Loading...
HomeMy WebLinkAboutCOLLINDALE BUSINESS PARK SEVENTH - Filed CS-COMMENT SHEETS - 2003-07-31Landscape Architecture — Site Planning - Graphics 215 W. Magnolia Street, ste. 202 Fort Collins, CO. 80521 970.472.8954 February 27, 2002 Bob Barkeen Fort Collins Planning Department 281 North College Avenue Fort Collins, Colorado 80521 Ref.: The Force Sports Fields Planning Objectives Dear City Review Staff, We are pleased to submit this response to staff comments dated 12123/01, for The Force Sports Fields. 19 We have revised the fence layout and heights. We have also stepped the fence and moved the location to 2' behind the proposed ROW line. We have left a 7' high fence are along Timberline due to the fence stepping down the slope of the pond. Please refer to the section provided. The fence along Timberline and Automation Way will be vinyl clad. 20 The street: trees along Timberline have been moved behind the existing walk to avoid future widening and the existing gas line. Refer to section provided.0 10 See above response. 9 See engineering plans. 15 Done. 16 Done. 1 Taken Care. All fees have previously been paid. 2 Will take care of. 14 Tree protection fence is shown on plan. 8 Will Do. 18 Refer to Engineering plan. 17 Refer to Engineering plans for no{ation. 11 The gates have been removed from the Timberline side. 12 Added a walk from Automation Way to entry gate. 4 Has been addressed on plans. Refer to Engineering Plans. 6 Refer to Engineering Plans. 7 Refer to Engineering Plans. 3 Refer to response for item #19 above. If you have any questions or comments regarding responses, please feel free to contact me at your convenience. Thank You, Michael Chao( na / �—�-------- — 5 Project Comments Sheet Selected Departments" Cit`r of Fort Collins ..�..� Department: Engineering Date: March 1, 2002 Project: COLLINDALE B.P., 7TH FILING, THE FORCE FIELDS, AND FINAL COMPLIANCE #7-82R - TYPE I (LUC) All comments must be received by BOB BARKEEN in Current Planning no later than the staff review meeting: January 16, 2002 Note - Please identify your redlines for future reference Issue Contact: Dave Stringer Topic: Site & Landscape 10 Street trees to be placed in ultimate location for future widening of Timberline. Trees need to be placed approximately? Feet west of existing west edge of sidewalk. 21 Need to provide distance from right-of-way to fence and also distance for planting of street trees in ultimate location. Notes on plans can address these two items Topic: Utility 22 No comment - Engineering ready for mylar. Need comments from utilities to see if they are ready for Mylar. Topic: site and landscape 15 Fence to be placed 2 feet behind right-of-way line as per City standard street cross section detail Signature _IDL p Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other_ Utility Redline Utility Landscape Page 1 Project Comments Sheet Selected Departments City oI Fort. Collins Department: Engineering Date: January 16, 2002 Project: COLLIND,ALE B.P., 7TH FILING, THE FORCE FIELDS, TYPE I (LUC) All comments must be received by BOB BARKEEN in Current Planning no later than the staff review rneeting: January 16, 2002 Mote - Please identify your redlines for future reference Issue Contact: Dave Stringer Topic: Site & Landscape 10 Street trees to be placed in ultimate location for future widening of Timberline. Trees need to be placed approximately 3 feet west of existing west edge of sidewalk. Topic: Utility 9 Need to show replacement of curb gutter and sidewalk along with street repair limits. Add note that final limits of repair will be determined in the field by the City Engineering Inspector Topic: Utility, site and landscape 15 Fence to be placed 2 feet behind right-of-way line as per City standard street cross section detail Topic: Utility, site and landscape Plat 16 Need 15-foot utility easement behind new right-of-way line Signature Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other Utility Redline Utility Landscape Page I