Paul, an issue has come up on Creekside Estates (formerly Shoreline
P.U.D.) that you should be aware of. This property is located
adjacent to the Harmony Cove Reservoir and should not be confused
with Creekside at the Landings although the developer, Mr. Ken
Slyziuk, is developing both projects.
The approved P.U.D. calls for doing a meandering, naturalistic shoreline
treatment along the reservoir's edge behind lots 1 - 4. Since the
approval, the surrounding lake owners have formed an association and
purchased bottom of the lake and irrigation water from Larimer No. 2.
The developer has filled in the back of lots 1 - 4 with dirt to do the
shoreline treatment but got a little carried away and brougt in too
much dirt. The extra fill now extends beyond the designated landscape
and shoreline area. The association, represented by Moe Mekelberg and
Sam Anderson, are upset and want the extra fill removed.
The issue is that the original shoreline landscape plan that was approved
on the P.U.D. called for landscape material to be placed beyond the rear
platted property line of lots 1 - 4. The Planning Department did not
obtain the permission of the lake owner at the time of approval who we
think was Bill Albrecht. We now fear that the new Lake Association will
not only bring action to remove the fill that extends beyond the designated
shoreline area (which we agree with) but to also remove all the fill that
extends beyond the platted property line (which we do not agree with as
it will require retention walls and we lose the naturalistic features).
Sam Anderson has filed a Quiet Title on lots 1 - 4. Lucia Liley has been
retained by Ken Slyziuk to facilitate in hopes of preventing litigation.
I have been invited to a meeting to discuss the issues with all the
parties including Parson's and Associates, Slyziuk's engineer. I believe
that the City may have a legal interest at stake. Did we screw up by not
getting Albrecht's permission to fill a small portion of the lake for
landscaping? I know he knew about it because he attended the neighborhood
meetings. Is Albrecht liable because he did not disclose to the Lake
Association about the P.U.D. encroachment?
The meeting is scheduled for 4:30 P.M. at Sam Anderson's office in
the Clock Tower Building on South College. Please advise. Thanks.
End of Item 2.
Intray >
REQEIVED
� PARSONS &
/ram- ASSOCIATES
CONSULTING ENGINEERS
September 26, 1990
Glen Schlueter
Storm Drainage
City of Fort Collins
P. O. Box 580
Fort Collins, CO 80522
J AN 311992
RE: Certification of drainage scvale in Creekside Estates
Dear Glen:
The attached cross -sections were surveyed by us for the purpose of
certifying the adequacy of the relocated drainage swale on the south
boundary of Creekside Estates. The Section AA was take.: through the
easterly portion of Lot 10 and Section BB was taken through Lot 1.
As you can see in Section 3B, there is an encroachment into the
drainage easement for the construction of the house and garage on Lot 1.
Therefore, we propose steeper slopes: 2:1 rather than 3:1 as shown on
the original design. I have discussed the 2:1 slopes with Neil Sher -rod
of Empire Labs and we both feel that sodded 2:1 slopes will withstand
erosion during the 100-year flows. Given the soil type at the site, a
2:1 slope with proper compaction is stable. The grass will withstand
water velocities up to 6 feet per section, which is greater than
anticipated in this swale. We recommend that slopes steeper than 2
1/2:1 be sodded., and flatter slopes be seeded.
The capacity of the proposed swale through both of these sections
substantially exceeds the needed capacity for the 100-year flows. The
capacity of the existing swale is also more than adequate, but the
proposed regrading will stabilize the side slopes of the channel. Once
these proposed changes are made, I'll be able to certify the adequacy of
this channel.
Thank you for your help in releasing Lot 1 for a C.O., allowing
Fairfield Companies to close on that lot.
Sincerely,
Donald M. arsons, P.E.
Attachments
DMP/nc
432 Link Lane Plaza Ft. Collins, Colorado 80524 • [3031 221-2400
— — -- - - - - - - r=E S7- LUGOD /ZF'.UG'B
---------- - 9¢.7
g
s7 467s
I
s�
to -ice 13�
%/�6 ST.rl.UAQ,2D �ipOcrO.�
D�.v-S'rrY
-20-19p�
88zo-"��z y
Developn t Services
Engineering Department
August 14, 1991
Ken Slyziuk
Fairfield Homes
2618 South Deframe Circle
Denver, CO 80228
RE: Creekside at the Landings and Creekside Estates
Dear Mr. Slyziuk:
The intent of this letter is to inform you that the public improvements on the
City rights -of -way have been inspected and initially accepted by the City of Fort
Collins pending the normal contractors warranty period with exception of the
punch list items listed below.
Please be informed that this letter of acceptance does not relieve the developer
or the contractors, lot owners, or their contractors of their responsibilities
for the repair of any damage which may occur as a result of the building
construction.
PUNCH LIST ITEMS
1. 4217 Breakwater Court
Remove and replace 17 L.F. curb, gutter, and walk; 5' x 10' asphalt patch 6"
deep.
2. 4259 South Shore Court
Remove and replace 18' L.F. curb, gutter, and walk; remove and replace 4.5
L.F. curb, gutter, and walk; 5.5' x 13.5' asphalt patch 6" deep.
3. Raise fire hydrant south end of Southshore Court.
ESCROW ITEMS
1. 12' x 17' Cress Pan Section
8" Thick @ $4.00 per Square Foot = $ 816.00
Asphalt 68 Square Feet @ $5.00 per Square Foot = $ 340.00
Plus 50% _ $1,734.00
Items for vacant lots on South Shore Court:
Lot #7: An estimated 140 L.F. of curb, gutter, and walk is damaged on this
frontage as well as settled asphalt area will be repaired prior to release
of Certificate of Occupancy.
281 \orth College Avenue • P.O. Box �80 • Fort Collins, CO 80�22-0=;80 • (303) 221-�t,0;
Creekside at the Landings and Creekside Estates
August 14, 1991
Page Two
Lot #10: An estimated 35 L.F. of curb, gutter, and walk as well as settled
asphalt area is damaged on the frontage of this lot and will be repaired
prior to release of Certificate of Occupancy.
This letter does not relieve the Developer of his obligation to complete the
development as approved by the City. Lots 13, 18, and 19 will not be released
for building permits until such time as all of the required improvements are
complete.
If you should have any questions please feel free to call me at 221-6605.
Sincerely,
Lance Newlin
Engineering Inspector
LN/ltg
cc: Mike Herzig, Development Engineering Manager
Creekside at The Landings File