Loading...
HomeMy WebLinkAboutELLIOTT MILLER - Filed OA-OTHER AGREEMENTS - 2003-07-31This A1T, made and entered into this 22nd day of February A. D. 19 63 by and bewtveen THE CITr CF FCRT COLLINS, a municipal corporation, hereinafter designated as first party, and Elliott Miller Construction Co. Inc. Hereinafter designated as second party, WITNESSETHs WMAS, second party has heretofore submitted a subdivision plat of the subdivision to be known as Elliott Miller Subdivision First Filing For approval by the Municipal Planning and Zoning Board and the City Council of the City of Fort Collins. and VAUMM., said subdivision plat is acceptable to first party and first party's Planning and Zoning Board, subject to construction of utilities in the area to be subdivided, NOW, THERFWaM, in consideration of the premises and the 4 of this agreement,, it is mutually agreed as follows: 1. First party agrees that said subdivision plat shall be, and the same is hereby approved. 2. Tz consideration of the approval of said plat by first party, and first party's Planning and Zoning Board, second party agrees as followers (A) To submit to first party the following detailed improvement plans, acceptable to the first party: (1) A plan of the proposed water distribution system including the connecting pipelines to the points of connection to the first party's existing water distribution system and showing all valves mad fire hydrants. (2) Plans and profiles of the proposed sanitary sever system including all manholes and connections to the first party's eod.sting sanitary sever system. _ (3) A plan of the proposed electrical distribution system including connecting lines to the first partyls existing electrical distribution system and including all street lights. (4) Plans and profiles of all street improvements. (5) Plans and profiles of the proposed street drainage system showing the connections to the first party's storm sever system and including all storm sewer inlets and manholes. (6) Items A (1) to A (5) inclusive are to be financed by the party of the second part.. excepting only Item (3) electrical distribution system. All material required for street lights are to be paid for by the party of the second part to the Light & Power Department of the City. In the event the City of Fort Collins shall require Larger water mains., sanitary sewer mains or storm sewer mains to be constructed within the subdivision than would be required by standard engineering practices to serve the subdivision, in order to properly extend these services to other areas, the City of Fort Collins will pay a portion of the cost of such enlarged facility based on proration of the cost of the facility actua1ay constructed and the estimated cost of such facility as rh-cwn on the subdivider's approved plan. Such proration of costs between the City of Fort Collins and the subdivider shall be detern ned in ad" ^ce of construction by the City Engineer and in the event of arW dispute this mctter shall be submitted to the City Council for final determii.raticn, IN WITNESS WHEREOF., first party has caused these prc3ents to be signed by its Mayor and its corporate seal to be heret � =r�— test to by its City Clerk., pursuant to motion of the Council of the City of Fort Collins dated the 7th day of February A. D.9 19 63 , and second party has hereto set his hand and seal t-ie day and year first hereinabove written. ATTEST: Ulty Ulerk L-1— I z3_ 6 3 ( Subject to annexation proceedings) THE CITY OF FORT COLLINS. A Municipal Corporation MayorBy First Part¢ a�o� e2vi�L 4(,SEAL) Second y