Loading...
HomeMy WebLinkAbout1800 SOUTH LEMAY AVENUE RIDGEVIEW CLASSICAL SCHOOL - Filed CS-COMMENT SHEETS - 2003-11-03L�J Z E I L E R- P E N N O C K, I N C. / O H A A R C H I T E C T S PRINCIPALS March 12, 2002 PAUI. R. PFNNOCK W. KCLLV 01IV1.R JOHN ('. HF.I.I ORFN Mr. Dave Stringer City of Fort Collins Engineering P.O. Box 580 Fort Collins, CO 80522 Re: Revised Grading/Erosion Control Plan Mr. Stringer: - E N G I N E E R S Enclosed is our response to the Grading Plan review comments for Ridgeview Classical School. Any additional changes to the construction documents, dated 10-19-01, have been clouded and dated Revision 3, 3-8-02. 11. No classrooms are located in the public right-of-way. 12. Sheet SP1.1 indicates the location of proposed underground utilities. This sheet has been included for your review. 37. Attached is a copy of the January 28, 1994 letter from Phillip L. Robinson, P.E., L.S., of Stewart & Associates, to Glen Schlueter at the City of Fort Collins. In this letter. Mr. Robinson references the original 1988 drainage report, as well as the October 1993 as -constructed volumes and calculations. These reports both make reference to the outlet structure on Lemay Avenue. Please note the approval stamp from GDS of Stormwater Utility. 38. The pond has been re -graded so that the pond is completely contained within the property lines. 39. Since it is necessary to maximize the volume of the west pond, we cannot provide the minimum 2-foot set -back from the sidewalk. However, we have provided a guardrail along the sidewalk wherever the pond depth exceeds six inches. 40. The main purpose of the curb wall around the pond is to prevent pedestrians and bicyclists from going into the pond. With the addition of the guardrail, a curb is no longer necessary. 41. According to our information, this is not a utility easement, but a building setback. 42. The site area around the pond has been shown at a larger scale on sheet C2.1 2727 BRYANT ST. Suite 600 DENVER, COLORADO 80211 (303) 455-3322 Fax (303) 455-3708 Project Comments Sheet Selected Departments Department: Traffic Operations Date: April 23, 2004 Project: RIDGEVIEW CLASSICAL SCHOOL SITE PLAN ADVISORY REVIEW #16- 01 All comments must be received by Brian Grubb in Current Planning, no later than the staff review meeting: No Review Date Note - Please identify your redlines for future reference Issue Contact: Eric Bracke Topic: Traffic Number: 45 Created: 2/26/2004 [2/26/04] A Transportation Impact Study is currently being conducted for the proposed development. The study parameters have been modified to address the current problems we are experiencing at the school. These problems include backups into NB Lemay during pick up and drop off times as well as the general confusion of drivers at the Stuart Street entrance/exit. Part of the study will look at using Stuart Street, east of the driveways as part of the drop off area for the older students. The study will also address the access on Lemay as part of the entering circulation. The study is also going to address the addition of phases 3 and 7 at the signal of Lemay and Stuart. Issue Contact: Ward Stanford Topic: Traffic Number: 48 Created: 4/20/2004 [4/20/04] Based upon discussion w/ the Gene Capolla, the Traffic Engineer providing the TIS, and a cursory review of the TIS, the following are my initial comments. Number: 49 Created: 4/20/2004 [4120104] The school currently causes significant traffic congestion on Stuart and Lemay. The improvements outlined in the TIS should be a must before a C.O. is provided for the expansion. The problems at this site will not be completely resolved, but if the improvements are implemented, this schools impacts to Lemay and Stuart should be improved. Number: 50 Created: 4/20/2004 [41201041 The modification of the "pork chop" at the Lemay access may be a viable improvement, but review of the north bound stacking should be done to further verify its true usefulness- The restriping of east Stuart should be done to facilitate additional drop off capability- The south thru lane on Stuart should be converted to a right turn lane only, terminating at the west school access drive. Signahve Date CHECK IIERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat _ Site Drainage Report Other_ Utility _ Redline Utility Landscape Page I Number: 51 Created: 4/20/2004 (4120/04] The east access should be signed and striped to allow for one lane of left turning out bound traffic, and one lane of right turning out bound traffic. Stuart is not capable of safely taking dual left out bound traffic from an access. Number: 52 Created: 4/20/2004 [4/20104] Traffic still has concerns with the dual entrance drive on Stuart being improperly used by motorists, resulting in both east bound lanes experiencing temporary blocking. The entrance should be signed and stripped to give clear direction to the entering motorists from both lanes. The school staff should continue to be present to help direct and control the entering flow. Number: 53 Created: 4/22/2004 (4122104] This is a revision to comment ID # 50. After further review and analysis of the Lemay access, the Traffic Dept. believes the left turn will work without being blocked by the north bound Lemay movement. Therefore the "porkchop" should be modified to aommmodate the south bound left -in movement from Lemay. Page 2 z� STAFF PROJECT REVIEW Cilvol Part Conine �,��4( ARCHITECTURAL RESOURCE GROUP PC Date: 04/23/2004 LARRY TRAMPE 1828 WALLENBERG DR. FT. COLLINS, CO 80526 Staff has reviewed your submittal for RIDGEVIEW CLASSICAL SCHOOLS,PHASE IV ADDITION - SITE 13LAN ADVISORY REVIEW, and we offer the following comments: Department: Current Planning Issue Contact: Bob Barkeen Topic: General Number: 22 Created: 4/20/2004 [4/20/041 The parking agreement appears to be in violation from both parties, the school developing onto adjacent stalls and the office park for not providing necessary maintenance. Department: Engineering Issue Contact: Dave Stringer Topic: General Number: 11 [4/19/04] Created: 3/11/2004 Number: 18 Created: 4/19/2004 [4/19/04] Have only rece'.ved Site, landscape and Grading/ erosion plan. Are there others? EAt Number: 19 Created: 4/19/2004 (4/19/04] Stewart Plans do not match AR Group. Need to show driveway off of Stuart Street on all plan Sheets Itszews t'v<1N.f v wk�h O. Number: 20 Created: 4/19/2004 (4/19/04] Contractor/owner will need to get a drive approach permit from Citys Chief Construction Inspector, Lance Newlin. Phone number is 221-6605 e�, 1— Department: Light & Power Topic: General Number: 17 [4/9/04] No comments. Department: Stormwater Utility Topic: General Number: 21 [4/20/04] No more comments. Issue Contact: Doug Martine Created: 4/9/2004 Issue Contact: Wes Lamarque Created: 4/20/2004 Department: Transportation Planning Issue Contact: Tom Reiff Topic: Transportation Number: 8 Created: 3/9/2004 [4/21/04] After review of the TIS and the recommended changes to the site and circulation pattern, the following comments and information is requested. 1) Please provide a striping plan for Stuart Street and the driveways on Stuart St. Please keep in mind that the bike lanes on Stuad are a community need and shall remain separate facilities from the travel lanes and the on - street parking. 2) No on -street parking will be permitted on Stuart until after the eastern driveway- 6y- 3) If cars are permitted to turn left into the school from Lemay than the school will need to provide educational information to the parents on how to properly circulate through the site 01-- Number: 23 Page 1 Created: 4/22/2004 [4/22/041 For the last several years the Poudre School District and the City's Safe Routes to School Program have been improving the safely around schools for students being picked up or dropped off along the streets or who may bike or walk to school. These improvements include widening existing attached sidewalks to a minimum of 8 feet along school properties to adequately accommodate the students and parents. It is highly recommended that Ridgeview School increase the width of the Stuart St. sidewalk from the existing 4 foot attached sidewalk to an 8 foot attached sidewalk by adding 4 feel to the back of the existing sidewalk. Be sure and return all of your redlined plans when you re -submit If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Yours Truly, Bob Barkeen City Planner Page 2 , Ja-�-28-04 01:31P �E iaCONCEPTUAL REVIEW STAFF COMMENTS City of Fort Coltials MEETING DATE: October 27, 2003 ITEM: Ridgeview Classical School APPLICANT: LarryTrampe Architectural Resource Group 1828 Wallenberg Drive Fort Collins, CO 80527 LAND USE DATA: A request to add a 14,600 sq.ft. addition to the existing Ridgeview Classical School at the southeast comer of Lemay Avenue and East Stuart Street. The property is within the City of Fort Collins and is currently zoned RL — Low Density Residential District. The following departmental agencies have offered comments for this proposal. COMMENTS: Zoning: 1. The land uses within the project are permitted in the zoning district as a Site Plan Advisory Review. This application is forwarded to the Planning and Zoning Board for a consideration. Light and Power: 1. With an increase in the electrical service, there will be a cost to upgrade the facility. 2. The applicant will need to show the location of utility boxes, meters and service limes on the utility drawings and site plan. Poudre Fire Authority: I. Fire hydrants must be located within 300 feet of all buildings capable of delivering water flows of 1,500 gal/min at 20 psi. 2. Address for the buildings will need to visible from the street, with a minimum of 6 inch letters on a contrasting background 3. Buildings may need to be fire sprinklered, based on size and use. Water/Wastewater: I . If there are no changes to the current service, no additional fees or charges will be: assessed. Any increase to the current service will incur additional Plant Investment Fees, development review fees and water rights due at time of building permit. COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281N. College A�•e. PO. Box 580 rort Collins, CO 90522.0580 (970)221-6750 C LKKENT N ANNIN(, 01-PARTMEN1 Jan-28-04 01.32P P.O3 Engineering: I. Additional right-of-way for adjacent streets will need to be dedicated if the existing right-of-way is less than required pursuant to the Larimer County Urban Are: Street Standards. 2. A Traffic Impact Study will need to be submitted for this project. The applicant will need to contact Eric Bracke at (970) 224-6062 for a scoping meeting. The study should focus on mitigating impacts for vehicular traffic exceeding the City's Level of Service criteria. 3. The: applicant will need to repair/replace any damaged curb/gutter or sidewalk along the project frontage. 4. Utility plans, development agreement and a development construction permit wil I need to be prepared for this project. 5. An excavation permit may need to be applied for for the addition. Storm Drainage: 1. This site is within the Spring Creek drainage basin. The development fee is $2,175/acre which is subject to the runoff coefficient reduction. No fee is assessed for increase in impervious area less than 350 sq.R. 2. The applicant will need to update the current master drainage plan for the site. Transportation Planning: 1. Alternative modes, including pedestrian, bicycle and transit, need to be included in the transportation impact study. 2. The applicant should consider ho the drop off and pick up can function to avoid stacking of cars into the parking area, access drives or onto the adjacent streets. 3. Pedestrian connections to the adjacent sidewalks should be provided. Natural Resources: The: City requests that the applicant provide adequate room within the trash enclosure for recycling and use a single trash hauler to minimize trips. The Natural Resources Department requests that the applicant pursues and uses native plants and grasses as much as possible within the project. Current Planning: I . A neighborhood meeting will need to be held for this application. Neighborhood meetings are typically held prior to submitting the project to the City for review - Please contact the Current Planning Department to coordinate this meeting. Due to the large amount of neighborhood concern with the proposal, the notification distance may need to be increased to 1,000 feet. 2. The proposed addition should be designed to mach the existing building as much as possible. 3. The remaining modulars should be removed as part of the addition. 4. Foundation plantings should be provided around the addition, especially adjacent to Stuart Street. 2 RIDGEVIEW CLASSICAL SCHOOL CONCEPTUAL REVIEW STAFF COMMENTS RESPONSE (Refer to Attached Letter) Zoning 1. Light and Power 1. 2. Shown on Site Plan Poudre Fire Authority 1. Existing. 2. Existing. 3. New addition will be fire sprinklered. Water/Wastewater 1. Engineering 1. 2. Traffic impact study will be submitted. 3. 4. No new utilities required other than electrical. Existing utilities shown on Site Plan. 5. Storm Drainage 1. 2. Existing asphalt removed. No additional impervious surface added. Transportation Planning 1. 2. Traffic impact study will be submitted. 3. New sidewalk to Stuart Street is provided. Natural Resources 1. 2. Current Planning 1. 2. Brick and EIFS to match existing. 3. Modular will be removed. 4. Foundation plantings are provided. Date: March 11, 2004 Project: RIDGEVIEW CLASSICAL SCHOOLS, ClAt PHASE IV ADDITION - SITE PLAN ADVISORY REVI All comments must be received by Bob Barkeen in Current Planning, no later than the staff review meeting: No Review Date -- -- Note -Please identify your redlines for future reference - Issue Contact: Dave Stringer Topic: General Created:3/1112004 Number: 11 [3/11 /041 Need traffic impact Study or statement from City Traffic Engineer an Transportation Planner that one is not required Created: 3/11 /2004 Number: 12 [3/11 /041 Please look at how rightin/rightout can be better defined and controlled Topic: Technical Services Created: 3/11/2004 Number: 10 [3/11/041 Text in the 'notes' section is too small for scanning readability. Please enlarge, see red line plans Date Signature CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Drainage Report Plat Site Utility Redline Utility Landscape Page l Citvof Port Collins Current Planning DATE: March 20, 2006 TO: Engineering PROJECT COMMENT SHEET PROJECT PLANNER: Shelby Sommer 16-01B Ridgeview Classical Revised Phase IV Addition — Site Plan Advisory Review ***Please make sure you enter your comments under 16-01B*** Please return all comments to the project planner no later than the staff review meeting: March 29, 2006 Note -Please identify your redlines for future reference ❑ No Problems ❑ Problems or Concerns (see below or attached) Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape PROJECT COMMENT SHEET Current Planning DATE: March 20, 2006 TO: Engineering Pavement PROJECT PLANNER: Shelby Sommer 16-01B Ridgeview Classical Revised Phase IV Addition — Site Plan Advisory Review ***Please make sure you enter your comments under 16-01B*** Please return all comments to the project planner no later than the staff review meeting: March 29, 2006 Note -.Please identify your redlines for future reference 0 No Problems ❑ Problems or Concerns (see below or attached) Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape 3/8/02 Ridgeview Classical School Engineering Response Page 2 of 2 If you have any questions, please call me at (303) 455-3322. Thank you. Zeiler -Pennock, Inc. / OHA Cody Bohalll Project Engineer Paul R. Pennock, P.E. Principal 10211 Project Comments Sheet City of Fort Collins �01Selected Departments Date: April 2, 2006 Project: RIDGEVIEW CLASSICAL SCHOOLS PLAN ADVISORY REVIEW REVISED PHASE IV ADDITION SITE All comments must be received by Shelby Sommer in Current Planning, no later than the staff review meeting: March 29, 2006 Note - Please identify your redlines for future reference Issue Contact: Sheri Wamhoff Topic: General Number: 18 [4/2/06] Please include "1800 South Lemay" filed. Created: 4/2/2006 in the sheet title as that is how the project is Number: 19 Created: 4/2/2006 [4/2/06] The sheet number on the utility plan is: C1.1 of 3 Number: 20 Created: 4/2/2006 [4/2/06] Please add the following indemnification notes to the utility plan sheet: 1. The engineer who has prepared these plans, by execution and/or seal hereof, does hereby affirm responsibility to the Local Entity, as beneficiary of said engineer's work, for any errors and omissions contained in these plans, and approval of these plans by the Local Entity Engineer shall not relieve the engineer who has prepared these plans of all such responsibility. Further, to the extent permitted by law, the engineer hereby agrees to hold harmless and indemnify the Local Entity, and its officers and employees, from and against all liabilities, claims, and demands which may arise from any errors and omissions contained in these plans. 2. 1 hereby affirm that these final construction plans were prepared under my direct supervision, in accordance with all applicable City of Fort Collins and State of Colorado standards and statutes, respectively; and that I am fully responsible for the accuracy of all design, revisions, and record conditions that I have noted on these plans. 3. These plans have been reviewed by the Local Entity for concept only. The review does not imply responsibility by the reviewing department, the Local Entity Engineer, or the Local Entity_tor accuracy and com ness of the calculations. Furthermore, the review does z CCr=' Signature Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat � Site Drainage Report Other Utility Redline Utility Landscape Page 1 not imply that quantities of items on the plans are the final quantities required. The review shall not be construed in any reason as acceptance of financial responsibility by the Local Entity for additional quantities of items shown that may be required during the construction phase. Number: 21 Created: 4/2/2006 [4/2/06] Was there a drainage easement that was dedicated for the pond along Lemay? If so a portion of the easement needs to be vacated for the new building foot print. Page 2 Project Comments Sheet Selected Departments City of Fort Collins Department: Engineering Date: April 26, 2006 Project: RIDGEVIEW CLASSICAL SCHOOLS PLAN ADVISORY REVIEW REVISED PHASE IV ADDITION SITE All comments must be received by Shelby Sommer in Current Planning, no later than the staff review meeting: April 26, 2006 Note - Please identify your redlines for future reference Issue Contact: Sheri Wamhoff Topic: Zoning Number: 23 Created: 4/26/2006 14/26/061 The acceptance language on the deed needs to be changed to the acceptance line for a deed being accepted by the planning and zoning board. Since this project went to the planning and zoning board for a hearing the deed must follow the same process. I am working on having the legal checked. Provide signed copy of the deed along with the TDRF application, TDRF processing fee ($250 check made out to the City of Fort Collins) and filling fee ($21 check made out to Larimer County Clerk and Recorder) with the mylars. Signature CHECK HERE IF YOU WISH Plat Site Utility Redline Utility I�6 6) Date RECEIVE COPIES OF REVISIONS Drainage Report Other Landscape Page 1 Citvof Port Collins Current Planning DATE: March 20, 2006 TO: Engineering PROJECT COMMENT SHEET PROJECT PLANNER: Shelby Sommer 16-01B Ridgeview Classical Revised Phase IV Addition — Site Plan Advisory Review ***Please make sure you enter your comments under 16-01B*** Please return all comments to the project planner no later than the staff review meeting: March 29, 2006 Note -Please identify your redlines for future reference ❑ No Problems ❑ Problems or Concerns (see below or attached) Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape PROJECT COMMENT SHEET Current Planning DATE: March 20, 2006 TO: Engineering Pavement PROJECT PLANNER: Shelby Sommer 16-01B Ridgeview Classical Revised Phase IV Addition — Site Plan Advisory Review ***Please make sure you enter your comments under 16-01B*** Please return all comments to the project planner no later than the staff review meeting: March 29, 2006 Note -.Please identify your redlines for future reference 0 No Problems ❑ Problems or Concerns (see below or attached) Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape Project Comments Sheet City of Fort Collins �01Selected Departments Date: April 2, 2006 Project: RIDGEVIEW CLASSICAL SCHOOLS PLAN ADVISORY REVIEW REVISED PHASE IV ADDITION SITE All comments must be received by Shelby Sommer in Current Planning, no later than the staff review meeting: March 29, 2006 Note - Please identify your redlines for future reference Issue Contact: Sheri Wamhoff Topic: General Number: 18 [4/2/06] Please include "1800 South Lemay" filed. Created: 4/2/2006 in the sheet title as that is how the project is Number: 19 Created: 4/2/2006 [4/2/06] The sheet number on the utility plan is: C1.1 of 3 Number: 20 Created: 4/2/2006 [4/2/06] Please add the following indemnification notes to the utility plan sheet: 1. The engineer who has prepared these plans, by execution and/or seal hereof, does hereby affirm responsibility to the Local Entity, as beneficiary of said engineer's work, for any errors and omissions contained in these plans, and approval of these plans by the Local Entity Engineer shall not relieve the engineer who has prepared these plans of all such responsibility. Further, to the extent permitted by law, the engineer hereby agrees to hold harmless and indemnify the Local Entity, and its officers and employees, from and against all liabilities, claims, and demands which may arise from any errors and omissions contained in these plans. 2. 1 hereby affirm that these final construction plans were prepared under my direct supervision, in accordance with all applicable City of Fort Collins and State of Colorado standards and statutes, respectively; and that I am fully responsible for the accuracy of all design, revisions, and record conditions that I have noted on these plans. 3. These plans have been reviewed by the Local Entity for concept only. The review does not imply responsibility by the reviewing department, the Local Entity Engineer, or the Local Entity_tor accuracy and com ness of the calculations. Furthermore, the review does z CCr=' Signature Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat � Site Drainage Report Other Utility Redline Utility Landscape Page 1 not imply that quantities of items on the plans are the final quantities required. The review shall not be construed in any reason as acceptance of financial responsibility by the Local Entity for additional quantities of items shown that may be required during the construction phase. Number: 21 Created: 4/2/2006 [4/2/06] Was there a drainage easement that was dedicated for the pond along Lemay? If so a portion of the easement needs to be vacated for the new building foot print. Page 2 Project Comments Sheet Selected Departments City of Fort Collins Department: Engineering Date: April 26, 2006 Project: RIDGEVIEW CLASSICAL SCHOOLS PLAN ADVISORY REVIEW REVISED PHASE IV ADDITION SITE All comments must be received by Shelby Sommer in Current Planning, no later than the staff review meeting: April 26, 2006 Note - Please identify your redlines for future reference Issue Contact: Sheri Wamhoff Topic: Zoning Number: 23 Created: 4/26/2006 14/26/061 The acceptance language on the deed needs to be changed to the acceptance line for a deed being accepted by the planning and zoning board. Since this project went to the planning and zoning board for a hearing the deed must follow the same process. I am working on having the legal checked. Provide signed copy of the deed along with the TDRF application, TDRF processing fee ($250 check made out to the City of Fort Collins) and filling fee ($21 check made out to Larimer County Clerk and Recorder) with the mylars. Signature CHECK HERE IF YOU WISH Plat Site Utility Redline Utility I�6 6) Date RECEIVE COPIES OF REVISIONS Drainage Report Other Landscape Page 1 PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: May 23, 2001 TO: Technical Services PROJECT: #16-01 RIDGEVIEW CLASSICAL SCHOOLS— SITE PLAN ADVISORY REVIEW All comments must be received by Brian Grubb in Current Planning no later than the staff review meeting: June 6, 2001 (2-WEEK REVIEW TIME PER PLANNER Note- Please identify your redlines for future reference Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other _Utility —Redline Utility _Landscape City of Fort Collins PROJECT 3� oo COMMENT SHEET City of Fort Collins Current Planning DATE: May 23, 2001 TO: Engineering PROJECT: #16-01 RIDGEVIEW CLASSICAL SCHOOLS —SITE PLAN ADVISORY REVIEW All comments must be received by Brian Grubb in Current Planning no later than the staff review meeting: June 6, 2001 (2-WEEK REVIEW TIME PER PLANNER Note- Please identify your redlines for future reference kx (ado, %.,iLZ w. Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other _Utility _Redli;ae Utility _Landscape PROJECT COMMENT SHEET REC, City of Foil Collins Current Planning DATE: Feblruary 12, 2004 TO: Engineering Pavement PROJECT: #16-01A RIDGEVIEW CLASSICAL SCHOOLS, PHASE IV ADDITION — SITE PLAN ADVISORY REVIEW — TYPE II (LUC) All comments must be received by Bob Barkeen no later than the staff review meeting: March 10, 2004 Note - PLEASE identify your redlines for future reference ,A10 f Nrnne (please print) CHECK HERE, IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat _Site Drainage Report Other _ 0 City of Port Cullins lJtilit�- Rcillinc Utility _Landscape �� Project Comments Sheet Selected Departments CityofFort Department: Engineering Date: April 19, 2004 Project: RIDGEVIEW CLASSICAL SCHOOLS,PHASE IV ADDITION - SITE PLAN ADVISORY' REVIEW All comments must be received by Bob Barkeen in Current Planning, no later than the staff review meeting: April 21, 2004 Note - Please identify your redlines for future reference Issue Contact: Dave Stringer Topic: General Number: 11 Created: 3/11 /2004 [4/19/04] [3/11/04] Need traffic impact Study or statement from City Traffic Engineer and Transportation Planner that one is not required Number: 18 Created: 4/19/2004 [4/19/041 Have only received Site,landscape and Grading/ erosion plan. Are there others? Number: 19 Created: 4/19/2004 [4/19/04] Stewart Plans do not match AR Group. Need to show driveway off of Stuart Street on all plan Sheets Number: 20 Created: 4/19/2004 [4/19/04] Contractor/owner will need to get a drive approach permit from City's Chief Construction Inspector, Lance Newlin. Phone number is 221-6605 Dave Stringer April 19, 2004 Signature Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat _ Site Drainage Report Other_ Utility _ Redline Utility Landscape Page I Project Comments Sheet Selected Departments City of Port Collins M Department: Engineering Date: April 19, 2004 Project: RIDGEVIEIN CLASSICAL SCHOOLS,PHASE IV ADDITION - SITE PLAN ADVISORYREVIEW All comments must be received by Bob Barkeen in Current Planning, no later than the staff review meeting: April 21, 2004 Note - Please identify your redlines for future reference Issue Contact: Dave Stringer Topic: General Number: 11 [4/19/04] Created: 3/11 /2004 [3M/04] Need traffic impact -Study or statement from City Traffic Engineer and yfarisp64tati`8`RPlanne�r that one is not equired _ -- Number: 18 Created: 4/19/2004 [4/19/04] Have only received Site,landscape and Grading/ erosion plan. Are there others? Number: 19 Created: 4/19/2004 [4/19/04] Stewart Plans do not match AR Group. Need to show driveway off of Stuart Street on all plan Sheets Number: 20 Created: 4/19/2004 [4/19/04] Contractor/owner will need to get a drive approach permit from City's Chief Construction Inspector, Lance Newlin. Phone number is 221-6605 Dave Stringer April 19, 2004 Sign nlure Date �— CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat _ Site Drainage Report Other Utility _ Redline Utility Landscape Page I Project Comments Sheet Selected Departments Department: Transportation Planning Date: April 22, 2004 Project: RIDGEVIEW CLASSICAL SCHOOLS,PHASE IV ADDITION - SITE PLAN ADVISORY'REVIEW All comments must be received by Bob Barkeen in Current Planning, no later than the staff review meeting: April 21, 2004 Note - Please identify your redlines for future reference Issue Contact: Tom Reiff Topic: Transportation Number: 8 Created: 3/9/2004 [4/21/04] After review of the TIS and the recommended changes to the site and circulation pattern, the following comments and information is requested. 1) Please provide a striping plan for Stuart Street and the driveways on Stuart St. Please keep in mind that the bike lanes on Stuart are a community need and shall remain separate facilities from the travel lanes and the on -street parking. 2) No on -street parking will be permitted on Stuart until after the eastern driveway. 3) If cars are permitted to turn left into the school from Lemay than the school will need to provide educational information to the parents on how to properly circulate through the site. [3/9/04] No comments at this moment, however, comments may arise once the TIS is provided. Number: 23 Created: 4/22/2004 [4/22/041 For the last several years the Poudre School District and the City's Safe Routes to School Program have been improving the safety around schools for students being picked up or dropped off along the streets or who may bike or walk to school. These improvements include widening existing attached sidewalks to a minimum of 8 feet along school properties to adequately accommodate the students and parents. It is Highly recommended that Ridgeview School increase the width of Signature � -Date CHECK IIF, I; IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat —41— Site Drainage Report Other_ Utility _ Redline Utility Landscape Page I the Stuart St. sidewalk from the existing 4 foot attached sidewalk to an 8 foot attached sidewalk by adding 4 feet to the back of the existing sidewalk. Page 2