DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: Q42-�Issuance Date: lb loo
Project Name: English Ranch South P.U.D. Third Filing
Project A.K.A.:
Project Location: _ southwest corner of Edmonds Road and Paddington Road
Permittee: William D. Bartran
City and developer contacts: See attached Exhibit `A "for names and phone numbers of all
contact persons for this project.
Fees: Permit Application Fee (paid at the time of application) $ 300.00 (paid)
Construction Inspection Fee (paid prior to issuance of this permit) $ 7,831.60
Total $ 8,131.60
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$ 146,753.78
Form of security deposited with the City: � errER e:�F CkeEy/T
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all
design drawings and specifications the certification of all materials testing by an Engineer. The
Permittee shall have an Engineer prepare revised design drawings and secure City approval for
all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer
represent, as required by the City in the Development Agreement, that the improvements are
constructed in conformance with the approved Utility Plans and the standards and specifications
of the City_ The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to
the City's acceptance of the constructed public improvements. (All references above to the terms
"Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in
conformance with City requirements.
3. Construction time restrictions:
CHM
PROPOSED PROJECT SCHEDULE:
Construction to start within 30 days of all City Approval having been completed.
Completion and walk-through within 6 months of the above date.
�
�o F
oo00p
OOpa
�NOo
N
1
J
< a
F w
W
o o 0 0 0
m0000
0 0 0 0 0 0 0 0 0
mmc0000000
o 0 0 0 0 0
c�mmm�
� �
ZZp
o o n n o
wwwwm
0 0 0 0 0 0 0 0 0
wwwcn corn c� c� n
o 0 0 0 0 0
wwwwww
O pW :U
`A
wwwwww
- p w
a
ul
C
awry
r1
w a
0 O a r, W
0 0
LLIF- N �v.000 4''N ONNcdh O� Z M>
Zb
Q < ~= in 0. N N v �9 N r d' tiro V Q a
H W z U >
-- - - - -Lti w
w = 3
?oQ} of o ZLU
w Lu
❑ CLLJ,-❑ y w a �'' d o r• o o d, 'VI p o y❑
N a-:w t- O v o o q
y H� N 5 o d r' N� ��I.. �,,, Oa�`�i t0�o U
LL cc
O co E O a �- r ` r1 NLU
h�D z
(J O
ul w 0
t =z w
fnLLI
LL
ti F- LU 0LLJ N d. N N f� t�
m 2z;>o N�@JM nos o��pnl���'O ON!,��a'O,Q ! jz
z _ w Q �LLI:U Z
a
�O CL
N� LLLL>-}U LLli L-U U UUUUU cn YLLLLLLLLLL m
J Q J J U U G, J J J J Q G Q QG „j'J J(n pj C'
j� w W w w W W W w O
>
LU
O 0. ZIn
ihul
° v CO
Ow
O U L S W
N U d--. r�• Y O 4 �i '. C f
a ac p �I En
wQ ❑w a 03 4s m' ze
W U> vLLJ
CL
- v �'Zi Ccn _�I u'.. U o W CI
m - >
�Z!A m o n0y�0p-,j V U' @
_F0 :E lu � CJ
LL) vJ w c w d m mn WCZU,>n QI—v�Lm> a_NyH0~
EE
vc co) 3 ���ii�>2E3 nc�ac'oa<c� C.
- - r m m O _� n v vi 0� r p C. O _ n - _I .ni .- - -
No Text
NORWEST BANKS
NORWEST BANK MINNESOTA., NATIONAL ASSOCIATION
ATTN: LETTERS OF CREDIT,
ROANOKE BUILDING, FIFTH FLOOR
109 SOUTH 7TH ST.,
MINNEAPOLIS, MN 55402
TELEX NUMBER: 6734665 SWIFT ADDRESS: NWNBUS44
IMPORTS/EXPORTS 1-800-553-3769
APRIL 05, 2000
TO BENEFICIARY:
CITY OF FORT COLLINS
300 LAPORTE AVENUE
FORT COLLINS CO 80521
ATTN: CITY ATTORNEY
ACCOUNT PARTY:
BARTRAN & COMPANY, INC:.
PO BOX 277
TIMNATH CO 80547
OUR STANDBY LETTER OF CREDIT NUMBER S407591
DEAR SIRS:
WE HEREBY ESTABLISH, AT THE REQUEST AND FOR THE ACCOUNT OF
BARTRAN & COMPANY, INC. PO BOX 277, TINMATH CO 80547, IN YOUR
FAVOR AS BENEFICIARY, OUR IRREVOCABLE LETTER OF CREDIT NUMBER
S407591, IN THE AMOUNT OF USD146,753.78 (ONE HUNDRED FORTY SIX
THOUSAND SEVEN HUNDRED FIFTY THREE AND 78/100 U.S. DOLLARS) (AS
MORE FULLY DESCRIBED BELOW), EFFECTIVE IMMEDIATELY AND EXPIRING
AT THE CLOSE OF BANKING BUSINESS ON MARCH 23, 2001 AT OUR OFFICE
AT NORWEST BANK MINNESOTA N.A. 109 S 7TH ST, 5TH FL, N9312-051,
MINNEAPOLIS, MN 55402, ATN: STANDBY LETTERS OF CREDIT.
THIS LETTER OF CREDIT IS INTENDED FOR THE FUNDING REQUIRED FOR
THE ENGLISH RANCH SOUTH THIRD FILING DEVELOPMENT PROJECT
("DEVELOPMENT PROJECT") FOR THE ASSURANCE OF COMPLETION OF THE
CONSTRUCTION AND THE MAINTENANCE AND REPAIR OF THE PUBLIC
INFRASTRUCTURE IN CONNECTION WITH THE AFORESAID DEVELOPMENT
PROJECT AND ITS ASSOCIATED DEVELOMENT AGREEMENT AND DEVELOPMENT
CONSTRUCTION PERMIT. FUNDS UNDER THIS LETTER OF CREDIT ARE
AVAILABLE TO YOU FOR ONE OR MORE DRAWINGS PRIOR TO THE CLOSE OF
BUSINESS ON MARCH 23, 2001, AGAINST SIGHT DRAFTS IN AN AGGREGATE
CUMULATIVE AMOUNT NOT TO EXCEED USD146,753.78, DATED THE
DATE OF PRESENTATION, DRAWN ON OUR OFFICE REFERRED TO ABOVE
REFERRING THEREON TO THE NUMBER OF THIS LETTER OF CREDIT AND
ACCOMPANIED BY YOUR WRITTEN CERTIFICATE SIGNED BY YOU AND
ACKNOWLEDGED AS THERIN PROVIDED IN THE FORM OF EXHIBIT I
HERETO ATTACHED.
*** CONTINUED ON NEXT PAGE ***
-A'C 42145 MUL (5-91-70474)
NORWEST BANKS
PRESENTATION OF SUCH DRAFT AND CERTIFICATE SHALL BE MADE AT OUR
OFFICE REFERRED TO ABOVE.
UPON THE EARLIER OF; 1) OUR HONORING YOUR DRAFT(S) TOTALING
USD146,753.78 IN THE AGGREGATE PRESENTED ON OR BEFORE THIS
LETTER OF CREDIT EXPIRES PURSUANT TO THE TERMS HEREIN, OR; 2)
THE SURRENDER TO US BY YOU OF THIS LETTER OF CREDIT FOR
CANCELLATION, THIS LETTER OF CREDIT SHALL AUTOMATICALLY
TERMINATE.
IT IS UNDERSTOOD THAT THE AMOUNT OF THIS LETTER OF CREDIT MAY BE
REDUCED AS PUBLIC IMPROVEMENTS ARE CONSTRUCTED AND ACCEPTED BY
CITY, AS COMPONENTS OF THE INFRASTRUCTURE ARE SATISFACTORILY
COMPLETED IN ACCORDANCE WITH THE APPROVED UTILITY PLANS, THE
VALUE OF THE COMPLETED COMPONENTS MAY BE ESTABLISHED FROM THE
DEVELOPMENT CONSTRUCTION PERMIT WORKSHEET FOR DETERMINING
COSTS OF INFRASTRUCTURE CONSTRUCTION AND INSPECTION FEES, WHERE—
UPON THE AMOUNT OF THIS LETTER OF CREDIT MAY BE REDUCED BY THE
VALUE OF THE COMPLETED COMPONENT(S), UPON EXECUTION OF A
"REQUEST FOR AMENDMENT TO LETTER OF CREDIT" IN THE FORM ATTACHED
HERETO AS EXHIBIT 2.
THIS LETTER OF CREDIT SHALL BE SUBJECT TO THE UNIFORM COMMERCIAL
CODE AS IN EFFECT IN THE STATE OF COLORADO AND TO THE EXTENT NOT
INCONSISTENT WITH THE TERMS OF THIS LETTER OF CREDIT AND THE
UNIFORM COMMERCIAL CODE, THE UNIFORM CUSTOMS AND PRACTICE FOR
DOCUMENTARY CREDITS, 2.993 REVISION, ICC PUBLICATION NUMBER 500.
THIS LETTER OF CREDIT WILL BE AUTOMATICALLY EXTENDED WITHOUT
AMENDMENTS FOR ONE YEAR FROM THE PRESENT, AND EACH FUTURE
EXPIRATION DATE THEREOF, UNLESS ISSUER DELIVERS WRITTEN NOTICE
AT LEAST SIXTY (60) DAYS PRIOR TO ANY SUCH EXPIRATION DATE TO THE
CITY OF FORT COLLINS OF ITS INTENT NOT TO RENEW THIS LETTER OF
CREDIT. ANY SUCH NOTICE SHALL BE IN WRITING AND SHALL BE WITH
AN ACKNOWLEDGED RECEIPT, EITHER IN HAND OR BY CERTIFIIED MAIL.
ANY AMENDMENT REQUESTS FOR THIS LETTER OF CREDIT MAY BE
MADE IN THE FORM OF EXHIBIT 2 AND SUCH REQUEST(S) SHALL BE
SUBJECT TO AGREEMENT 13Y THE ACCOUNT PARTY AND NORWEST BANK
MINNESOTA N.A. AND WILL BECOME EFFECTIVE BY OFFICIAL AMENDMENT
TO THE LETTER OF CREDIT ISSUED BY NORWEST BANK MINNESOTA N.A.
THE CITY MAY, AT ANY TIME, MAKE A REQUEST TO AMEND THIS LETTER
OF CREDIT BY SUBMITTING TO NORWEST BANK MINNESOTA N.A.
A FULLY EXECUTED CERTIFICATE IN THE FORM OF EXHIBIT 2,
SUBJECT TO THE AFOREMENTIONED CONDITIONS.
THIS LETTER OF CREDIT IS NOT TRANSFERABLE
*** CONTINUED ON NEXT PAGE ***
;c I, III MUL (5-91 70474J
7- 01
2.11NXIM
NORWEST BANKS
2901790
l r I=
THIS LETTER OF CREDIT SETS FORTH IN FULL OUR UNDERTAKING AND SUCH
UNDERETAKING SHALL NOT IN ANY WAY BE MODIFIED, AMENDED, AMPLIFIED
OR LIMITED BY REFERENCE TO ANY DOCUMENT, INSTRUMENT, OR AGREEMENT
REFERRED TO HEREIN, EXCEPT CERTIFICATES AND DRAFT(S) REFERRED TO
HEREIN AND ANY SUCH REFERENCE SHALL NOT BE DEEMED TO INCORPORATE
HEREIN BY REFERENCE ANY DOCUMENT, INSTRUMENT OR AGREEMENT EXCEPT
FOR SUCH CERTIFICATES AND DRAFT(S).
NORWEST BANK MINNESOTA, N.A.
AUTHORIZED SIGN 2E AUTHORIZED SIGNATURE
*** CONTINUED ON NEXT PAGE ***
'C 42745 MUL (5-91-704,4)
aw 71
IORW_ E&r BANKS
DUR REF. NO. S407591
EXHIBIT 1
CERTIFICATE
THE CITY OF FORT COLLINS HEREBY CERTIFIES AS FOLLOWS WITH RESPECT
TO THE CERTAIN IRREVOCABLE LETTER OF CREDIT NUMBER S407591 DATED
APRIL 5, 2000 ESTABLISHED IN FAVOR OF THE CITY OF FORT COLLINS,
COLORADO (THE "LETTER OF CREDIT")
A) HE/SHE IS AUTHORIZED TO EXECUTE THIS CERTIFICATE ON BEHALF OF
THE CITY OF FORT COLLINS, COLORADO.
Br THE APPLICANT/DEVELOPER IS IN DEFAULT UNDER THE TERMS OF THE
DEVELOPMENT AGREEMENT AND/OR THE DEVELOPMENT CONSTRUCTION
PERMIT.
C) THE SUM OF USD
WHICH IS THE AMOUNTOF THE DRAFT PRESENTED WITH THIS
CERTIFICATE, IS THE AMOUNT CURRENTLY DUE TO THE CITY OF FORT
COLLINS, COLORADO FROM BELTRAN & COMPANY, INC.
D) THE AMOUNT OF THE ACCOMPANYING DRAFT TOGETHER WITH ALL THE
PREVIOUS DRAWS UNDER THE LETTER OF CREDIT DO NOT EXCEED IN
THE AGGREGATE USD146,V53.78; AND
E) THE LETTER OF CREDIT HAS NOT EXPIRED.
IN WITNESS WHEREOF, THE UNDERSIGNED HAS EXECUTED THIS CERTIFICATE
ON BEHALF OF THE CITY OF FORT COLLINS THIS
DAY OF
THE CITY OF FORT COLLINS, COLORADO
A MUNICIPAL CORPORATION
BY:
TII
*** CONTINUED ON NEXT PAGE ***
vG 1: L15 MUL i 5- J 1-70171I
NORWEST BANKS
V J'j
OUR REF. NO. S407591
EXHIBIT 2
REQUEST FOR AMENDMENT TO LETTER OF CREDIT NUMBER S407591
THE CITY OF FORT COLLINS CERTIFIES THAT THE PERSON SIGNING BELOW
IS AUTHORIZED TO EXECUTE THIS REQUEST FOR AMENDMENT TO LETTER OF
CREDIT ON BEHALF OF THE CITY OF FORT COLLINS AND FURTHER
CERTIFIES WITH RESPEC" TO THE PROVISIONS CONTAINED IN THE
DEVELOPMENT PERMIT DA"ED
AND/OR THE DEVELOPMEN" AGREEMENT DATED
BETWEEN THE CITY OF FORT COLLINS, COLORADO (BENEFICIARY) AND
BARTRAN & COMPANY, INC. (THE DEVELOPER), THE FOLLOWING:
(CHECK APPLICABLE SPACES)
THE LETTER OF CREDIT IS TO BE REDUCED TO USD
THE EXPIRATION DATE OF THIS LETTER OF CREDIT IS REVISED TO
BE
THE 60 DAY AUTOMATIC ONE YEAR RENEWAL PROVISION CONTAINED IN
THE LETTER OF CREDIT IS NO LONGER IN EFFECT.
IN WITNESS WHEREOF, THE UNDERSIGNED HAS
ON BEHALF OF THE CITY OF FORT COLLINS,
DAY OF
CITY OF FORT COLLINS COLORADO
A COLORADO MUNICIPAL CORPORATION
m
AND TITLE
EXECUTED THIS CERTIFICATE
COLORADO THIS
NC 4,'4S MUL 15-91-i0474J
EXHIBIT "A"
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name: English Ranch South P.U.D. 3`d Filing
Project A.K.A.: N/A
City Staff Contact Persons:
Development Engineer: Marc Virata
281 N. College Avenue, Fort Collins, CO 80524
(970)221-6605 x7188
mvirata@ci.fort-collins.co.us
Construction Inspector: Dave Burke
281 N. College Avenue, Fort Collins, CO 80524
(970)221-6605 x7132
Cell (970)
Current Planner: Steve Olt
281 N. College Avenue, Fort Collins, CO 80524
(970) 221-6750 x6341
Water Utilities Engineer: Roger Buffington
700 Wood Street, Fort Collins, CO 80521
(970) 221-6854
Erosion Control Inspector: Bob Zackley
700 Wood Street, Fort Collins, CO 80521
(970)224-6063
Natural Resources: Kim Kreimeyer
281 N. College Avenue, Fort Collins, CO 80524
(970)221-6641
Traffic Operations: Eric Bracke
625 Ninth Street, Fort Collins, CO 80524
(970)224-6062
Street Closures: Syl Mireles
625 Ninth Street, Fort Collins, CO 80524
(970)221-6815
Transportation Planning: Kathleen Reavis
210 E. Olive, Fort Collins, CO 80524
(970)224-6140
Forestry: Tim Buchanan
281 N. College Avenue, Fort Collins, CO 80524
(970)221-6641
Light and Power:
Developer's Contact Persons:
Project Manager:
Developer/Owner:
Doug Martine
700 Wood Street, Fort Collins, CO 80521
(970)224-6152
William D. Bartran
P.O. Box 277, Timnath, CO 80547
(office) 970-229-1629
(cellular) 970-222-1588
(fax) 970-292-0177
William D. Bartran
English Ranch South LLC
P.O. Box 277, Timnath, CO 80547
Architect/Planner: Cathy Mathis
VF Ripley Associates, Inc.
1113 Stoney Hill Drive, Fort Collins, CO 80525
(office) 224-5828
Project Engineer: Phil Robinson
Stewart & Associates
103 S. Meldrum, Fort Collins, CO 80521
(office) 482-9331
General Contractor: same as Developer/Owner
4. The applicant understands that additional permits may be required for this development
project and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design,
traffic study, drainage report, plat easements and any other official documents), shall be kept on
the development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use
Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration
date. Such application shall contain information sufficient to justify the granting of the
extension. An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions
contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or
Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable,
are met. If the Development Agreement does not specify times for completion of public
improvements, or if there is no Development Agreement, then the improvement requirements
specified in Section 24-95 of the City Code shall apply, which provides that construction of all
improvements shall !be required prior to the time of issuance of the first building permit .
8. Acceptance by the City of the public improvements shall be after (1) final inspection has
been conducted by the City ; (2) punch list items from the final inspection are completed and
accepted by the City; and (3) required certifications from the licensed professional engineer that
improvements are completed to City standards, specifications and approved Utility Plans and the
"as -constructed" plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the
City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the
Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of
the Land Use Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty four (24) hours prior to
any planned construction on this project. All required perimeter silt fencing and other
erosion/sediment control best management practices (BMP's) that can be installed prior to
DCP PRECONSTRUCTION MEETING ATTENDANCE SHEET
Contact name
Company Name
Address
Phone Number
lv,4Rc vledra
�' i ry c�/Gi-vc: c-2 ivG
2z�-GGBc�-
i
rt4
.on Services
Engineering Department
City of Fort Collins
March 22, 2000
Sue Wagner
Norwest Bank
401 S College Avenue
Fort Collins, CO 80524
Dear Sue:
This letter is in reference to the issued irrevocable standby letter of credit number S407517 (in the
amount of $146,753.78.) Please consider this as a request to cancel said letter of credit. It is the
City's understanding that a new letter of credit will instead be drafted and established for the
English Ranch South 3`d Filing P.U.D.
Please inform me of any concerns or questions you might have.
Sincerely,
MarcP. Virata
Development Review Engineer
281 North College Aeelue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605
City of Fort Collins, Colorado
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: 0 C>" O6 Issuance Date:
Project Name: English Ranch South P.U.D. Third Filing
Project AKA.:
Project Location: _ southwest corner of Edmonds Road and Paddington Road
Permittee: William D. Bartran
City and developer contacts: See attached Exhibit `A "for names and phone numbers of all
contact persons for this project.
C=TTe
FOR 3
COLLI
- 1 MDRTH C=OUEGE
C9707 221-6065
Fees: Permit Application Fee (paid at the time of application) $ 300.00 (paidi
Construction Inspection Fee (paid prior to issuance of this permit) $ 7,831.60
Total $ 9,131.60
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$ 146,753.78
Form of security deposited with the City: L BTTER CAP Zf'2Eb/T
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all
design drawings and specifications the certification of all materials testing by an Engineer. The
Permittee shall have an Engineer prepare revised design drawings and secure City approval for
all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer
represent, as required by the City in the Development Agreement, that the improvements are
constructed in conformance with the approved Utility Plans and the standards and specifications
of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to
the City's acceptance: of the constructed public improvements. (All references above to the terms
"Project Engincer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.)
All contractors who perform work on this project must be bonded and licensed in
conformance with City requirements.
3. Construction time restrictions:
E_;:
rT n
construction must be in place and inspected by the City Erosion Control Inspector before any
land disturbing activity begins.
11. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
12. Other conditions:
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of
the owners of the property (including all owners having legal or equitable interest in the real property,
as defined in Section 1-2 of the City Code; and including common areas legally connected to or
associated with the property which is the subject of this application) without whose consent and authority
the requested action could not lawfully be accomplished. Pursuant to said authority, 1 hereby permit City
officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such
property to perform work required of the applicant if the applicant were to fail to perform the required
work. I also acknowledge that I have read this permit document with all its requirements and
conditions, and I agree to all of the terms and conditions so stated in this permit.
Applicant/Project Manager's Signature�Dater
Approval for issuance:
1
City Engineer Approval: /�1'_-Date-
(Permit
1 (Permit Issuance Date)
construction must be in place and inspected by the City Erosion Control Inspector before any
land disturbing activity begins.
11. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
12. Other conditions:
n/a
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of
the owners ofthe property (including all owners having legal or equitable interest in the real property,
as defined in Section 1-2 of the City Code; and including common areas legally connected to or
associated with the property which is the subject of this application) without whose consent and authority
the requested action could not lawfully be accomplished. Pursuant to said authority, 1 hereby permit City
officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such
property to perform work required of the applicant if the applicant were to fail to perform the required
work. I also acknowledge that I have read this permit document with all its requirements and
conditions, and I agree to all of the terms and conditions so stated in this permit.
Applicant/Project Manager's
Approval for issuance:
7
f ° 417 C0
City Engineer Approval: Date:
/ (Permit Issuance Date)
DEVELOPMENT CONSTRUCTION PERMIT
APPLICATION
(2/16/99)
For City use only: Application Number: _ A053-99 Application Date:
Permit application fee: S 300.00
INSTRUCTIONS:
1. Complete this form (some questions may not apply to you) and attach all necessary
documents and submit to the Development Engineering Section of the City.
2. Ifyou have any questions contact the Development Engineer
Marc Virata at 221-6750.
3. Submit the Application and pay the Application Fee at the fee at the Engineering
counter at 281 No. College Avenue.
PROJECT INFORMATION:
Project Name (as approved by the City):
Enn2lish Ranch South P.U.D. Third Filing
Project A.K.A. (Marketing name if different from Project Name):
Project Location: _ southwest corner of Edmonds Road and Paddington Road
Property Owner(At the time of this permit
Individual Name:
Company Name
Address:
Phone number(s):
Office: 97r XA` '-
Cellphone: -, ,)--i h'>>
Fax number: , , 2 -i / 7 -7
Email:
i_ ._ -7-1
Applicant/Project Manager (The primary contact person for all matters regarding this project, and
the person responsible for all matters referencing "the Developer" in the Development Agreement for
this project): ,
Individual Name:
Company Name
Address
Phone number(s):
Office:
Cellphon a
Fax number:
Email:
Project Engineer (A Colorado licensed professional engineer who is the civil engineer the person
responsible for the design of this project, responsible for certification that improvements are
02-10-00 0207 CHECK {00.00
constructed in accordance with approved plans, responsible for making revisions to plans with City
approval and for providing as -constructed plans): Individual Name: -+n_ - + .4 ."� t
Company Name "jr- dz
Address:
Phone number(s):
Office:
Cellphone:
Fax number: �;1r2
Email:
Professional License Number:
Developer (The party or parties referenced in the Development Agreement who are responsible for
the Developer's obligations contained in the Agreement -add additional names below):
Individual Name: CG; XA'tFrn -
Company Name :7`/ ABC
Address: n t 7 '7 rrrt" 5r-o , _Y 1
Phone number(s):
Office:
Cellphone:
Fax number:: 7'7
Email:
General Contractor (The contractor in overall charge of the public infrastructure construction):
Individual Name:
Company Name: l
Address: _47
Phone number(s): Office: <7'
Cellphone:
Fax number:
Email:
If you have no General Contractor, list all other contractors below.
Grading contractor: ,
Individual Name: i�l �'f ��"� " '
Company Name :
Address: "5
Phone number(s):
Office: 7
Cellphone:
Fax number:
Email:
Utility contractor:
Individual Name:
Company,Name :
Addressi � `,•
Phone number(s):
Office: /'/
Cellphone: _
Fax number:
Email:
Concrete contractor for flat work:
Individual Name % '_ f —
Company Name W
Address: A
Phone number(s):
Office:
Cellphone:
Fax number:
Email:
Concrete contractor for structures:
Individual Name: iz
Company Name
Address:
Phone number(s):
Office:
Cellphone:
Fax number:
Email:
Paving contractor:
Individual Name:
Company Name
Address:�—
Phone munber(s):
Office:
% /� ''/t i'✓_
:�_
Cellphone:
Fax number:
Email:
Landscape contractor:
Individual Name:
<
r.
Company Name:
fir !
Address:
Phone number(s):
`l n
Office:
Cellphone:
Fax number:l
Email:
Other contractors and parties involved in the project:
SUBMIT THE FOLLOWING ITEMS (Required for all projects):
• 81/2"xl l" copy of the Site Plan
• Proposed Project Schedule
Project quantities and cost estimate for all of the public improvements to be constructed. In
addition, include all private improvements that are required to be inspected by the City
Construction Inspectors. This information must be submitted in the format shown on the
attached form titled "Project Quantities and Cost Estimate Sheet."
ADDITIONAL SUBMITTALS (Required if checked):
❑ Traffic control plan(s) for the project
❑ Proposed haul routes shown on a City map
❑ Shop drawings
❑ Other
CONSTRUCTION COORDINATION MEETING: A construction coordination meeting to
discuss plans and special requirements for your project, is required for all development projects. The
people required to attend the meeting are the Project Manager, Project Engineer, Developer,
Architect/Land Planner and General Contractor (if no General Contractor, representatives for each of
the contractors expected to work on this project)
People to Attend: List the peoples names and titles for those who will attend the pre -
construction meeting:
Name Title
AF7 X-fMl ' /,(
Name Title
ESTIMATED COST OF INFRASTRUCTURE IMPROVEMENTS: Provide the estimated
value of all public infrastructure improvements that will be constructed and accepted by the City to
own and maintain. In addition provide the value of all private infrastructure improvements that the
City will inspect and require certification for. The estimate shall be in the same format as the
attached sheet titled "Project Quantities and Cost Estimate Sheet."
Public infrastructure, estimated cost: S
Private infrastructure, estimated cost:
I certify that the information on this permit application along with the required additional submittals
are true and correct to the best of my knowledge, and that in filing this application I am acting with
the knowledge, consent, and authority of the owners of the property (including all owners having
legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and
including common areas legally connected to or associated with the property which is the subject of
this application) without whose consent and authority the requested action could not lawfully be
accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property
for purposes of inspection and, if necessary, to enter upon such property to perform work required of
the applicant if the applicant were to fail to perform the required work.
ram