Loading...
HomeMy WebLinkAboutENGLISH RANCH PUD SIXTH - Filed CS-COMMENT SHEETS - 2003-07-31PROJECT City of Fot-t Collins COMMENT SHEET Cur rentPIanning DATE: 21 March 1995 DEPARTMENT; r PROJECT.: 75-86R ENGLIGH RANCH PUD, 6th Filing - P/F PLANNER: Bob Blanchard I All comments ,"must be received by: Friday, 31 Mar 1995 ❑ No Problems ❑ Problems or Concerns (see below) Site Plan • Due to lack,, of curve and street data this plan must be used with the Plat - it can not stand alone. • This is in Range 68 not 69. Plat • This is in Range 68 not 69. • Indicate POB. • English Ranch Road?? Sheet 5, County Rd 9 • Provide elevations every 100 feet. L�-c,�; �; LZ�,tT j,�jk;, ��C Date: ^I7���J Signature., G(� 'i CHECK IF YOU WISH TO RECEIVE ❑ PLAT COPIES OF REVISIONS: ❑ SITE ❑ LANDSCAPE ❑ UTILITY COMMUNITY PLANNING and I ENVIRONMENTAL SERVICES... 281 NORTH COLLEGE, P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580 (303)221-6750 CURRENT PLANNING DEPARTMENT 9 Street Plans and Profiles • Provide Curve Data Tables. • Show PTHC on Cul de Sac. • Sheet 7 - (Note 3 is not correct - not all flow line radii are 20 feet. • Sheet 7 - Add stationing on inside PC and PT. Details • Revise details or add additional information as indicated. i 1Jr� i "fig iF �lC .� �%i J1 it ti i u may951engran6.fin Comr nits Planning and Environment Services Current Planning Citv of Fort Collins April 7, 1995 Martin Breth, Jr, Bartran & Company PO Box 277 Timnath, CO 80547 Dear Marty: City staff has reviewed the English Ranch PUD, 6th Filing and offer the following comments: 1. Review of these plans should not be construed as a commitment that telephone facilities sufficient to serve this project are presently available. US West will provide telephone service in accordance with the rates and tariffs on file with the Colorado Public Utilities Commission. 2. The developer is responsible for provision of all trench, street crossings and ditch crossings for telephone facilities within the project. The developer will need to pay up front construction costs for facilities within the development. 3. Any relocation of existing telephone facilities required by these plans will be paid for by the developer. 4. Lots that back up to County Road 9 must have access to the sidewalk for snow removal. If they do not, the entity responsible for snow removal must be identified. 5. An additional fire hydrant capable of 1,000 GPM with 20 psi residual pressure must be located at the intersection of County Road 9 and Eastgate Lane. 6. Section 504 of the 1991 edition of the Uniform Building Code as adopted by the City of Fort Collins requires that exterior walls of one- and two- family dwellings located closer than three feet from a property line be of one -hour fire -resistive construction. No openings are allowed in such 281 North College Avenue • P.O. Box 580 Fort Collins, CO 80522-0580 • (303) 221-6750 FAX (303) 221-6378 T'DD (303) 224-6002 exterior walls. A parapet extending 30 inches above the roof surface is required unless the structure complies with the exceptions to Section 1710. Projections, such as cornices, eave overhangs or exterior balconies shall not extend over the property line and must comply with UBC Sections 1711 and 504. 7. There is a potential conflict between the 24" water main along County Road 9 which is in the area of the trees shown near the intersection of County Road 9 and Eastgate Lane. Please coordinate with Roger Buffington of the City's Water and Wastewater Department at 221-6854 8. Please provide separation between all water and sanitary mains, services, meter pits, fire hydrants, etc. of ten feet for trees and four feet for shrubs. 9. Please show sidewalk connections between cul-de-sac and arterial street sidewalks on the site plan. 10. English Ranch Road should be changed to County Road 9. In order to change the name of this road, an existing ordinance would need to be repealed and new names added to the acceptable list. f 11. The south loop of Carrington Circle should be named Stockbury Driite. 12. A five foot drainage easement should be shown between lots 1-2, 5-6, 11- 12 and 13-14. 13. Please include "6th Filing" in the name of the plat: A Plat of The English Ranch PUD, 6th Filing." 14. The legal description indicates this is located in Range 69. Please change to Range 68. 15. The legal description indicates S89034'14"E, the map says S89034'12"E. Please make the appropriate correction. 16. The plat should show the Point Of Beginning. 17. Please see the attached comments from the Engineering Department. Should you have any questions regarding these comments, please contact me. Please note the following dates to stay on schedule for the May 22, 1995 Planning and Zoning Board hearing: Plan revisions are due on May 3, 1995. PMT's, colored renderings and 10 prints are due on May 15, 1995. Sincerely, Robert E. Blanchard, AICP Current Planning Director cc: Kerrie Ashbeck, Civil Engineer