HomeMy WebLinkAboutCHESTNUT VILLAGE AT CUNNINGHAM CORNER - Filed GC-GENERAL CORRESPONDENCE - 2003-07-31CONSULTING
ENGINEERS
4710 SOUTH
COLLEGE, FORT COLLINS,
COLORADO
80521 a
PH. 482-8249
October 10, 1969
City Engineering Department
City of Fort Collins
Municipal Building
Fort Collins, Colorado 80521
Re: Pavement Construction
Gentlemen:
I am writing this letter at the request of your Planner, Mr,
Don Reynolds, with reference to the installation of pavement
located on West Mulberry, north of and adjacent to Chestnut
Addition, First Filing. Presently there is existing asphalt
adjacent to the property, however, this is not in conformance
with the City Engineering and Planning Departments' require-
ments. If and when new pavement is to be installed adjacent
to Chestnut First Filing on the north, I will participate in the
installation of said pavement as required by ordinance of the
City of Fort Collins.
Very truly yours,
),R ai
Mariofie A. Chestnut
JMN : eg
MEMORANDUM
To: File
From: James R. Dubler, P.E. n -=L, r
Date: August 10, 1983
Subject: Cunningham Corner
Conference Memo
clur,
TAPaNM
STAN CM
a TAGcE
sumac atcataMs
RECEIVED
AUG 2 2 1"083
Job Number: Pf_tl#VA�9
I')EPAR T ?V4,E-4' r
Bob Schemmerling and I visited the Fort Collins City offices this morning
and resolved the following:
1. Met with Mauri Rupel and decided:
a. It would be acceptable to treat Phase I comprising areas E
and H as a replat.
b. Area H would be platted only to what will later become the
east R.O.W. line of Windmill Drive extended north to
Woodwest Subdivision.
C. The R.O.W. adjacent to Area H (i.e. the retention area) on
the south will not be paved at this time.
2. In conversation with Mauri, Dan Bunting and Tom Hays, it was
agreed that it would be to the advantage of all to pursue
Horsetooth Road paving through formation of a paving district.
Efforts will be made by the Cunningham Corner developer, with
appropriate assistance from the City, to revive this idea.
Accordingly, design plans for Horsetooth Road adjacent to Area E
of Cunningham Corner will not be required for the September 5
Final Submittal.
cc: mtcalf Ltd.
City of Fort Collins
0�auri Rupel
Tom Hays
Dan Bunting
CITY OF FORT COLLINS
MEMORANDUM
DATE: October 3, 1983
TO: Bonnie Tripoli, Development Coordinator
FROM: Marc Engemoen, Civil Engineer II ', z
RE: Chestnut Village
I've reviewed the utility drawings and Exhibit "B" for
Chestnut Village at Cunningham Corners. The only storm
drainage improvement eligible for City repayment is the
right-of-way acquisition of Tract H.
The detention pond is an on -site rather than a regional
facility. While no direct repayment for the pond will
be made, the basin fees for the development will be
reduced by a factor reflecting the volume of detention
provided. Since no design or construction of the proposed
drainage swale on Tract H has been or will be done in
conjunction with this filing, no repayment is appropriate
in these areas.
Ron Mills will evaluate the right-of-way cost, and I'll
let you know as soon as we verify the estimate or determine
a counter offer. In the meantime, please call if you have
any questions.
cc: Phil Waite
� � . ' '•n � t"'E +'ni rde, yg } ���° a�tk �Y '° r r a �,:" °� � a�� ,x Y � � r'�� p� r s 3^�ay `� " ,� r� � 1, f'xx fik'� a � ~ :b � ,'� ` _z
iAY% a,SlA.ri++rsiN iM %ti+ 'Y�OG'�i - •• ..- .
.. ,....... ,•,r.., . �"` `' .;re '>s M 8 ...T-:;: .. .,..mot , •.. rt ��,,.:+,t A`" i�rsiamli�i+iaskti�'dY�Y?5'��$aic#s.wr�cs:.ui`lk�:
Il Y+Ot { O!li (()I l INS P.O. Box 550, Fort Collins, Colorado 80522 Ph(303) 484-4220 Ext. 723
'•a:..y'MWiWP�:,RMm�aurd'1M9ti'Rkki'tid.�e'MtD'5k�4i?il:. `_iLtYN;aY n.-. ,. . ���Jf �:s. Ar+i✓Mi<i:7 S� va. ":FdU;.�:,.M�R+3. iW..rt'xK.+�..,, _. '85%$w.�2s'; :. .:-..-:` tww<. •� i �1`�.t S+e. . ".'M1�6f1EiY'� _..•^�55� -..-.sex N2a�nw,ry�pw�sp�}..�
ENGINEERING SERVICES
December 28, 1983
Tim Bryant
Silverstate Savings & Loan
1500 Grant Street
Denver, Colorado 80203
Re: Chestnut Village at
Cunningham Corners
(121 Units)
Dear Sir:
The above referenced development has been approved for construction
by action of the Fort Collins Planning and Zoning Board and/or the
Fort Collins City Council.
A development is approved for construction when the Fort Collins
Water and Sewer, Light and Power, Storm Drainage and Engineering
requirements have been met. The Developer is thus assured that
adequate water, sewer, electricity, storm drainage and streets
are either built or in the design stage, scheduled for completion
in time to service his development.
The above services are adequate for the referenced development.
Sincerely,
Tom Hays
City Engineer
cc: Ron Lustig