Loading...
HomeMy WebLinkAboutENGLISH RANCH SECOND - Filed GC-GENERAL CORRESPONDENCE - 2003-07-31Commur ' ., Planning and Environmental ' vices Engineering Department February 9, 1993 Mr. Bill Bartran Bartran and Company, Inc. P.O. Box 277 Timnath CO 80547 Re: The English Ranch Second Filing Dear Bill: In reviewing the soils report for this development, we find that the report states that if basements are to be constructed on this site where the ground water depth is less than 8 feet deep that a subdrain should be installed. Since your utility plans do not show any design for a subdrain system in public rights of way, no system can be installed. If you find that you need a subdrain system, it will have to be designed and your utility plans revised to include it. The City has interim design standards that must be used for any subdrain system. Let me know if your understanding is different. Sincerely, 4 Mike Herzig " Development Engineering Manager xc: Dave Stringer 'ail Furth Lulle:;c :Avemic • 11.l). 13u\ So • Fort cullins, CO `+(15_''-0;";0 • G?03) 221 w)O;