MARCH, MYATT, KORB, CARROLL & BRANDES
ATTORNEYS AND COUNSELLORS AT LAW
ROBERTSON BUILDING
110 EAST OAK STREET
ARTHUR E. MARCH, JR.
FORT COLLINS, COLORADO 80524
RAMSEY D. MYATT
MARK L. KORB
(303) 482-4322
JOSEPH T. CARROLL, JR.
ROBERT W. BRANDES, JR.
15, 1985
AprilRICHARD
S. GAST
LUCIA A. LILEY
J. BRADFORD MARCH
Mr. Paul Eckman
Assistant City Attorney
Municipal Building
300 LaPorte Avenue
Fort Collins, Colorado
Dear Paul:
Enclosed are the following:
19'rCE*IVE0
{APR 17 15
ARTHUR E. MARCH
1909-1981
MAILING ADDRESS:
P.O. BOX 469
FORT COLLINS, CO 80522
CITY ATTORNEY
A copy of the legal notices section from The Coloradoan,
advertising the sale of two parcels in Cedar Village, First
Filing, Fort Collins, Colorado.
Original executed quit claim deed conveying Tract A, Cedar
Village, First Filing, to the City of Fort Collins.
A check in the amount of $100.00. 101•53
The back taxes for Tract A amount to $75.65.. The person who
applied for the tax deed had to deposit $125.00 cost advance to
the Treasurer's Office. Therefore, t�re -amount to redeem is
$200.65. Once redemption has been made, a portion of the deposit
should be returned. 7-7•.'9 -+ �- -,;� - /5!^-CJ( r-acelG,���
I am su-e that the developer and the City of Fort Collins
each intended Tract A to be conveyed to the City of Fort Collins
but such con,reyance was overlooked. We hope you will take the
deed and talk the City into paying the balance of the taxes and
costs in order to conclude this matter. If you have any questions
or concerns about the enclosures, please give me a call.
Very truly yours,
MARCH, MYATT, KORB, CARROLL & BRANDES
By: �.
Ramsey D. att
RDM:rdn
cc: Dan Jensen
May 5, 1977
TO: Roger Krempel, Director of Water and Sewer Utilities
FROM: Don Parsons, City Engineer le
TIIRIJ: Roy Bingman, Director of Engineering Services 6214
RE: Cedar Village Subdivision Sanitary Sewer
The utility plans for the Cedar Village Subdivision, located on the south side
of Drake Road approximately z-mile west of Shields Street, were submitted to the
utility department staff for their review and comment.
It was requested by the utility department staff that Hanover Drive be aligned
so as to center the existing 12-inch sanitary sewer within the right-of-way,
rather than 5-feet from the fl.owline of the curb and gutter as shown on the plans.
'The reasons for such a request were the concern of storm water inflow into the
sanitary sewer system, the cost of curb and gutter replacement in the event re-
pairs on the line should actually require excavation, and uniformity of utility
locations within street rights -of -way.
Should Hanover Drive be shifted to the east, as requested, it would require a
new l-Ayout for all lots east of Hanover Drive. In addition relocation would
require that the storm sewer be located east of the sanitary sewer on Hanover
Drive. This would increase the cost of storm sewer installation by increasing
the length of catch basin laterals and the outfall line, while -not reducing any
construction costs on the sanitary sewer services.
Given the above consideration we have evaluated the utility layout to alleviate
the problems which your staff brought out. It is recommended that the manholes
subject to stormvater inflow be constructed with waterproof rings and covers.
If maintenance or construction records indicated an above average possibility
of having to excavate this existing sewer, we would consider altering the pro-
posed alignment. However, available information indicates that the sewer was
properly constructed and has not been a maintenance problem.
The standard specifications for sanitary sewers are considered as guidelines.
In the event of special circumstances, such as the one under discussion, a vari-
ance should and must be considered.
Given all considerations, we feel that the utility plan should be approved with
minor revisions.
Should you have further comments concerning this matter, please contact me.
DP:cs
r
.mil j. ......
1�
CITY OF FORT COLLINS P. 0. BOX 580, FORD COLLINS, COLORADO 80522 PH (303) 484-4220
WATER AND SEWER UTILITIES
April 14, 1978
Mr. Bruce Miller APR 19 1978
2600 Hanover
Fort Collins, CO 80521
Dear Mr. Miller:
This is to recap our conversation of April 13, 1978.
After our initial discussion of why and how the 15 inch sanitary sewer
came to be installed along the west side of Cedarwood Drive north of
Prospect Street, Pat Polifka and I requested an easement,conceding that
this request was after the fact since the line was installed.
You indicated that you had several concerns over the future ability to
further develop the west side of Cedarwood because of the constraints
imposed by a sewer easement. After discussion of those concerns, you
raised the further issue of some $15,000 that the City was holding relevant
to the development of a detention area north of Cedarwood Subdivision
on property owned by Mrs. Minatta.
Mr. Polifka indicated that he had been negotiating with Mrs. Minatta
and hoped to have the matter settled shortly. You stated your desire
to have the issue resolved quickly so that you could terminate your
involvement with that subdivision.
You indicated a willingness to grant the easement for the sewer on
Cedarwood if you could get an early resolution to the problem with the
detention area or release of your escrow amount of $15,000. I stated
I would work with Pat and that I would talk to Roy Bingman about
release of the escrow.
Later that same day, I talked to Roy and he indicated he would look
into releasing all or part of the escrow.
I hope you find this to be an accurate summary of our conversations.
Please contact me if you feel there are significant errors or ommissions.
I will continue to work with Roy and with Pat Polifka on this matter
and will keep you informed of progress.
Yours truly,
Dzl-t
Tom Hays, .E.
Senior Water and Sewer Engineer
cc: Roger E. Krempel
Roy Bingman''