Loading...
HomeMy WebLinkAboutENGLISH RANCH SOUTH PUD THIRD - Filed DCP-DEV. CONSTRUCTION PERMIT - 2003-09-24City of Fort Collins, Colorado DEVELOPMENT CONSTRUCTION PERMIT Permit Number: Q42-�Issuance Date: lb loo Project Name: English Ranch South P.U.D. Third Filing Project A.K.A.: Project Location: _ southwest corner of Edmonds Road and Paddington Road Permittee: William D. Bartran City and developer contacts: See attached Exhibit `A "for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee (paid at the time of application) $ 300.00 (paid) Construction Inspection Fee (paid prior to issuance of this permit) $ 7,831.60 Total $ 8,131.60 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 146,753.78 Form of security deposited with the City: � errER e:�F CkeEy/T PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City_ The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. 3. Construction time restrictions: CHM PROPOSED PROJECT SCHEDULE: Construction to start within 30 days of all City Approval having been completed. Completion and walk-through within 6 months of the above date. � �o F oo00p OOpa �NOo N 1 J < a F w W o o 0 0 0 m0000 0 0 0 0 0 0 0 0 0 mmc0000000 o 0 0 0 0 0 c�mmm� � � ZZp o o n n o wwwwm 0 0 0 0 0 0 0 0 0 wwwcn corn c� c� n o 0 0 0 0 0 wwwwww O pW :U `A wwwwww - p w a ul C awry r1 w a 0 O a r, W 0 0 LLIF- N �v.000 4''N ONNcdh O� Z M> Zb Q < ~= in 0. N N v �9 N r d' tiro V Q a H W z U > -- - - - -Lti w w = 3 ?oQ} of o ZLU w Lu ❑ CLLJ,-❑ y w a �'' d o r• o o d, 'VI p o y❑ N a-:w t- O v o o q y H� N 5 o d r' N� ��I.. �,,, Oa�`�i t0�o U LL cc O co E O a �- r ` r1 NLU h�D z (J O ul w 0 t =z w fnLLI LL ti F- LU 0LLJ N d. N N f� t� m 2z;>o N�@JM nos o��pnl���'O ON!,��a'O,Q ! jz z _ w Q �LLI:U Z a �O CL N� LLLL>-}U LLli L-U U UUUUU cn YLLLLLLLLLL m J Q J J U U G, J J J J Q G Q QG „j'J J(n pj C' j� w W w w W W W w O > LU O 0. ZIn ihul ° v CO Ow O U L S W N U d--. r�• Y O 4 �i '. C f a ac p �I En wQ ❑w a 03 4s m' ze W U> vLLJ CL - v �'Zi Ccn _�I u'.. U o W CI m - > �Z!A m o n0y�0p-,j V U' @ _F0 :E lu � CJ LL) vJ w c w d m mn WCZU,>n QI—v�Lm> a_NyH0~ EE vc co) 3 ���ii�>2E3 nc�ac'oa<c� C. - - r m m O _� n v vi 0� r p C. O _ n - _I .ni .- - - No Text NORWEST BANKS NORWEST BANK MINNESOTA., NATIONAL ASSOCIATION ATTN: LETTERS OF CREDIT, ROANOKE BUILDING, FIFTH FLOOR 109 SOUTH 7TH ST., MINNEAPOLIS, MN 55402 TELEX NUMBER: 6734665 SWIFT ADDRESS: NWNBUS44 IMPORTS/EXPORTS 1-800-553-3769 APRIL 05, 2000 TO BENEFICIARY: CITY OF FORT COLLINS 300 LAPORTE AVENUE FORT COLLINS CO 80521 ATTN: CITY ATTORNEY ACCOUNT PARTY: BARTRAN & COMPANY, INC:. PO BOX 277 TIMNATH CO 80547 OUR STANDBY LETTER OF CREDIT NUMBER S407591 DEAR SIRS: WE HEREBY ESTABLISH, AT THE REQUEST AND FOR THE ACCOUNT OF BARTRAN & COMPANY, INC. PO BOX 277, TINMATH CO 80547, IN YOUR FAVOR AS BENEFICIARY, OUR IRREVOCABLE LETTER OF CREDIT NUMBER S407591, IN THE AMOUNT OF USD146,753.78 (ONE HUNDRED FORTY SIX THOUSAND SEVEN HUNDRED FIFTY THREE AND 78/100 U.S. DOLLARS) (AS MORE FULLY DESCRIBED BELOW), EFFECTIVE IMMEDIATELY AND EXPIRING AT THE CLOSE OF BANKING BUSINESS ON MARCH 23, 2001 AT OUR OFFICE AT NORWEST BANK MINNESOTA N.A. 109 S 7TH ST, 5TH FL, N9312-051, MINNEAPOLIS, MN 55402, ATN: STANDBY LETTERS OF CREDIT. THIS LETTER OF CREDIT IS INTENDED FOR THE FUNDING REQUIRED FOR THE ENGLISH RANCH SOUTH THIRD FILING DEVELOPMENT PROJECT ("DEVELOPMENT PROJECT") FOR THE ASSURANCE OF COMPLETION OF THE CONSTRUCTION AND THE MAINTENANCE AND REPAIR OF THE PUBLIC INFRASTRUCTURE IN CONNECTION WITH THE AFORESAID DEVELOPMENT PROJECT AND ITS ASSOCIATED DEVELOMENT AGREEMENT AND DEVELOPMENT CONSTRUCTION PERMIT. FUNDS UNDER THIS LETTER OF CREDIT ARE AVAILABLE TO YOU FOR ONE OR MORE DRAWINGS PRIOR TO THE CLOSE OF BUSINESS ON MARCH 23, 2001, AGAINST SIGHT DRAFTS IN AN AGGREGATE CUMULATIVE AMOUNT NOT TO EXCEED USD146,753.78, DATED THE DATE OF PRESENTATION, DRAWN ON OUR OFFICE REFERRED TO ABOVE REFERRING THEREON TO THE NUMBER OF THIS LETTER OF CREDIT AND ACCOMPANIED BY YOUR WRITTEN CERTIFICATE SIGNED BY YOU AND ACKNOWLEDGED AS THERIN PROVIDED IN THE FORM OF EXHIBIT I HERETO ATTACHED. *** CONTINUED ON NEXT PAGE *** -A'C 42145 MUL (5-91-70474) NORWEST BANKS PRESENTATION OF SUCH DRAFT AND CERTIFICATE SHALL BE MADE AT OUR OFFICE REFERRED TO ABOVE. UPON THE EARLIER OF; 1) OUR HONORING YOUR DRAFT(S) TOTALING USD146,753.78 IN THE AGGREGATE PRESENTED ON OR BEFORE THIS LETTER OF CREDIT EXPIRES PURSUANT TO THE TERMS HEREIN, OR; 2) THE SURRENDER TO US BY YOU OF THIS LETTER OF CREDIT FOR CANCELLATION, THIS LETTER OF CREDIT SHALL AUTOMATICALLY TERMINATE. IT IS UNDERSTOOD THAT THE AMOUNT OF THIS LETTER OF CREDIT MAY BE REDUCED AS PUBLIC IMPROVEMENTS ARE CONSTRUCTED AND ACCEPTED BY CITY, AS COMPONENTS OF THE INFRASTRUCTURE ARE SATISFACTORILY COMPLETED IN ACCORDANCE WITH THE APPROVED UTILITY PLANS, THE VALUE OF THE COMPLETED COMPONENTS MAY BE ESTABLISHED FROM THE DEVELOPMENT CONSTRUCTION PERMIT WORKSHEET FOR DETERMINING COSTS OF INFRASTRUCTURE CONSTRUCTION AND INSPECTION FEES, WHERE— UPON THE AMOUNT OF THIS LETTER OF CREDIT MAY BE REDUCED BY THE VALUE OF THE COMPLETED COMPONENT(S), UPON EXECUTION OF A "REQUEST FOR AMENDMENT TO LETTER OF CREDIT" IN THE FORM ATTACHED HERETO AS EXHIBIT 2. THIS LETTER OF CREDIT SHALL BE SUBJECT TO THE UNIFORM COMMERCIAL CODE AS IN EFFECT IN THE STATE OF COLORADO AND TO THE EXTENT NOT INCONSISTENT WITH THE TERMS OF THIS LETTER OF CREDIT AND THE UNIFORM COMMERCIAL CODE, THE UNIFORM CUSTOMS AND PRACTICE FOR DOCUMENTARY CREDITS, 2.993 REVISION, ICC PUBLICATION NUMBER 500. THIS LETTER OF CREDIT WILL BE AUTOMATICALLY EXTENDED WITHOUT AMENDMENTS FOR ONE YEAR FROM THE PRESENT, AND EACH FUTURE EXPIRATION DATE THEREOF, UNLESS ISSUER DELIVERS WRITTEN NOTICE AT LEAST SIXTY (60) DAYS PRIOR TO ANY SUCH EXPIRATION DATE TO THE CITY OF FORT COLLINS OF ITS INTENT NOT TO RENEW THIS LETTER OF CREDIT. ANY SUCH NOTICE SHALL BE IN WRITING AND SHALL BE WITH AN ACKNOWLEDGED RECEIPT, EITHER IN HAND OR BY CERTIFIIED MAIL. ANY AMENDMENT REQUESTS FOR THIS LETTER OF CREDIT MAY BE MADE IN THE FORM OF EXHIBIT 2 AND SUCH REQUEST(S) SHALL BE SUBJECT TO AGREEMENT 13Y THE ACCOUNT PARTY AND NORWEST BANK MINNESOTA N.A. AND WILL BECOME EFFECTIVE BY OFFICIAL AMENDMENT TO THE LETTER OF CREDIT ISSUED BY NORWEST BANK MINNESOTA N.A. THE CITY MAY, AT ANY TIME, MAKE A REQUEST TO AMEND THIS LETTER OF CREDIT BY SUBMITTING TO NORWEST BANK MINNESOTA N.A. A FULLY EXECUTED CERTIFICATE IN THE FORM OF EXHIBIT 2, SUBJECT TO THE AFOREMENTIONED CONDITIONS. THIS LETTER OF CREDIT IS NOT TRANSFERABLE *** CONTINUED ON NEXT PAGE *** ;c I, III MUL (5-91 70474J 7- 01 2.11NXIM NORWEST BANKS 2901790 l r I= THIS LETTER OF CREDIT SETS FORTH IN FULL OUR UNDERTAKING AND SUCH UNDERETAKING SHALL NOT IN ANY WAY BE MODIFIED, AMENDED, AMPLIFIED OR LIMITED BY REFERENCE TO ANY DOCUMENT, INSTRUMENT, OR AGREEMENT REFERRED TO HEREIN, EXCEPT CERTIFICATES AND DRAFT(S) REFERRED TO HEREIN AND ANY SUCH REFERENCE SHALL NOT BE DEEMED TO INCORPORATE HEREIN BY REFERENCE ANY DOCUMENT, INSTRUMENT OR AGREEMENT EXCEPT FOR SUCH CERTIFICATES AND DRAFT(S). NORWEST BANK MINNESOTA, N.A. AUTHORIZED SIGN 2E AUTHORIZED SIGNATURE *** CONTINUED ON NEXT PAGE *** 'C 42745 MUL (5-91-704,4) aw 71 IORW_ E&r BANKS DUR REF. NO. S407591 EXHIBIT 1 CERTIFICATE THE CITY OF FORT COLLINS HEREBY CERTIFIES AS FOLLOWS WITH RESPECT TO THE CERTAIN IRREVOCABLE LETTER OF CREDIT NUMBER S407591 DATED APRIL 5, 2000 ESTABLISHED IN FAVOR OF THE CITY OF FORT COLLINS, COLORADO (THE "LETTER OF CREDIT") A) HE/SHE IS AUTHORIZED TO EXECUTE THIS CERTIFICATE ON BEHALF OF THE CITY OF FORT COLLINS, COLORADO. Br THE APPLICANT/DEVELOPER IS IN DEFAULT UNDER THE TERMS OF THE DEVELOPMENT AGREEMENT AND/OR THE DEVELOPMENT CONSTRUCTION PERMIT. C) THE SUM OF USD WHICH IS THE AMOUNTOF THE DRAFT PRESENTED WITH THIS CERTIFICATE, IS THE AMOUNT CURRENTLY DUE TO THE CITY OF FORT COLLINS, COLORADO FROM BELTRAN & COMPANY, INC. D) THE AMOUNT OF THE ACCOMPANYING DRAFT TOGETHER WITH ALL THE PREVIOUS DRAWS UNDER THE LETTER OF CREDIT DO NOT EXCEED IN THE AGGREGATE USD146,V53.78; AND E) THE LETTER OF CREDIT HAS NOT EXPIRED. IN WITNESS WHEREOF, THE UNDERSIGNED HAS EXECUTED THIS CERTIFICATE ON BEHALF OF THE CITY OF FORT COLLINS THIS DAY OF THE CITY OF FORT COLLINS, COLORADO A MUNICIPAL CORPORATION BY: TII *** CONTINUED ON NEXT PAGE *** vG 1: L15 MUL i 5- J 1-70171I NORWEST BANKS V J'j OUR REF. NO. S407591 EXHIBIT 2 REQUEST FOR AMENDMENT TO LETTER OF CREDIT NUMBER S407591 THE CITY OF FORT COLLINS CERTIFIES THAT THE PERSON SIGNING BELOW IS AUTHORIZED TO EXECUTE THIS REQUEST FOR AMENDMENT TO LETTER OF CREDIT ON BEHALF OF THE CITY OF FORT COLLINS AND FURTHER CERTIFIES WITH RESPEC" TO THE PROVISIONS CONTAINED IN THE DEVELOPMENT PERMIT DA"ED AND/OR THE DEVELOPMEN" AGREEMENT DATED BETWEEN THE CITY OF FORT COLLINS, COLORADO (BENEFICIARY) AND BARTRAN & COMPANY, INC. (THE DEVELOPER), THE FOLLOWING: (CHECK APPLICABLE SPACES) THE LETTER OF CREDIT IS TO BE REDUCED TO USD THE EXPIRATION DATE OF THIS LETTER OF CREDIT IS REVISED TO BE THE 60 DAY AUTOMATIC ONE YEAR RENEWAL PROVISION CONTAINED IN THE LETTER OF CREDIT IS NO LONGER IN EFFECT. IN WITNESS WHEREOF, THE UNDERSIGNED HAS ON BEHALF OF THE CITY OF FORT COLLINS, DAY OF CITY OF FORT COLLINS COLORADO A COLORADO MUNICIPAL CORPORATION m AND TITLE EXECUTED THIS CERTIFICATE COLORADO THIS NC 4,'4S MUL 15-91-i0474J EXHIBIT "A" DEVELOPMENT PROJECT CONTACT PERSONS Project Name: English Ranch South P.U.D. 3`d Filing Project A.K.A.: N/A City Staff Contact Persons: Development Engineer: Marc Virata 281 N. College Avenue, Fort Collins, CO 80524 (970)221-6605 x7188 mvirata@ci.fort-collins.co.us Construction Inspector: Dave Burke 281 N. College Avenue, Fort Collins, CO 80524 (970)221-6605 x7132 Cell (970) Current Planner: Steve Olt 281 N. College Avenue, Fort Collins, CO 80524 (970) 221-6750 x6341 Water Utilities Engineer: Roger Buffington 700 Wood Street, Fort Collins, CO 80521 (970) 221-6854 Erosion Control Inspector: Bob Zackley 700 Wood Street, Fort Collins, CO 80521 (970)224-6063 Natural Resources: Kim Kreimeyer 281 N. College Avenue, Fort Collins, CO 80524 (970)221-6641 Traffic Operations: Eric Bracke 625 Ninth Street, Fort Collins, CO 80524 (970)224-6062 Street Closures: Syl Mireles 625 Ninth Street, Fort Collins, CO 80524 (970)221-6815 Transportation Planning: Kathleen Reavis 210 E. Olive, Fort Collins, CO 80524 (970)224-6140 Forestry: Tim Buchanan 281 N. College Avenue, Fort Collins, CO 80524 (970)221-6641 Light and Power: Developer's Contact Persons: Project Manager: Developer/Owner: Doug Martine 700 Wood Street, Fort Collins, CO 80521 (970)224-6152 William D. Bartran P.O. Box 277, Timnath, CO 80547 (office) 970-229-1629 (cellular) 970-222-1588 (fax) 970-292-0177 William D. Bartran English Ranch South LLC P.O. Box 277, Timnath, CO 80547 Architect/Planner: Cathy Mathis VF Ripley Associates, Inc. 1113 Stoney Hill Drive, Fort Collins, CO 80525 (office) 224-5828 Project Engineer: Phil Robinson Stewart & Associates 103 S. Meldrum, Fort Collins, CO 80521 (office) 482-9331 General Contractor: same as Developer/Owner 4. The applicant understands that additional permits may be required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall !be required prior to the time of issuance of the first building permit . 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City ; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans and the "as -constructed" plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty four (24) hours prior to any planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to DCP PRECONSTRUCTION MEETING ATTENDANCE SHEET Contact name Company Name Address Phone Number lv,4Rc vledra �' i ry c�/Gi-vc: c-2 ivG 2z�-GGBc�- i rt4 .on Services Engineering Department City of Fort Collins March 22, 2000 Sue Wagner Norwest Bank 401 S College Avenue Fort Collins, CO 80524 Dear Sue: This letter is in reference to the issued irrevocable standby letter of credit number S407517 (in the amount of $146,753.78.) Please consider this as a request to cancel said letter of credit. It is the City's understanding that a new letter of credit will instead be drafted and established for the English Ranch South 3`d Filing P.U.D. Please inform me of any concerns or questions you might have. Sincerely, MarcP. Virata Development Review Engineer 281 North College Aeelue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 City of Fort Collins, Colorado DEVELOPMENT CONSTRUCTION PERMIT Permit Number: 0 C>" O6 Issuance Date: Project Name: English Ranch South P.U.D. Third Filing Project AKA.: Project Location: _ southwest corner of Edmonds Road and Paddington Road Permittee: William D. Bartran City and developer contacts: See attached Exhibit `A "for names and phone numbers of all contact persons for this project. C=TTe FOR 3 COLLI - 1 MDRTH C=OUEGE C9707 221-6065 Fees: Permit Application Fee (paid at the time of application) $ 300.00 (paidi Construction Inspection Fee (paid prior to issuance of this permit) $ 7,831.60 Total $ 9,131.60 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 146,753.78 Form of security deposited with the City: L BTTER CAP Zf'2Eb/T PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance: of the constructed public improvements. (All references above to the terms "Project Engincer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.) All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. 3. Construction time restrictions: E_;: rT n construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, 1 hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Manager's Signature�Dater Approval for issuance: 1 City Engineer Approval: /�1'_-Date- (Permit 1 (Permit Issuance Date) construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: n/a Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners ofthe property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, 1 hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Manager's Approval for issuance: 7 f ° 417 C0 City Engineer Approval: Date: / (Permit Issuance Date) DEVELOPMENT CONSTRUCTION PERMIT APPLICATION (2/16/99) For City use only: Application Number: _ A053-99 Application Date: Permit application fee: S 300.00 INSTRUCTIONS: 1. Complete this form (some questions may not apply to you) and attach all necessary documents and submit to the Development Engineering Section of the City. 2. Ifyou have any questions contact the Development Engineer Marc Virata at 221-6750. 3. Submit the Application and pay the Application Fee at the fee at the Engineering counter at 281 No. College Avenue. PROJECT INFORMATION: Project Name (as approved by the City): Enn2lish Ranch South P.U.D. Third Filing Project A.K.A. (Marketing name if different from Project Name): Project Location: _ southwest corner of Edmonds Road and Paddington Road Property Owner(At the time of this permit Individual Name: Company Name Address: Phone number(s): Office: 97r XA` '- Cellphone: -, ,)--i h'>> Fax number: , , 2 -i / 7 -7 Email: i_ ._ -7-1 Applicant/Project Manager (The primary contact person for all matters regarding this project, and the person responsible for all matters referencing "the Developer" in the Development Agreement for this project): , Individual Name: Company Name Address Phone number(s): Office: Cellphon a Fax number: Email: Project Engineer (A Colorado licensed professional engineer who is the civil engineer the person responsible for the design of this project, responsible for certification that improvements are 02-10-00 0207 CHECK {00.00 constructed in accordance with approved plans, responsible for making revisions to plans with City approval and for providing as -constructed plans): Individual Name: -+n_ - + .4 ."� t Company Name "jr- dz Address: Phone number(s): Office: Cellphone: Fax number: �;1r2 Email: Professional License Number: Developer (The party or parties referenced in the Development Agreement who are responsible for the Developer's obligations contained in the Agreement -add additional names below): Individual Name: CG; XA'tFrn - Company Name :7`/ ABC Address: n t 7 '7 rrrt" 5r-o , _Y 1 Phone number(s): Office: Cellphone: Fax number:: 7'7 Email: General Contractor (The contractor in overall charge of the public infrastructure construction): Individual Name: Company Name: l Address: _47 Phone number(s): Office: <7' Cellphone: Fax number: Email: If you have no General Contractor, list all other contractors below. Grading contractor: , Individual Name: i�l �'f ��"� " ' Company Name : Address: "5 Phone number(s): Office: 7 Cellphone: Fax number: Email: Utility contractor: Individual Name: Company,Name : Addressi � `,• Phone number(s): Office: /'/ Cellphone: _ Fax number: Email: Concrete contractor for flat work: Individual Name % '_ f — Company Name W Address: A Phone number(s): Office: Cellphone: Fax number: Email: Concrete contractor for structures: Individual Name: iz Company Name Address: Phone number(s): Office: Cellphone: Fax number: Email: Paving contractor: Individual Name: Company Name Address:�— Phone munber(s): Office: % /� ''/t i'✓_ :�_ Cellphone: Fax number: Email: Landscape contractor: Individual Name: < r. Company Name: fir ! Address: Phone number(s): `l n Office: Cellphone: Fax number:l Email: Other contractors and parties involved in the project: SUBMIT THE FOLLOWING ITEMS (Required for all projects): • 81/2"xl l" copy of the Site Plan • Proposed Project Schedule Project quantities and cost estimate for all of the public improvements to be constructed. In addition, include all private improvements that are required to be inspected by the City Construction Inspectors. This information must be submitted in the format shown on the attached form titled "Project Quantities and Cost Estimate Sheet." ADDITIONAL SUBMITTALS (Required if checked): ❑ Traffic control plan(s) for the project ❑ Proposed haul routes shown on a City map ❑ Shop drawings ❑ Other CONSTRUCTION COORDINATION MEETING: A construction coordination meeting to discuss plans and special requirements for your project, is required for all development projects. The people required to attend the meeting are the Project Manager, Project Engineer, Developer, Architect/Land Planner and General Contractor (if no General Contractor, representatives for each of the contractors expected to work on this project) People to Attend: List the peoples names and titles for those who will attend the pre - construction meeting: Name Title AF7 X-fMl ' /,( Name Title ESTIMATED COST OF INFRASTRUCTURE IMPROVEMENTS: Provide the estimated value of all public infrastructure improvements that will be constructed and accepted by the City to own and maintain. In addition provide the value of all private infrastructure improvements that the City will inspect and require certification for. The estimate shall be in the same format as the attached sheet titled "Project Quantities and Cost Estimate Sheet." Public infrastructure, estimated cost: S Private infrastructure, estimated cost: I certify that the information on this permit application along with the required additional submittals are true and correct to the best of my knowledge, and that in filing this application I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. ram