Current Plannin-
DATE: April 23, 1999 TO: Engineering
PROJECT: #53-850 CAT 4`h Filing, Building Two, Minor
Amendment, Pacific Financial Centre
All comments must be received by Ted Shepard no later than the staff
review meeting:
Wednesday, May 5, 1999
NC
Engineering Consultants
2900 South College Avenue
Fort Collins, Colorado 80525
303/226-4955January 5, 1988
Mike Herzig
Planning Department
City of Fort Collins
300 LaPorte Avenue
Fort Collins, Colorado 80522
RE: FESPONSE TO CITY'S PRELIMINARY REVIEW COMMENTS ON CENTRE FOR
ADVANCED TECHNOLOGY - FOURTH FILING
Dear Mike:
As per our conversation of January 4th, this letter reflects our
response to the preliminary review comments we have received from
the City of Fort Collins. First of all the drainage comments
from Susan Hayes appear to be final drainage comments which can
easily be addressed with the final submittal. Our response to
the pertinent engineering comments are summarized below.
1. The main entrance from the north is to be off a private
street. The final submittal will clarify this approach.
2. The exit drive will be widened and the northern curb return
modified to prohibit a right -in turning movement.
3. Drake improvements are rot planned at this time since the
City approved plans for this area would raise the grade of
- Drake 1.0-1.5 feet. Improvements will likely be installed
when the City decides to proceed with all improvements of
Drake Road from Shields to Redwing Drive.
If All other engineering comments are considered incidental and will
be addressed during the final submittal. No comments were
received from the Water and Sewer Department.
I trust this letter clarifies our response to the City's
comments.
Sincerely,
RBO, Inc.
Stan A. Myers, P.E.I
cc: Bob Hutchinson
120-008A
Other OfficesVail, Colorado 303/476-6340 • Colorado Springs, Colorado 303/574-3504
CITY OF FORT COLLINS
OFFICE OF DEVELOPMENT SERVICES, PLANNING DEPARTMENT
February 19, 1988
Mr. Frank Vaught and Mr. Joe Frye
Vaught - Frye Architects
2900 South College Avenue
Fort Collins, CO. 80525
Dear Mr. Vaught and Mr. Frye:
Staff has reviewed the final P.U.D. plans for CSURF Project One (C_A_T_
Fourth Filing) and offers the following comments:
1. It is important to coordinate with the Public Service Company on the
treatment of the 12 foot utility casement on Research Blvd. and the 15
foot easement on Drake Road. Public Service is concerned about the
berms and trees and the usability of the casement. Also, please be sure to
coordinate with Mountain Bell.
2. The Development Agreement will contain language addressing the following
concerns of the City Stormwater Utility:
A. There will be Po Certificate of Occupancy until drainage facilities are
complete.
B. Maintenance of on -site drainage facilities shall be the responsibility of
the landowners.
C. All areas disturbed during construction but not constructed as part of
this phase shall be reseeded to prevent erosion.
3. The City Parks and Recreation Department will not be responsible for
maintenance of any landscaping in the public right-of-way on Drake Road.
4. The following note should appear on the landscape plan: "All landscaping
is to be installed as per the phasing plan or secured with an irrevocable
GFr
�.. =. �. '. s:..: ...�'�. v.S:.�,..t i.�.v:.i� .....+:....w+.�..�d.,�i �r�..v...n,-.:•..:S+e.,i�i.-!"�:.h..mr�,t.n6�ti�:.i,.G ..ay..�.<s.r...al.:.,.�cu
OFFICE OI DEVELOPMENT—...� 300 LaPorte Ave P O Box 580 Fort Collins, Colorado 80522 (303) 221 6750
SERVICES, PLANNNG
letter of credit, performance bond, or escrow account prior to issuance of
a Certificate of Occupancy."
5. Overall, Staff is pleased with the landscape plan and would like to
commend the applicant for the generous treatment along the streetscapes.
Please keep in mind, however, that there is controversy surrounding the
placement of street trees along Drake under an R.E.A. power line. This
issue should be resolved as soon as possible.
6. The sidewalk in front of the future two story office building should be
extended to the west property line for future connection to Building A of
Tract U.
7. Will there or will there not be a median in the entrance drive? The
preliminary P.U.D. plan for Tract U shows a median but the Project One
plan does not. If there is to be a median, please show on both the site
and landscape plan.
8. Staff strongly recommends that there be a vehicular access to the adjacent
parking for Tract U. This will contribute to unifying the site and assist
in internal circulation. It may very well be that future employees in the
five proposed buildings in Tract U may wish to use the services of Nor-
larco.
This concludes staff comments. The following deadlines will apply for the
March 28 Planning and Zoning Board hearing:
Plan revisions are due March 2, 1988 (3 copies)
PMT's, colored renderings, and 10 final prints are due March 21, 1988
Final documents are due March 24, 1988
Please feel free to call if there are any questions or concerns.
Sincerely,
Ted Shepard J
Project Planner
cc: Joe Frank, Assistant Planning Director
Mike Herzig, Development Engineer
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: December 9, 1998 TO: Engineering
PROJECT: #53-850 C.A.T. 4th Filing, Building Two, Minor
Amendment (Plat: C-84, Vault: 1501) Pacific
Financial Centre
All comments must be received by Ted Shepard no later than the staff
review meeting:
December 30,1998
Note. This P. U.D.• was approved in 1988 for two buildings with the 2nd building to be
reviewed as a minor amendment.
�eS�rrn4&oe7�O
QQ/ft��-�C/Itt� L�i<CJ if Y'/7L �a:<t-F"Cfc-l�.G LTV% !✓2."1-L��'C� - r �L�;cj/�of�j-�
V U a��d rYl'
Date: 7/i
G(
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_ Fig —.Sk— — 0k
Utility — Rda Utility ids*
Joe Westerberg Architect
12687 West Cedar Drive Suite 320
Lakewood CO 80228
tel: 303.980.5987
fax: 303.980.6142
April 18, 1999
Ted Shepard
Chief Planner
City of Fort Collins
281 North College Avenue
Fort Collins CO 80522-0580
Re: Responses to Review Letter with
Final Submittal of Plans for C. A. T.
4th Filing Minor Amendment
for Pacific Financial Centre
Mr. Shepard:
This letter replies to the comments of the review letter. The items refer to the
numbered comments in the staff letter as follows:
Item 1 - The improvements along Drake are to be coordinated with the
Landowner (C.S.U.R.F.) and the City Manager's Office. The connecting
sidewalk is shown on the site plan.
Item 2 - Refers to Water and Wastewater comments as follows:
Water and sewer lines are shown on the landscape plan as requested. A
note -describing the required separation established by the City of Fort Collins
is in the Standard Notes for Planting on the Site Plan and Landscape Plan.
The service lines and pit shown on the plans are existing and they are
installed to provide service to this proposed building project.
The 1-1/2" meter pit shown is existing, questions regard the meter can be
best answered by on -site observation.
Comments on the Landscape and Utility Plans:
Pacific Financial Centre
• Utility Plan:
page 2
The comments regarding the 1-1/2" meter pit are addressed on the
previous page.
The utility lines are shown based on the best information provided
to this office.
The documentation of the main service within the site was prepared
by RBD Engineering Consultants for the Centre for Advanced Technology
Forth Filing, February 1988 and approved by the City of Fort Collins in
February/March of that year.
The Utility Plan is revised to show the water and sewer mains in
Research Boulevard. The improvements along Drake are to be coordinated
with the Landowner (C.S.U.R.F.) and the City of Fort Collins. The connecting
sidewalk is shown on the site plan.
• Landscape Plan:
The separation requirements are shown on the landscape plan in
the Standard Notes for Planting, as required.
Water and Sewer lines are shown on the landscape plan, as
required.
The landscape shown is to meet the required City of Fort Collins
separations.
Item 3 - The required revisions to the easement along Drake are to be
coordinated between the Landowner (C.S.U.R.F) and the City.
Item 4 - The fire sprinkler system is to be installed as required by the Fire
Department. The site layout is modi{ied as required for Fire Department
standards.
• Item 5 - The addressing numerals are to meet the noted requirements.
• Item 6 - No relocation of telephone facilities is anticipated.
Item 7 - The noted items of: trench, conduit, ditch crossings and street
crossings for telephone facilities are included in the contract for construction.
JOE WESTERBERG ARCHITECT 12687 W CEDAR DRIVE LAKEWOOD CO 80228 (303-980-5987)
Pacific Financial Centre page 3
• Item 8 - Any relocation of electrical facilities is included in the contract for
construction.
• Item 9 - The complete parking lot and drives with landscaping are installed
under phase one, as required. Refer to site plan for layout. Handicapped
parking to be provided for the Norlarco building must be coordinated through
the Landowner.
Item 10 - The parking analysis is shown on the Site Plan, per requirement.
The analysis is for the completed project and the parking ratio does not differ
from the approved C. A. T. Forth Filing Documents.
• Item 11 - Refer to Site Plan for bicycle rack location, per requirement. The
rack is in the identical location as shown on the approved C. A. T. Forth Filing
Documents.
• Item 12 - The concern over lack of "detail' on the south elevation hinges on
the intended meaning of the word. The south elevation does not contain the
same elements as does the northeast. The primary access for the building is
from the vehicular parking on the northeast and the main entrance is oriented
for this access. The Norlarco building placement does the same.
• Item 13 - All exposed elevations are comprised of the same materials. A
building with the clientele that this one has must have complete, well
considered and constructed exterior walls. Any "unfinished" exposed exterior
walls on any phase will not be acceptable.
Item 14 - This building is designed so that it is not only compatible with the
Norlarco building, but also, the surrounding structures which make up the
context of the setting. The stone is to match stone coloring indigenous to the
area.
Item 15 - The enclosed general notes are added to the Site Plan, as required.
• Item 16 - The rooftop mechanical units are screened.
• Item 17 - The enclosed standard landscape notes, are added to the Site Plan
and Landscape Plan, as required. They are identified as Standard Notes for
Planting.
Item 18 - Refer to the Plant List for the quantities, as required.
JOE WESTERBERG ARCHITECT 12687 W CEDAR DRIVE LAKEWOOD CO 80228 (303-980-5987)
Pacific Financial Centre
page 4
Item 19 - The titlefrevision block, legal description, land use data table, vicinity
map, and legend are added to the documents as noted in drawing comments.
Item 20 - The documents are re -numbered, removing the floor plans.
Item 21 - The Site Plan includes the listed information of:
A. Square footage of each phase.
B. Parking stalls dimensions.
C. Building envelope dimensions.
D. Building envelope setbacks to nearest property line.
E. Square footage of existing building.
Item 22 - This building is intended to have only building identification
numerals, if any at all.
Item 23 - The Site Plan includes the trash enclosure, as required.
Item 24 - Please note that the patio is not covered.
If you have questions, or find additional information necessary, please contact
me.
S
Westerberg, Architect