Loading...
HomeMy WebLinkAboutELLIOTT MILLER FOOTHILLS WEST SECOND - Filed OA-OTHER AGREEMENTS - 2003-07-31MORANDU 4 OF AGREEMIT THIS AGREDU NT, made and entered into this 17 day - of Aq ril A. D. 19 69 , by and bewtween THE CITY OF FORT COLLINS, a municipal_ corporation, hereinafter designated as first party, and glliott, Miller Construction Oc. Hereinafter designated as second party, WITNESSETH: WHEREAS, second party has heretofore submitted a subdivision fill; ott Miller Foot hills West plat of the subdivision to be known as Sabdivision Second Filing For approval by the Municipal Planning and Zoning Doard and the City Council of the City of Fort Collins, and WHEREAS, said subdivision plat is acceptable to first party and first partyts Planning and Zoning Board, subject to construction of utilities in the area to be subdivided, NGV, THEREFORE, in consideration of the premises and the terms of this agreement, it is mutually agreed as follows: 1. ]Hirst party agrees that said subdivision plat shall be, and the same is hereby approved. 2..._.:In consideration of the approval of said plat by first --"^ party, and first partyts Planning and Zoning Board, second party agrees as follows: (A) To submit to first party the folloz,ri.ng detailed improvement plans, acceptable to the first party: (1) A plan of the proposed water distribution system including the connecting pipelines to the points of connection to the first partyts existing water distribution system and showing all valves and fire hydrants. (2) Plans and profiles of the proposed sanitary sewer system including all manholes and connections to the first partyts existing sanitary sewer system... (3) A plan of the proposed electrical distribution system including connecting lines to the first partyts existing electrical distribution system and including all street lights. (4) Plans and profiles of all street improvements. (5) Plans and profiles of the proposed street drainage system shoring the connections to the first partyts storm sewer system and including all storm sewer inlets and manholes. (6) Items A (1) to A (5) inclusive are to be financed by the party of the second part, excepting only Item (3) electrical distribution system. All material required for street lights are to be paid for by. the party of the second part to the Light & Power Department of the City. In the event the City of Fort Collins shall require larger water mains, sanitary sewer mains or storm sewer mains to be constructed within the subdivision than would be required by standard engineering practices to serve the subdivision, in order to properly extend these services to other areas, the City of Fort Collins will pay a portion of the cost of such enlarged facility based on proration of the cost of the facility actually constructed and the estimated cost of such facility as shown on the subdividerts approved plan. Such proration of costs between the City of Fort Coll -ins and the subdivider shall be determined in advance of construction by the City Engineer and in the event of any dispute this matter shall be submitted to the City Council for final determination. IN 'VITNESS I-TH REOF, first party has caused these presents to be signed by its Mayor and its corporate seal to be hereto alffi�jd fittest to by its City Clerk, pursuant to motion of the Council of the City of --- — "Fort Collins dated the 17 _ day of April A. D., 19 59 , and second party has hereto set his hand and seal the day and year first; hereinabove written. ATTEST: City Clergy; THE CITY OF FORT COLLINS. A Municipal Corporation Mayor First Party i Second Party