under this Agreement with respect to any breach of the terms and conditions of this Agreement occurring after the date of any such transfer of interest. In such event, the succeeding property owner shall be bound by the terms of this Agreement. J. Each and every term of this Agreement shall be deemed to be a material element hereof. In the event that either party shall fail. to perform according to the terms of this Agreement, such party may be declared in default. In the event that a party has been declared in default hereof, such defaulting party shall be given written notice specifying such default and shall be allowed a period of five (5) days within which to cure said default. In the event the default remains uncorrected, the party declaring default may elect to: (a) terminate the Agreement and seek damages; (b) Treat the Agreement as continuing and require specific performance or; (c) avail itself of any other remedy at law or equity. K. In the event of the default of any of the provisions hereof by either party which shall require the party not in default to commence :Legal or equitable action against said defaulting party, the defaulting party shall be liable to the non -defaulting party for the non -defaulting party's reasonable attorney's fees and costs incurred by reason of the default. Nothing herein shall be construed to prevent or interfere with the City's rights and remedies specified in Paragraph III.D of this Agreement. THE CITY OF FORT COLLINS, COLORADO, a Municipal Corporation By: �Clllty Manager APPROVED AS TO CONTENT: Dirfector of tngineerY g, APPROV AS TO FORM: —� City Attorney DEVELOPER: COLOTEX LECTRI SUPPLY Cobra corp, ati By: (corporate seal) COMPANY, a EXHIBIT "A" 1. Schedule of water lines to be installed out of sequence. Not Applicable. 2. Schedule of sanitary sewer lines to be installed out of sequence. Not Applicable. 3. Schedule of street improvements to be installed out of sequence. Not Applicable. 4. Schedule of storm drainage improvements to be installed out of sequence. Not Applicable. 10 EXHIBIT "B" NOT APPLICABLE 11 conditions which. involve the installation of and construction of utilities and other municipal improvements in connection with said lands. Now, TEiEREFORE,.in consideration of the premises and the terms and conditions herein stated and for other valuable consideration, the adequacy of which is acknowledged by the parties hereto, it is agreed as follows: 1. Except as otherwise herein specifically agreed, the Developer agrees to install and pay for all utility lines, storm drainage facilities, streets and other municipal facilities necessary to serve the lands within the subdivision. 2. water Lines. a. Developer agrees to install all water lines as shown on the utility plans in accordance with the requirements and as shown on said plans, whether such lines are actually on the property, bordering the property or on other lands connecting the subject property to the existing City mater distribution system. b. Such water lines shall be installed in full compliance with the standard specifications of the City on file in the office of the City Engineer and applicable provisions of the City Code relating to the installation of such lines. c. Developer understands and agrees that no building permit for any stricture in the subdivision shall be issued by the City until the water line and the fire hydrant serving such structure is installed and accepted by the City. d. Any water lines described on Exhibit A, attached hereto shall be installed within the time required on Exhibit A. If the City Engineer determines that any lines shown on the utility plans are required to provide service to other areas of the City, those lines shall be installed within the time determined by the City Engineer. 1WM e. All of said lines shall be installed at the sole expense of the Developer, f. The installation of said line shall be inspected by the Engineering Services Department of the City and shall be subject to such department's ao- proval. Developer agrees to correct any deficiencies in such installation in order to meet the requirements of the plans and the specifications applicable to such installation. 3. Sanitary Sewer Collection Lines. a. The Developer agrees to install all sanitary sewer collection lines shown on the utility plans, whether the same be on or off the subject property- b. Such sanitary sewer lines shall be installed in full compliance with the standard specifications of the City on file in the office of the City Engineer relating to the installation of such lines. c. Developer understands and agrees that no building permit shall be issued by the City for any structure in the subdivision until the sanitary sewer line serving such structure is installed and accepted by the City. d. Any sanitary sewer lines described on Exhibit A, attachd hereto shall be installed within the thm required on Exhibit A. If the City Engineer determines that any lines shown in the utility plans are required to provide service to other areas of the City, those lines shall be installed within the time determined by the City Engineer. e. All of said lines shall be installed at the sole expense of the Developer, -3- f. The installation of said lines shall be inspected by the Engineering Services Department of the City and subject to such department's approval. Developer agrees to correct any deficiencies in such installation in order to meet the requirements of the plans and the specifications applicable to such installation. 4. Electric Lines and Facilities. The City Light and Power Department shall install all electric distribution lines and facilities required for the subject property and the Developer shall pay for such work in accordance with the established charges of the Light and Power Department. Such installation shall include all street lights required for the development. 5. storm Sewer Lines and Facilities. a. The Developer shall install all storm sewer lines and facilities shown on the utility plans. b. Such storm sewer lines and facilities shall be installed in full compliance with the standard specifications of the City on file in the office of the City Engineer relating to the installation of such lines. c. Developer agrees to complete the installation of detention facili- ties prior to the issuance by the City of more than 10 building permits and 5 certificates of occupancy for structures within this subdivision. d. All. of said lines and facilities shall be constructed in an orderly fashion, as determined by the City Fngin-eer, so as to prevent damage to other utilities, streets, curb, gutter, sidewalks, and all adjacent properties. e. All of said facilities shall be installed at the sole expense of Developer. f. Th-e installation of all of such lines and facilities shall be in- sr-cted by the I�igin Bring Services INpartrrent of the City and shall be subject -4- to such department's approval. Developer agrees to correct any deficiencies in such installation in order to meet the requirements of the plans and the specifications applicable to such installation. 6. Streets. a. The Developer agrees to install all streets shown on the utility plans, complete with paving, curb, gutter and sidewalks- b. Such streets shall be installed in full compliance with the standard specifications of the City on file in the office of the City Engineer relating to the installation of such streets. c. No building permit for the construction of any structure in the subdivision shall be issued by the City until the street providing access to the structures is improved with at least the gravel base required. Furthermore, no building permit shall be issued by the City for any structure located in excess of 660 feet from a single point of access. d. Any streets described on Exhibit A, attached hereto, shall be completely installed with the time required on Exhibit A. If the City Engineer determines that any streets shown on the utility plans are required to provide access to other areas of the City, those streets shall be installed within the time required by the City Engineer. e. All. of said streets shall be installed at the sole expense of the Developer, except the City shall pay the additional cost of installing McMurray Ave. as a collector rather than as a residential street. f. Developer agrees to correct any deficiencies in such installation in order to meet the requiren—_nts of the plans and the specifications applicable to such installation. g. Stj.peI inprover,ents shall not be installed until all utility lines to k)-- placed in the streets have been completely installed and all services to -5- individual lots have been installed from main utilit- lines to the property line. h. The Developer agrees to provide and install at his expense adequate barricades, warning signs, or other devices on the dead ends of streets to be continued, unfinished crossings, and other sites designated by the City Engineer as areas requiring such Treasures to insure the public safety. 7. other Requirerrents. 8. Miscellaneous. a. This agreement shall be binding upon the parties hereto, their heirs, personal representatives and assigns. b. Nothing herein contained shall be construed as a iraiver of any requirements in the City Subdivision Ordinance or any other provision of the City Code and the Developer agrees to comply with all requirements of the same. ATTEST: City Clerk APPROVED: ifs CIT OF FOJU COU, NS, COLORADO City Manager �f U / eloper Title f EXHIBIT A 1. Schedule of water lines to be installed out of sequence. Not Applicable 2. Schedule of sanitary sewer lines to be installed out of sequence. Not Applicable 3. Schedule of street iRproverients to be installed out of sequence. Not Applicable DEVELOPMENT AGREEMENT THIS AGREEMENT, made and entered into this tS-" day of Dccc+ ber 199by and. between the CITY OF FORT COLLINS, COLORADO, a Municipal Corporation, hereinafter referred to as the "City" and COLOTEX ELECTRIC SUPPLY COMPANY, a Colorado corporation, hereinafter referred to as the "Developer". WITNESSETH: WHEREAS, the Developer is the Owner of certain property situated in the County of Larimer, State of Colorado, (hereafter referred to as the "Property") and legally described as follows, to wit: LOT 11 OF THE GOLDEN MEADOWS BUSINESS PARR, Section 31,; Township 7 North, Range 68 West of the 6th P.M., City of Fort Collins, County of Larimer, State of Colorado. WHEREAS, the Developer desires to develop the Property and has submitted to the City a subdivision plat and/or a site plan and landscape plan, a copy of which is on file in the office of the Director of Engineering and made a part hereof by reference; and WHEREAS, the Developer has further submitted to the City utility plans for the Property, a copy of which is on file in the office of the Director of Engineering and made a part hereof by reference; and WHEREAS, the parties hereto have agreed that the development of the Property will require increased municipal services from the City in order to serve such area and will further require the installation of certain improvements primarily of benefit to the lands to be devs:.loped and net to the City of Fort Collins as a whole; and WHEREAS, the City has approved the subdivision plat and/or site plan and landscape plan submitted by the Developer subject to certain requirements and conditions which involve the installation: of and construction of utilities and other municipal improvements in connection with the Property. NOW, THEREFORE, in consideration of the promises of the parties hereto and other good and valuable consideration, the receipt and adequacy of which is hereby acknowledged, it is agreed as follows: I. General Conditions A. The terms of this Agreement shall govern all development activities of the Developer pertaining to the Property. For the purposes of this Agreement, "development activities" shall include, but not be limited to, the following: (1) The actual construction of improvements, (2) obtaining a building permit therefor, or (3) Any change in grade, contour or appearance of said property caused by, or on behalf of, the Developer with the intent to construct improvements thereon. B. All water lines, sanitary sewer collection lines, storm sewer lines and facilities, streets, curbs, gutters, sidewalks, and bikepaths shall be installed as shown on the approved utility plans and in full compliance with the Council -approved standards and specifications of the City on file in the office of the Director of Engineering at the time of approval of the utility plans relating to the specific utility, subject to a three (3) year time limitation from the date of execution of this Agreement. In the event that the Developer commences or performs any construction pursuant hereto after three (3) years from the date of execution of this agreement:, the Developer shall resubmit the project utility plans to the Director of Engineering for reexamination. The City may require the Developer to comply with approved standards and specifications of the City on file in the office of the Director of Engineering at. the time of resubmittal. C. No building permit for the construction of any structure within the development shall be issued by the City until the water lines, fire hydrants, sanitary sewer lines and streets (with at least the base course completed) serving such structure have been completed and accepted by the City. No building permits shall be issued for any structure located in excess of six hundred sixty feet (6601) from a single point of access. D. Any water lines, sanitary sewer lines, storm drainage lines, and/or streets described on Exhibit "A," attached hereto, shall be installed w-thin the time and/or sequence required on Exhibit "A." If the Director of Engineering has determined that any water lines, sanitary sewer lines, storm drainage facilities and/or streets are required to provide service or access to other areas of the City, those facilities shall be shown on the utility plans and shall be installed by the Developer within the time as established under "Special Conditions" in this document. E. Except as otherwise herein specifically agreed, the Developer agrees to install and pay for all water, sanitary sewer, and storm drainage facilities and appurtenances, and all streets, curbs, gutters, sidewalks, bikeways and other public improvements required by this development as shown on the plat, site, landscape and utility plans, and other approved documents pertaining to this development on file with the City. OA