Loading...
HomeMy WebLinkAboutDOERR MINOR SUB - Filed CS-COMMENT SHEETS - 2003-07-31PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: January 21, 1997 DEPT: Engineering PROJECT: #6-97 Doerr P.U.D. & Subdivision Preliminary & Final PLANNER: d kePv AC vAA 0. t- All comments must be received by: Monday, February 10, 1997 Plat: • Dedicate 91foot utility easements along the street rights -of -way to meet the current requirements for utility easement width. Site/Landscape Plan: • The driveway to the new house must be a minimum of 20 feet from the property corner (see redline plans). • Show the drriveway access to the existing house • Add a note to state that the property owner will repair and/or replace any existing damaged curb, gutter, and sidewalk, and/or any damage caused by the construction on this site, prior to the issuance of a certificate of occupancy. Utility Plan: • Add the City's standard General Notes • Staff will verify whether or not the streets adjacent to this project are scheduled for the City's Street Rehabilitation/Overlay program. If they are, the City will want to coordinate the work so that the street cuts for the utility services are done prior to any overlay work. Date: --7- /-� /cl -q Signature 9,> CHECK IF YOU WISH TO RECEIVE -0 PLAT COPIES OF REVISIONS 0 SITE El LANDSCAPE UTILITY Commu_ ,y Planning and Environmental rvices K. Ashb,,ck. Current Planningrl ricer ir�� City of Fort Collins February 12, 1997 Thomas J. and Kari Rae Doerr 6895 West County Road 38E Fort Collins, Colorado 80526 RE: Doerr PUD and Subdivision Preliminary and Final Dear Mr. and Mrs. Doerr: Staff has reviewed your plans for the Doerr PUD and Subdivision Preliminary and Final that were submitted on January 16, 1997, and would like to offer the following comments. 1. The Natural Resources Department offers the following comments: a. Please provide a landscaping plan that shows existing and proposed landscaping. 2. The Zoning Department offers the following comments: a. Scale needs to be at 1 "=50' or 2"=100' b. Concerning the existing garage from the lot to the west --"What was its prior side set back to property line. I don't believe we can allow an illlegal non -conforming setback to occur via this PUD. Garage side setback is less than 5'. 1 think they will have to assure garage is 5' from side property line by giving more of the "jog" to lot 20 for use to approve this building envelope (may have to more east 2'-3.)" C. Site plan also needs to show driveway on new house --to assure off street parking for a two car wide drive. This is required due to the compact lot as we do not want to affect the present on -street parking of the neighborhood. According to the building code, only one off- street parking is required. d. Show building dimensions of existing structure and the distance to property lines. e. The shed will need to be at least 3' from the rear property line (if of combustible materials.) 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 FAX (970) 221-6378 • TDD (970) 224-6002 Doerr PUD, Preliminary and Final Page 2 February 12, 1997 3. TCI of Fort Collins states "TCI of Fort Collins would like to have a rear utility easement on Lot 19A." 4. The Light and Power Department notes that electric development charges will be due on this site. 5. The Park Planning Department notes that parks fees are due on the new unit at the time of building permit. 6. Comments from Stormwater Utility are attached. 7. Comments from Engineering are attached. 8. The Mapping Department states "Describe all outerboundary monuments." 9. The Water and Wastewater comments have been forwarded to Stewart and Associates with comments. a. Prefer you take services off Myrtle rather than Tyler. b. Plant Investment Fees and Water Rights due at time of building permit. 9. The Current Planning Department offers the following comments: a. Label the existing zoning on the site plan. b. The number and percentage of solar -oriented lots must be indicated on the site plat. (A copy of the ordinance is included.) C. With revisions, you will need to submit a landscape plan that shows existing and new landscaping. d. What are the number of bedrooms per each dwelling unit? e. Please show the public street right-of-way . f. What is the maximum building height? g. Area shown on the site plan need to be extended beyond the property lines of the proposal to include a survey of the area and sues within one hundred fifty (150') feet of the proposal, exclusive of public right- of-way, at the same scale as the proposal and including the following: -Land uses and location of principal structures. Doerr PUD, Preliminary and Final Page 3 February 12, 1997 -Densities of residential uses. -Existing trees and major features of landscape. -Topographic contours at two (2') intervals. -Traffic circulation system. h. On the vicinity map (of the area surrounding the site within a distance of at least one (1) mile), show the zoning districts including, and surrounding the site; location of existing municipal boundaries; traffic circulation system; and major public facilities. I. The site plan should include the existing and proposed utility systems including sanitary sewers, electric, gas and telephone lines, fire hydrants, and trash collection areas. j. On the site plan, please include the date of preparation. k. You will need to submit a statement of planning objectives, including: -;statement of appropriate City land use policies achieved by the proposed plan. -13tatement of proposed ownership of public and private open space areas; applicant's intentions with regard to future ownership of all or portions of the planned unit development. -Description of rationale behind the assumptions and choices bade by the applicant. -Detailed description of how conflicts between land uses are being avoided or mitigated. -Completed Energy Conservation Worksheet using Energy Conservation Method One (attached). -You will need to submit an "All Development Criteria" sheet and a calculation of residential density. (Both are included.) This complete; the review comments at this time. Additional comments may be forthcoming as the various departments and reviewing agencies continue to review this request. Please be aware of the following dates and deadlines to assure your ability to stay on schedule for the March 24, 1997, Planning and Zoning Board hearing: Doerr PUD, Preliminary and Final Page 4 February 12, 1997 Plan revisions are due by 12:00 noon on March 5, 1997. Please contact me for the number of folded revisions required for each document. No revisions will be reviewed after the above deadline. If revisions are not received by this date, the item will either go to the Planning and Zoning Board with a staff recommendation based on the originally submitted documents or the applicant will have the option to continue the item to the next month's P&Z agenda. PMT's, renderings, and eight (8) folded copies of final revisions are due by 12:00 noon on March 17, 1997. Please provide a written response to each of the above stated comments with the submittal of plan revisions. Please contact me at 221-6641 if you have any questions or concerns that are related to the comments. If you would like to schedule a meeting, please call me as soon as possible. Best Regards, 0 Leanne A. Lawrie Project Planner xc: Kerrie Ashbeck Stormwater Utility file/Project Planner City of Fort Collins Current Planning DATE: PROJECT: PLANNER: ENGINEER: Plat: PROJECT COMMENT SHEET LCMIJI'll C DEPT: Engineering Ji;�3-pI\-)I �51D0 L,,A-.W ��A & ❑ No Problems I"! Problems or Concerns (see below or attached) • WOK to keep utility easement along Mulberry Street a consistent 6' wide width due to existing structure • Since this is a new subdivision the lots must be numbered as 1 and 2 Utility, Grading, and Drainage Plan: Show ramps at intersections if existing. If the ramps are not existing, they must be constructed now The existing old driveway is required to be concrete to the property line with redevelopment of this site Date: Signature. PLEASE SEND COPIES OF MARKED REVISIONS: ❑ PLAT ❑ SITE ❑ UTILITY ❑ LANDSCAPE PROJECT COMMENT SHEET City of Fort Collins Current Plannincr DATE: January 21, 1997 DEPT: Mapping PROJECT: #6-97 Doerr P.U.D. & Subdivision Preliminary & Final PLANNER: Ted Shepard All comments must be received by: Monday, February 10, 1997 1A Date: I Signature CHECK IF YOU WISH TO RECEIVE COPIES OF REVISIONS PLAT ❑ SITE ❑ LANDSCAPE ❑ UTILITY CAOic