Loading...
HomeMy WebLinkAboutCSU CHALLENGE ROPES COURSE - Filed CS-COMMENT SHEETS - 2003-10-16PROJECT 6 A COMMENT SHEET City of Fort Collins Current Planning DATE: February 18, 2003 TO: Engineering Pavement PROJECT: # 53-85BB CSU ROPES COURSE @ C.A.T. PDP — TYPE I (LUC) All comments must be received by Steve Olt no later than the staff review meeting: March 19, 2003 Note - PLEASE identify your redlines for future reference /Vv C"OF'w; Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site _Drainage Report —Other— Utility _Redline Utility _Landscape city of Fort cottins Topic: General Number: 32 Created: 4/23/2003 Len Hilderbrand of Xcel Energy indicated that Public Service Company has an existing gas main in a 10' wide easement along the north edge of the proposed project. RESPONSE: CSU will contact Len regarding their gas line and easement. Number: 33 Please see the enclosed red -lined Site Plan with several comments/concerns. RESPONSE: The curb cut on Centre Ave. is restricted to maintenance and emergency vehicles only, general public and client vehicles will not be allowed access to the site through this curb cut. This development proposal has been scheduled for an administrative public hearing on Thursday, May 8, 2003 in conference rooms A - D at 281 North College Avenue. The hearing will begin at 4:00 p.m. and this item is one of several scheduled for that date. An agenda will be prepared at a later date but prior to the hearing. The comments and concerns expressed in this letter can be and should be addressed with the required Final Compliance submittal following the public hearing for the PDP. Please check with Steve Olt for submittal requirements. Be sure and return all red -lined plans from City staff when you submit Final Compliance. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970)221-6341. Yours Truly, Steve Olt, City Planner Page 5 City of Fort Collins Current Plannim PROJECT COMMENT SHEET FEB 2 0 2003 DATE: February 18, 2003 TO: Technical Services PROJECT: # 53-85BB CSU RoPES COURSE @ C.A.T. PDP — TYPE I (LUC) D, S All comments must be received by Steve Olt no later than the staff review meeting: March 19, 2003 Note - PLEASE identify your redlines for future reference Nante (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat _Site _Drainage Report _Other Utility _Redline Utility Landscape City of Fort Collins Project Comments Sheet $fp Selected Departments City of Fort Collins Department: Engineering Date: March 17, 2003 Project: CSU ROPES COURSE @ C.A.T. PDP - TYPE I (LUC) #53-85BB All comments must be received by Steve Olt in Current Planning, no later than the staff review meeting: March 19, 2003 Note - Please identify your redlines for future reference Issue Contact: Dave Stringer Copy Topic: General Created: 3/17/2003 Number: 5 Not enough information to review. Please supply Civil Plan showing access drive, rest room utuility services, bridge structural plans and etc. Number: 6 Created: 3/17/2003 Will need signature block on Civil Plans for ditch company signature Number: 7 Created: 3/17/2003 Additional comments with more complete submital Date Signature CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other_ Utility Redline Utility Landscape Page 1 Project Comments Sheet Selected Departments City of Fort Collins Department: Engineering Date: April 16, 2003 Project: CSU ROPES COURSE @ C.A.T. PDP - TYPE I (LUC) #53-85BB All comments must be received by Steve Olt in Current Planning, no later than the staff review meeting: April 16, 2003 Note - Please identify your redlines for future reference Issue Contact: Dave Stringer Topic: General Number: 23 Created: 4/16/2003 Fence shall not encroach into/onto ditch company easement/right-of-way without their permission Number: 24 Created: 4/16/2003 Additional comments with more complete submital Future phases may generate additional comments as it relates to Parking, access road, rest room facilities and etc. Topic: Transportation Number: 18 Created: 4/7/2003 Need to dedicate easement for electric and any other facilites that may be required for this phase. Signature Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other_ Utility Redline Utility Landscape Page 1 Project Comments Sheet Cihof Fort Collins Selected Departments Department: Stormwater Utility Date: April 21, 2003 Project: CSU ROPES COURSE @ C.A.T. PDP - TYPE I (LUC) #53-851313 All comments must be received by Steve Olt in Current Planning, no later than the staff review meeting: April 16, 2003 Note - Please identify your redlines for future reference Issue Contact: Wes Lamarque Topic: Stormwater Number: 25 Created: 4/18/2003 Is any grading being proposed? A grading plan is required if any grading is to be done. Also, no fill is allowed in the floodplain. Number: 26 Created: 4/18/2003 Irrigation approval is required on the plans for any improvements, like the bridge, in the ditch easement or right-of-way. Number: 27 Created: 4/18/2003 No bathroom, or any habital structure, can be located in the flood plain/floodway. Number: 28 Created: 4/21 /2003 A floodplain use permit is required for this site before any construction takes place. Signature /-f/L1�D3 Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other_ Utility Redline Utility Landscape Page 1 µi/y�„rcw✓+ t�PxS�Ca City of Fort Collins STAFF PROJECT REVIEW Colorado State University Facilities Management c/o Fred Haberecht Facilities Services North Ft. Collins, CO 80523-6030 Date: 4/23/2003 Staff has reviewed your submittal for CSU ROPES COURSE @ C.A.T., PROJECT DEVELOPMENT PLAN (PDP) - TYPE I (LUC) #53-851313, and we offer the following comments: ISSUES: Department: Engineering Issue Contact: Dave Stringer Topic: General Number: 23 Created: 4/16/2003 Fence shall not encroach into/onto the Ditch Company easement/right-of-way without their permission. RESPONSE: The fence will not encroach on the ditch. Number: 24 Created: 4/16/2003 Additional comments with more complete submittal. Future phases may generate additional comments as it relates to parking, access road, rest room facilities and etc. RESPONSE: CSU plans to utilize the existing C5U parking lot north of the ditch for parking. Rest room facilities were deleted from the project. Topic: Transportation Number: 18 Created: 4/7/2003 Need to dedicate easement for electric and any other facilities that may be required for this phase. RESPONSE: CSU is working with the ditch company to establish a crossing agreement for utilities and access. Page 1 Department: Light & Power Issue Contact: Doug Martine Topic: Electric Number: 16 Created: 4/2/2003 Light & Power will need to know site dimensions, including area and length of property line along Centre Ave. (street frontage). RESPONSE: The property is 80,360 square feet, and the property line along Centre Ave. is 135.5 feet. Number:31 Created: 4/16/2003 Development of this site will initiate Light & Power development charges. In order to determine these charges, Light & Power will need to know site dimensions (both square footage and front footage along Centre Avenue). RESPONSE: The site is 80,360 square feet. The property line along Centre Ave. is 135.5 feet. Department: Natural Resources Issue Contact: Doug Moore Topic: General Number: 29 Created: 4/23/2003 The Natural Resources has data from past projects in the area that conclude that ditch that runs between the proposed course parking lot and the course serves as a wildlife movement corridor which the Fort Collins Land Use Code (3.4.1(E)) would protect with a 50' Natural Habitat and Features Buffer Zone. Due to the wildlife movement around this ditch lighting of the project should be dealt with in a sensitive manner. The security lighting located along the fencing should be design to light as minimally as possible. Lighting at the gates should light only the gates and be directed in toward the course. Lighting along the fencing on the north side should be relocated closer to the course and light only the course. The project should also be design so that pinch points for wildlife movement don't occur limiting movement between parking and fencing. Fencing should not also limit wildlife movement between the ditch and Spring Creek with also serves as a wildlife movement corridor (3.4.1(F(2,�. RESPONSE: The ropes course has been specifically designed with minimal security lighting. The course will not be operated in night-time conditions. All lighting will be focused toward the interior of the course in order to minimize Pa,,e 2 exterior impacts. Access between parking and the ropes course will not be inhibited and will not restrict wildlife movement along the ditch. Perimeter fencing will not encroach on the ditch and will not limit wildlife access to Spring Creek. Number: 30 Created: 4/23/2003 If bridge construction results in the disturbance of wetlands the disturbance should be restored. RESPONSE: Construction of the bridge will not occur in a wetland area, and any disturbances resulting from construction will be restored. Department: Stormwater Utility Issue Contact: Wes Lamarque Topic: Stormwater Number: 25 Created: 4/18/2003 Is any grading being proposed? A grading plan is required if any grading is to be done. Also, no fill is allowed in the floodplain. RESPONSE: CSU does not plan to alter the current grades. Minor grade changes may be required for accessibility between the pedestrian bridge and the ropes course . Existing vegetation on the course will be removed and replaced with native grasses. Number: 26 Created: 4/18/2003 Irrigation approval is required on the plans for any improvements, like the bridge, in the ditch easement or right-of-way. RESPONSE: C5U will provide plans for irrigation and the bridge. CSU will also obtain a crossing agreement from the ditch company for the bridge. Number: 27 Created: 4/18/2003 No bathroom, or any habitable structure, can be located in the floodplain/floodway. RESPONSE: Restroom facilities have been deleted from the project. CSU does not plan on constructing any habitable structure in the f loodplai n/f loodway. Page 3 Number: 28 Created: 4/21/2003 A floodplain use permit is required for this site before any construction takes place. RESPONSE: CSU will obtain a floodplain use permit from the City. Department: Transportation Planning Issue Contact: Tom Reiff Topic: Transportation Number: 15 Created: 3/28/2003 Staff recommends that adequate bicycle parking facilities be provided for visitors, not only to the ropes course, but to the planned arboretum and soccer fields. RESPONSE: Existing bicycle parking is provided for at the parking lot. Department: Water Wastewater Issue Contact: Jeff Hill Topic: General Number: 20 Created: 4/16/2003 Will water and sewer services be required for this project? If so, show and label. RESPONSE: Water and sewer is not required for this project. Number: 21 Created: 4/16/2003 Provide a grading plan that shows any changes that would affect exiting water and sewer lines in the vicinity of this site. RESPONSE: C5U does not plan to change any existing grades. Existing utilities have been designed around and will not be impacted by the project. Number: 22 Created: 4/16/2003 Field locate, show and label all existing water and sewer lines in this vicinity. See project development plan for other comments. RESPONSE: All utilities will be field located and labeled at CSU's expense prior to start of the project. Department: Current Planning Issue Contact: Steve Olt Page 4