Loading...
HomeMy WebLinkAboutCOLLINDALE GOLF COURSE CLUBHOUSE - Filed DCP-DEV. CONSTRUCTION PERMIT - 2003-07-31City of Fort Collins Transportation Services Engineering Department DEVELOPMENT CONSTRUCTION PERMIT Permit Number: ( z._ C, % --Issuance Date: Project Name: _ Collindale Golf Course Clubhouse Project Location: 1441 E. Horsetooth Road Permittee: Steve White, City of Fort Collins Operations Services City and developer contacts: See attached Exhibit "A" for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee (paid at the time of application) $ 150.00 Construction Inspection Fee (paid prior to issuance of this permit) $ 676.00 Total $ 826.00 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ N/A (Ci project) Form of security deposited with the City: ___N/A -__ PERFORMANCE REQUIREMENTS OF THIS PERMIT: l The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. 'The Permittee shall ha:,,c an Engineer prepare revised design drawings and :,ecure City approval for all revisions to the 1 Itility Plans and related documents. The Permittee shall have an Engineer represent, as regnired by the City in the Development Agreemert, than_ the improvements are constructed in confor►nancc with the approved Utility Plans and the standards and specifications of the City. The Pcr,­n1ttce shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the ConStructed public improvements. (All references above to the terms "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. 2h 1 North College Av en Lie • PO. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 • FAX (970) 221-6378 www.fcgov.com DEVELOPMENT CONSTRUCTION PERMIT APPLICATION (2/16/99) For City use only: Application Number: Application Date: 2118102 JPermit application fee: $ 300.00 INSTRUCTIONS: I . Complete this form (some questions may not apply to you) and attach all necessary documents and submit to the Development Engineering Section of the City. 2. If you have any questions contact the Development Engineer at 221-6750. 3. Submit the Application and pay the Application Fee at the fee at the Engineering counter at 281 No. College Avenue. PROJECT INFORMATION: Project Name (as approved by the City): Collindale Golf Course Clubhouse Project A.K.A. (Marketing name if different from Project Name): Project Location: 1441 E Horsetooth Road Property Owner(At the time of this permit issuance): Individual Name: Alan Krcmarik Company Name : Fort Collins Capital Tease Corn Address: PO Box 580, Fort Collins CO 80552 Phone number(s): Office: 221-6772 Cellphone: Fax number: 221-6782 Email: Applicant/Project Manager (The primary contact person for all matters regarding this project, and the person responsible for all matters referencing "the Developer" in the Development Agreement for this project): Individual Name: Steve White Company Name: CiJXof Fort Collins Address: PO Box 580, Fort Collins CO 80522 Phone number(s): Office: 221-6273 Cellphone: 221-6273 Fax number: 221-6534 Email: swhiti"@fcgov.com Permittee (Person who is to sign the Development Construction Permit): Individual Name: Steve White Company Name: CitV of Fort Collins, Address: PO Box 580 Fort Collins CO 80522 Phone number(s): Office: 221-6273 Cellphone: 221-6273 Fax number: 221-6534 Email: swhite(�fcov.com Project Engineer (A Colorado licensed professional engineer who is the civil engineer, the person, responsible for the design of this project, responsible for certification that improvements are constructed in accordance with approved plans, responsible for making revisions to plans with City approval and for providing as -constructed plans): Individual Name: Terry Everett Company Name: c ° ^Tiro Address: 3500 JFK Parkway; Suite 310 Phone number(s): Office: 266-1900 Cellphone: Fax number: 266-0276 Email: Professional License Number: 14547 Architect/Planner (The person responsible for the site design of this project) Individual Name: Matt Rankin Company Name: Vanght�*FT Address: 401 West Mountain Ave,• Suite 200 Phone number(s): Office: 224-1191 Cellphone: Fax number: 2241662 _ Email: mrankin@vfavfr.com Developer (The party or parties referenced in the Development Agreement who are responsible for the Developer's obligations contained in the Agreement —add additional names below): Individual Name: Jerry P Brown Company Name: Citv of Fort Collins Address: PO Box 580 Fort Collins CO 80522 Phone number(s): Office: 221-6350 Cellphone: Fax number: 221-6586 Email: jpbroAvn@fcgov.com General Contractor (The contractor in overall charge of the public infrastructure construction): Individual Name: Jeff Jenson Company Name : Drahota Construction Co Address: 4700 Innovation Dr Bldg C Fort Collins CO 80525 Phone number(s): Office: 204-0100 Cellphone: Fax number: Email: If you have no General Contractor, list all other contractors below. Grading contractor: Individual Name: _ Company Name: — Address: _ Phone number(s): Office: Cellphhone: _ Fax number: Email: Utility contractor: Individual Name: Company Name: Address: Phone number(s): Office: Cellphone: _ Fax number: Email: Concrete contractor for flat work: Individual Name: Company Name: Address: _ Phone number(s): Office: Cellphone: Fax number: Email: Concrete contractor for structures: Individual Name: Company Name: Address: _ Phone number(s): Office: Cellphone: Fax number: Email: Paving contractor: Individual Name: _ Company Name Address: Phone number(s): Office: Cellphone: _ Fax number: Email: Landscape contractor: Individual Name: _ Company Name Address: _ Phone number(s): Office: Cellphone: _ Fax number: Email: Other contractors and parties involved in the project: SUBMIT THE FOLLOWING ITEMS (Required for all projects): • 81 /2"x 1 1 copy of the Site Plan • Proposed Project Schedule • Project quantities and cost estimate for all of the public improvements to be constructed. In addition, include all private improvements that are required to be inspected by the City Construction Inspectors. This information must be submitted in the format shown on the attached form titled "Project Quantities and Cost Estimate Sheet." ADDITIONAL SUBMITTALS (Required if checked): ❑ Traffic control plan(s) for the project ❑ Proposed haul routes shown on a City map ❑ Shop drawings ❑ Other CONSTRUCTION COORDINATION MEETING: A construction coordination meeting to discuss plans and special requirements for your project, is required for all development projects. The people required to attend the meeting are the Project Manager, Project Engineer, Developer, Architect/Land Planner and General Contractor (if no General Contractor, representatives for each of the contractors expected to work on this project) People to Attend: List the peoples names and titles for those who will attend the pre - construction meeting: Name Title ESTIMATED COST OF INFRASTRUCTURE IMPROVEMENTS: Provide the estimated value of all public infrastructure improvements that will be constructed and accepted by the City to own and maintain. In addition provide the value of all private infrastructure improvements that the City will inspect and require certification for. The estimate shall be in the same format as the attached sheet titled "Project Quantities and Cost Estimate Sheet." Public infrastructure, estimated cost: Private infrastructure, estimated cost: $ I certify that the information on this permit application along with the required additional submittals are true and correct to the best of my knowledge, and that in filing this application I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to e er upon the property for purposes of inspection and, if necessary, to enter upon such proper to rform work wired of the applicant if the applicant were to fail to perform the required work. Applicant Signature:__ ��' '� Date:vL- PP g - APR-17-2002 09:15 UAUGHTFRY=iUI= RIPLEYTS 970 224 1662 P.02i02 TOTAL P.02 3. Construction time restrictions M Development Construction Permit, Page 2/6 4. The applicant understands that additional permits may be required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. in addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29- 678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and the Aas-constructed@ plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in Development Construction Permit, Page 3/6 place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. 1 also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and condi 'ons s, stated in thi �e m pit. r' Applicant/Project Manager's Signature: � �� Date: Z-1& 62 Approval for issuance: City Engineer Approval: � tom/ Date: 41 q (Per it Issuance Date) Development Construction Permit, Page 4/6 EXHIBIT "A" DEVELOPMENT PROJECT CONTACT PERSONS Name, address and numbers Project Name: Project A.K.A.: City Staff Contact Persons: Development Engineer: Marc Virata 281 North College Avenue, Fort Collins, CO 80524 221-6605 Construction Inspector: Lance Newlin 281 North College Avenue, Fort Collins, CO 80524 221-6605 Current Planner: Steve Olt 281 North College Avenue, Fort Collins, CO 80524 221-6750 Water Utilities Engineer: Roger Buffington 700 Wood Street, Fort Collins, CO 80521 221-6854 Erosion Control Inspector: Bob Zackley 700 Wood Street, Fort Collins, CO 80521 224-6063 Natural Resources: Doug Moore 281 North College Avenue, Fort Collins, CO 80524 224-6143 Development Construction Permit, Page 5l6 Traffic Operations: Eric Bracke 625 Ninth Street, Fort Collins, CO 80524 224-6062 Street closures: Syl Mireles 625 Ninth Street, Fort Collins, CO 80524 221-6815 Transportation Planning: Kathleen Reavis 215 :North Mason Street, Fort Collins, CO 80524 221-6140 Forestry: Tim Buchanan 281 'N. College Avenue, Fort Collins, CO 80524 221-6361 Light and Power: Doug; Martine 700 Wood Street, Fort Collins, CO 80521 224-6152 Developer' Contact Persons: Project Manager: Steve White City of Fort Collins — Operations Services PO Box 580 Fort Collins, CO 80522 221-6273 221-6534 (fax) swhitekfcgov.com Developer: Jerry P Brown City of Fort Collins — Parks and Recreation PO Box 580 Fort Collins, CO 80522 221-6350 221-6585 (fax) Development Construction Permit, Page 6/6 jpbrown e,fcgov.com Owner(s): Alan Krcmarik Fort Collins Capital Lease Corp. PO I3ox 580, Fort Collins, CO 80522 221-6772 221-6782 (fax) Architect/Planner: Matt: Rankin Vaught -Frye 401 West Mountain Avenue, Suite 200 Fort Collins, CO 80521 224-1191 224-1662 (fax) mrankin@vfavfr.com Project Engineer: Terry Everett SA Miro 3500 JFK Parkway Suite 310 Fort Collins, CO 80525 266-1900 266-0276 (fax) General Contractor: Jeff Jenson Drahota Construction Co. 4700 Innovation Dr., Bldg. C, Fort Collins, CO 80525 204-0100 VV 1 Q c � , 1A, , , CC--, 16 �(9, V A V, J) 4-JCijv%4,f �z�-6z9z � III Z.-) - (� 2a4- oioo 5L7- 0?(7 PcG (,Old N����A�2� X(��-. Cn�c-e� 2f5 -78z3 Christie White Re: Fwd: Inspection Fees and DCP for Coll indale Golf "Course page 1 From: Kevin Rose To: Christie White Date: 04/23/2002 5:17:27 PM Subject: Re: Fwd: Inspection Fees and DCP for Collindale Golf Course all done, batch #212226 >>> Christie White 04/22/02 08:03AM >>> Good Morning Kevin, Per the attached memo, please do a JE from Operation Services charge No. $826.00 from 50839500.528220.3 To - $150.00 DCP Permit 360100.322102 $676.00 Construction Inspection 360100.341123 If you have any questions please give me a call X6606. Thanks. Christie Christie White Inspection Fees and DCP _ - _ - ------ for Collindale Golf Course Page e 1 From: Marc Virata To: Sieve White Date: 04/l9/2002 10:23:24 AM Subject: Inspection Fees and DCP for Collindale Golf Course Steve, The City Engineering Inspector calculated inspection fees pertaining to the project and came up with a total of S676.00. The breakdown for this is as follows: fire line - 80 LF pipe = $48.00 fire line - 80 LF trench = S48.00 1 san sewer service = $60.00 1 2" service = $60.00 550 LF of 6' walk = ;3400.00 1 drive approach = $60.00 Total = $676.00 This total plus the DCP Permit fee of $150.00, gives a total of $826.00 Per our conversation yesterday, you had authorized the charge number 50839500.528220.3 which was given to me by Rachel Palmer, to be used for the S826.00 amount. This information is being sent to Christie White in Engineering to initiate the processing. With the pre -con and DCP meeting scheduled on 4/30, the DCP will be issued that day. I will be out of the office from 4/23-5/6, though the City Engineering Inspector will be available at 10am on 4/30 to conduct the meeting and have the permit issued, which I will have prepared in advance of my absence. I will send notice to our typical DCP contacts regarding this meeting shortly. Let me know of anyconcerns regarding this and thanks for all of your assistance. CC: Christie White; Jerry Brown; Lance Newlin; Rach...