HomeMy WebLinkAboutBREAKWATER ESTATES - Filed CS-COMMENT SHEETS - 2003-07-31ITtE-1]:
COMMENTS
D 17. 7,1 D AA-- 1,RTMEN'T
COLLOPY ANNEXATION & ZONING
---
C14- J�6�
6 March 85
DA RMTMEN"�
ITEVIa 20-85B BREAKWATER ESTATES - Preliminary
COmMENTS
;76L �6
Z. 4--� -sere 6 &
otjj6 ty a...
o� l°'%
4V7
3. sh k � X&,t7� 74 � JPCs
4.
CITY OF FORT COLLINS
COMMUNITY DEVELOPMENT DEPARTMENT, PLANNING DIVISION
March 13 , 1985
Mr. Dick Rutherford
Post Office Box 429
Fort Collins, CO 80522
Dear Dick,
Staff has reviewed the submittal for Collopy Annexation and would like to
offer the following comments. Revisions reflecting these comments are due by
April 10, 1985, at noon.
1. The City's Development Manual requires a statement from the applicant as
to why it is necessary and desirable for the City to annex the area.
2. Staff feels that R-L-P zoning is most appropriate for the site given the
surrounding area. It has also been our policy to attach a PUD condition
to the zoning of annexations. The petition should include the PUD
condition in the section where zoning is requested.
3. The boundary of the parcel does not match the boundary of the surrounding
plat.
Final documents are due in this office by April 25, 1985. Feel free to
contact me if you have questions.
Sinc rely,
Elaine E. Kleckner
Planner
cc: Sam Mutch, Planning Director
Bonnie Tripoli, Development Coordinator
OFFICE OF COMMUNITY 300 LaPorte Ave. • P.O. Box 580 • Fort Collins, Colorado 80522 • (303)221-6750
DEVELOPMENT, PLANNING DIVISION
CITY OF FORT COLLINS
COMMUNITY DEVELOPMENT DEPARTMENT, PLANNING DIVISION
March 15, 1985
Richard A. Rutherford
James H. Stewart. and Associates, Inc.
214 North Howes Street
Post Office Box 429
Fort Collins, Colorado 80522
Dear Dick:
Staff has reviewed Breakwater Estates preliminary subdivision and offers the
following comments:
1. Staff will support a zoning of R-L-P, low density planned residential
with a PUD condition. The following comments are based on this project
being a preliminary PUD. If you wish to proceed with both preliminary
and final PUD, requirements for final PUD are also required.
2. A variance from the cul-de-sac length is required and has been received
at submittal. Poudre Fire Authority will not oppose this.
3. Please locate fire hydrants on the site plan.
4. The median at the entrance (Tract D) will need to be removed.
5. The medians at the cul-de sacs are allowed as long as they are dedicated
as a utility and access easement but not maintained by the City.
6. Streets are to be designed to City standards.
7. Please submit preliminary utilities plan.
8. Please show right-of-way dimensions on Lemay Avenue (100' needed) and
Breakwater Drive.
9. Cul-de-sac bulbs must have minimum 28' of pavement between median curb
and gutter and sidewalk.
i.�
4
OFFICE OF COMMUNITY
300 LaPorte
Ave. • P.O. Box 580 • Fort Collins,
Colorado 80522 • (303)221-6750
DEVELOPMENT, PLANNING DIVISION
Richard Rutherford
From: Steve Ryder
March 15, 1985
Page Two
10. Landscaping may be shown on a combined site and landscape plan. Of
specific concern are:
a. Existing vegetation. Please show significant trees along the NE, E,
and SE boundaries of the site and discuss what is planned to ensure
the preservation of as many as possible.
b. Boundary treatment along Harmony Reservoir and the Spring Creek
lateral.
c. Breakwater Drive -- Lots 1, 2, and 3. How this boundary be treated?
d. Tract F at Whalers Cove is a landscape buffer. Please explore this
transition area and possible landscaping and treatment along Lemay
Avenue to Tract A.
e. Please discuss treatment of Tract A, the detention and utility
easement.
11. PUD requires a density of at least 3 DU/Ac. Please submit a variance
request from this regulation.
12. Please show building envelopes and dimensions.
13. Site and landscape covenants for PUD is attached.
Staff will forward additional comments by next week if they require further
revisions to the PUD. Revisions addressing the above comments are due by
noon April 10, 1985. PMT and colored renderings must be submitted by 4:30
p.m. April 19, 3.985. If you have any questions concerning these comments or
wish to meet to discuss them, please feel free to contact me.
Sincerely,
Steve
Ryder
City
Planner
cc: Sam Mutch, Planning Director
Bonnie Tripoli, Development Coordinator
CITY OF FORT COLLINS
COMMUNITY DEVELOPMENT DEPARTMENT, PLANNING DIVISION
March 18, 1985
Dick Rutherford
James H. Stewart and Associates, Inc.
214 North Howes Street
Post Office Box 429
Fort Collins, Colorado 80522
Dick :
The following comments are supplementary to those sent to you earlier
concerning Breakwater Estates:
1. Please show title on the subdivision plat (and site and landscape
plan).
2. From storm drainage review:
a. Break overall site into sub -basins and analyze individually.
Provide proposed new grades.
b. Find out more about The Landings 3rd pond adjacent to this project.
c. Please explain why 0.30 was used for a historic runoff coefficient.
d. How will runoff affect the Spring Creek lateral? If it is
insignificant, please provide numbers showing that is the case.
Revisions addressing the above comments are due by noon, April 10, 1985.
PMT and colored renderings are due by 4:30 p.m., April 19, 1985. If you
have any questions concerning these comments and/or wish to meet and
discuss the project, please feel free to contact me.
Sincerely,
Ale terl?r
Steve Ryder
City Planner
CC: Sam Mutch, Planning Director
Bonnie Tripoli, Development Coordinator
�""—^r�����'..,�: b. �"�;;c��� •.: ,r.. 7^° i '"i.Y { � .? �,.i.. a � r oy ,tr'„'�v '`�.� y.r"�;�+�i'�` ��^
e
... ..a»..fi ...r„.....,. .ti6.n�6zt�rod_.S:aei�.t..Aa,d....ar.�m..iiw.a. .... ..,t Ms.,Y„o...,..xa..3.,4s..,a.::;...ucry.,.u.,:4_.�ar.�a'.aix...,....;3.. �:�r '� c•.
OFFICE OF COMMUNITY 300 LaPorte Ave. • P O. Box 580 • Fort Collins. Colorado 80522 • (303)221-6750
DEVELOPMENT, PLANNING DIVISION
D CR
7T DA
6 June 1985 '
#20-85B BREAKWATER ESTATES PUD - Final
.6
04)�
CITY OF FORT COLLINS
COMMUNITY DEVELOPMENT DEPARTMENT, PLANNING DIVISION
June 18, 1985
Dr. Charles Collopy
C/O Richard A. Rutherford
Stewart & Associates
P.O. Box 429
Fort Collins, Colorado 80522
Dear Dick:
Staff has reviewed Breakwater Estates -- final subdivision, and offers the
following comments:
1. Please show a temporary turnaround at the west end of Shore Pine Court.
This will allow for emergency access out of the site.
2. The detention pond may need re -shaping to accomodate sidewalk on Lemay
and Breakwater.
3. Some recalculation is needed for release rates and sizing of the pond.
4. Please include statement on plat and subdivision agreement that the
homeowners association will maintain the common areas (Tracts A, Al, B,
and C).
5. The cul-de-sac redesign is a minor problem. The 29' right-of-way is
not adequate. Staff suggests you reduce the size of the island to
allow a 28' paving width.
6. Please provide for a non -vehicular access easement for lots 6 and 7.
7. The lots along Lemay Aveenue have been replatted and now lot 6 does not
meet the minimum lot depth of 150' subdivision requirement. A variance
request must be submitted explaining the need for waiving this
requirement.
8. Please dimension Lemay and Breakwater and indicate where the
right -of• -way was dedicated.