Loading...
HomeMy WebLinkAboutCOOK COURT MINOR SUB - Filed CS-COMMENT SHEETS - 2003-07-31rvices September 24, 1.993 Gino Campana Campana Construction 5100 Abbey Road Fort Collins, CO 80526 Dear Gino, Staff has reviewed yqur submittal for Cook Court Subdivision and offers the following comments: 1. US West will provide telephone service in accordance with the rates and tariffs on file with the Colorado Public Utilities Commission. The developer is responsible for provision of all trench, street crossings, and ditch crossings for telephone facilities within the project, and the developer pays up front construction costs for facilities within the development. 2. Any relocation of existing telephone facilities required by these plans will be paid for by the developer. 3. Review of these plans should not be construed as a commitment that telephone facilities sufficient to serve this project are presently available. 4. Utility easements are required and should be shown as indicated on the redline plans. 5. No trees may be planted within 4' of any natural gas line. 6. Please refer to the preliminary utility plans for comments from the Water and Wastewater Utility, forwarded by Engineering, on Monday September 27, 1993. 7. Change the Planning certification from Planning and Zoning Board to Planning Director and the City Clerk Certification to City Clerk. 8. Engineering is reviewing the soils report. Please contact Kerrie Ashbeck to find out what the comments are. Engineering comments will be available on Monday, September 27, 1993. 9. Poudre Fire Authority has no objection to two single family dwellings on these lots provided the new dwellings are within 150' of Homer Drive. In this case the access road and bridge would be considered to be a private single family driveway. The Bridge must be posted with the known load limit. 281 North COIICI� 0 :lernuc • P.O. 13uy Fort Collins, CO 80522-0 80 • (303) 221-07;0 10. New dwelling units are subject to Parkland fees. The fees are currently, $779.00 per unit and are collected at the time of building permit issuance. 11. Any landscaping proposed in the public right-of-way is to be maintained by the property owners. 12. Any modifications necessary to the existing electrical system will be at the owner/developer's expense. The entire driveway entrance needs to be dedicated as a utility easement. 13. If the driveway access was a dedicated public right-of-way, you will have to vacate it by separate action in front of City Council. Kerrie Ashbeck can assist you with the vacation procedure if necessary. 14. Please contact Kerrie Ashbeck to get the official dedication language for subdivision plats (see attached). 15. Stormwater comments have not been returned to me at this time. They will be forwarded to you under separate cover. If you have questions, please contact Glen Schleuter at the Stormwater Utility, 221-6589. This concludes staff comments at this time. If you feel that these changes can be made by next week, I could schedule a public hearing for October 7th (or October 12th) at 1:30 pm in the Planning Department conference room. I need to have at least 10 days prior notice so that letters can be sent to the neighborhood and a notice can be placed in the newspaper. Please bring the signed, completed mylars and utility plans to the hearing. If you have any questions about these comments or would like to schedule a time to meet to discuss them, please contact me at 221- 6750. Sincerely, Kirsten Whetstone Project Planner cc: Kerrie Ashbeck, City Engineering City Stormwater Utility File