Loading...
HomeMy WebLinkAboutCOBBLESTONE CORNERS PUD - Filed GC-GENERAL CORRESPONDENCE - 2003-07-31DATE: 3-27-95 DEPARTMENT: Stormwaterr Utility ITEM: Cobblestone Corners P.U.D.- Landscape Administrative Change The grading revisions have been reviewed as submitted on 3-20-95 and we have the following comments as indicated in red on the attached print: There is on section that has 1.6% grade. Stormwater criteria requires an underdram or concrete pan on grades of 21/0 or less. However this is privately maintained and the grades appear to be 2% or greater elsewhere. if during certification this is discussed and documented as a variance request it would be accepted. Some dots were shown between buildings 14 and 15 with no elevations. I believe this was an oversight but the change from the original approved plan still needs to be addressed. The spot elevations indicate the flow could follow the path indicated but do not document the crossection that would contain the flow. Please provide cross sections or at least spot elevations on either side of the invert spot to indicate that there is a Swale. During certification the capacity will also need to be verified. I believe Ted Shepard has been in the field to discuss berming revisions. Once the grading is completed please submit the final site certification and reference previous certifications so someone pulling thiis in)i�the future can find all the info. This certification is needed in order to pull the building permits on lots 1 & 2 as agreed by Ed Seier. All items above can be addressed with the final certification if a variance is the chosen route for the first item. cc: Ed Seirer Dave Stringe Ted Shepard �13tht.�� Street f 0. Bk,\ ;8O • Fort Culhr— CO nW;22-0580 - (303) 221-6789 - FAX (30_;) 221-h2;q