Loading...
HomeMy WebLinkAboutCLARENDON HILLS SECOND - Filed GC-GENERAL CORRESPONDENCE - 2003-07-31Fort Collins -Loveland Water District South Fort Collins Sanitation District 4700 South College Avenue FORT COLLINS, COLORADO 80525 TELEPHONE 226-3104 — 669-4321 i September 25, 1987 Mike Herzig Community Development PO Box 580 Fort Collins, CO 80522 RE: Clarendon Hills, Second Filing Dear Mike, SEP 2 8 147 pLANNINIG DEpAR-VMF,NT The Fort Collins -Loveland Water District and the South Fort Collins Sanitation District have reviewed the above mentioned project, and are prepared to approve the drawings as submitted. If you have any questions, please give me a call. Sincerely, Michael DiTull.io District Manager xc: Terry Far -rill, Systems Engineer CITY OF FORT COLLINS DEVELOPMENT SERVICES — ENGINEERING July 5, 1988 Dennis Donovan 117 East Mountain Fort Collins, Colorado 80521 Re: Clarendon Hills - 2nd Filing Dear Dennis: This letter is to recap the punch list items obtained from our walk through of Clarendon 2nd and Ashford Commons P.U.D.s' on Tuesday, June 28, 1988. Ashford Commons: Remove and replace approx. 30 feet of roll curb, gutter and walk between driveway entrances off Ashford Lane. Traffic and street name signs as required through City Traffic Department. Clarendon Hills 2nd Filing: Remove and replace approx.. 20 feet of rollover curb, gutter and walk on Alexia Way. r' DEVELOPMENT SERVICES — ENGINEERING 300 LaPorte Ave. P.O Box 580 Fort Collins, Colorado 805.22 (303) 221-6605 Dennis Donovan July 5, 1988 Page 2 Clean concrete and debris from storm sewer inlet at cul-de-sac on Fox Hills Drive. Clean debris and backfill storm sewer outlet structure off Clarendon Hills Drive. Install metal sidewalk and over -flow grate at above location. Traffic and street name signs as required through City Traffic Department. Any damage which has occurred on Clarendon Drive will be determined at a later date after the City has reviewed the test data obtained from our pavement management consultant. Once these items have been corrected the City will begin its initial acceptance for this development. If you have any questions, please do not hesitate to call me. Sincerely, � I David Stringer Chief Construction Inspector APPLICATION FCR ENCROACHMENT UPON PUBLIC RIGHT-OF-WAY in the CITY OF FORT COLLINS, COLORADO Number — ?� Date January 19, 1989 Application is hereby made by the undersigned for a permit for an encroachment upon a public right-of-way as indicated below, subject to the provision that the applicant agrees to abide by the provisions of Chapter 23, Section 81-85 of t"e Code of the City of Fort Collins. 1. Erection, construction, remodeling or demolition of buildings 2. X Building, fence, barrier or post, underground irrigation system crossing A. APPLICANT Clarendon Hills Associates ADDRESS 309 W. Harmony Rd., Fort Collins, CO 80526 TELEPHONE (303) 226-2266 B. LOCATION OF ENCROACHMENT Under Hinsdale Drive and cul-de-sacs A, B, C, D & E (See Utility Plans). C. TYPE OF ENCROACHMENT, OBSTRUCTION OR STRUCTURE A single 6 inch Polyvinyl - Chloride (PVC) pipe conduit of schedule 200 at each crossing at a depth of 2 feet below pavement grade D. PURPOSE OF 'THE ENCROACHMENT To accomodate irrigation (sprinkler) lines (21,2- inch or less) and controller wiring crossings. E. SPECIAL CONDITIONS At the time of installation, the low end of the conduit, or sleeve shall have a vertical 2 inch conduit filled with pea gravel extending to the surface. The conduit crossing shall extend from back of easement to 'rack of easement. Permission is hereby .granted for the indicated encroachment upon a public right- of-way. _ S pp 1icant C � Citv of tort Collins /} c or of En Bering Develt nent Services Engineering Department Citv of Fort Collins March 28, 1989 Gary Nordic Nordic Construction and Development 309 W. Harmony Road Fort Collins,, Colorado 80525 Re: Special conditions to encroachment permit number 1-89 for Clarendon Hills Associates Dear Mr. Nordic: Encroachment permit number 1-89 has been approved by the City with the following conditions: 1. Use class 200 / DR 14 polyvinyl chloride pipe, not schedule 200, as the casing pipe under the street rights -of -way. 2. Backfill the pipe trench with non -shrink fill material. This fill will act as bedding material as well as trench backfill and will extend from top to bottom of the trench. (specifications are attached) 3. The responsibility for maintenance of this pipe, trench and street wearing :surface rests solely with Clarendon Hills Associates who shall hold the City harmless of any liability which should arise as a result of this encroachment. 4. The Associates will comply within 3 working days, if the City requests repairs to the system, pipe, trench or street surface. 5. Prior to making any repairs, changes or abandoning the system, which are not -at the request of the City, all appropriate permits are to be obtained., 300 L l orte AvenLI • P.O. Box 580 • Fart Collins, CO 80522-0580 • (303) 221-6605 Gary Nordic Page Two 6. All location changes, deletions or additions are to be shown on an "as constructed" drawing submitted to the City Engineers office after the system has been :installed. 7. The City reserves the right to require the removal of this system from the public rights -of -way at any time as outlined in Chapter 23 - 81 of the Code of the City of Fort Collins. 8. A copy of the encroachment permit shall be recorded with the County Clerk and Recorder. If you have any questions, please feel free to contact me at 221-6605. Sincerely, d Dave Stringer Chief Construction Inspector