HomeMy WebLinkAboutCOVENTRY SECOND - Filed CS-COMMENT SHEETS - 2003-07-31Northern Engineering Services, Inc.
October 4, 199-5
Mr. Ted Shepard
Community Planning and Environmental Services
City of Fort Collins
PO BOX 580
281 North College Avenue
Fort Collins, Colorado 80522-0580
RE: Coventry 2nd Filing
Response to City Comments
Dear Ted,
This letter is in response to the comments regarding issues received
regarding the Coventry Subdivision, Second Filing. This letter will
address those issues which are applicable to Northern Engineering
Services, Inc (NES). All other issues will be addressed by Jim Sell
Design, Ripley and Associates, or Landstar Surveying.
Item 1 A-E, & 14 - These comments have been forwarded to Landstar
Surveying, and they will incorporate these comments into the final plat.
The Final plat will be resubmitted to your office as a separate submittal
from Landstar.
Item 2, 3, 4, & 17 - A Utility coordination meeting has been scheduled for
October 12th at 1:30 at 281 North College. All comments from this meeting
will also be incorporated into the Final Utility plans and the Final plat.
Item 8 - Northern Engineering has received comments from Stormwater,
and we have revised our Final Utility plans accordingly.
Item 9 - Front Range Community College declined the request to grant
the developer an easement. Therefore, we have revised our plans to show
no grading or development to occur on their site.
Item 10 - There is no irrigation ditch in the proximity of this project. Mail
Creek is a regional drainage improvement. Therefore, no ditch approvals
will be sought.
Item 11 - We have reviewed the cross sections of Harmony Road adjacent
to Hinsdale Drive. There are a couple of locations where there is less
than 2% cross slope. This was done to provide clearance for the regional
drainage improvements under Hinsdale Drive. We will coordinate with
Engineering to work towards a acceptable solution.
Item 12 - Easements will be provided on the affected lots.
Other individual concerns from the City provided under separate cover
have been incorporated into our Final Utility plans, and these comments
have also been returned to your office. Each pertinent reviewing agency
can review their comments and our proposed revisions.
Please call if you have any questions regarding this letter, or any
questions pertinent to the Coventry Second Filing submittal.
Sincerely,
Roger A. Curtiss P.E.
cc: Jim McCory, Colorado Land Source
Tom Kehler, Jim Sell Design
Kerrie Ashbeck, City of Fort Collins
Glen Schlueter, City of Fort Collins
RT
)Co:tk