HomeMy WebLinkAboutDAKOTA RIDGE PUD - Filed CS-COMMENT SHEETS - 2003-07-31PROJECT
�«n�o��,� COMMENT SHEET
ty
DATE: 2 June 92 DEPARTMENT: i S.
ITEM: 60-91E DAKOTA RIDGE PUD, 1stFlg
Final - - - - --
Please respond to this project by Friday, June 12, 1992
Planner: Ted Shepard -
No Problems
Problems or Concerns (see below)
41 r h
�r l;�c o� -�iC
h elis.e b�irri�
proposespIw"/[Scatt, will rct?uil-cr
bt o„
�djfiA � l� r U, rq' df wa i ( of
propose �
�. r a j� proG� ;� rc�� �
Date: 3' y2� Signature:
CHECK IF REVISIONS REQUIRED: PLAT
SITE
LANDSCAPE
❑ UTILITY
PLANNING DEPARTMENT 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580 (303)221-6750
PROJECI
���a�� COMMENT SHEET
C,tyaf
DATE: 2 June 92 DEPARTMENT:
ITEM: 60-91E DAKOTA RIDGE PUD, 1st Flg
Final
Please respond to this project by Friday, June 12,1992
Planner: Ted[ Shepard
No Problems
%C Problems or Concerns (see below)
nonere
k> !13 rya. l (y A Z9, n 4f 4 �a y
-r'y�t cal
�1-re� 5�c:-n
��5 ► n c���.� n� ��� �n� �'�
Date: 6°114 /1'7 �Signature:
CHECK IF REVISIONS REQUIRED: [A
T
kvr� IJJ/�—
�
PLAT
SITE
LANDSCAPE
UTILITY
PLANNING DEPARTMENT 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580 (303)221-0750
� � I �� ��
f�G� � c�Y1 Pt i� �-��CvYI -!"�"r ��7� �2 �-.
Community Planning and Environmental Services
/ �q
City of Fort Collins
Planning i- )artment
June 19, 1992
Mr. Jeff Couch.
Parsons and Associates
432 Link Lane Plaza
Fort Collins, CO. 80524
Dear Jeff: - - - - -
The Planning Staff has completed the interdepartmental review for
Dakota Ridge P.U.D. First Filing, Final. The following comments
are offered:
1. The Public Service Company needs to install two gas lines
along the north side of East Horsetooth Road. One is an
intermediate pressure feeder line and the other is a
distribution pressure feeder line. Since these lines must be
placed in. a utility easement, there may be some problems with
the size of the easement and potential conflicts with the
street trees, perimeter fencing, irrigation pipe and other
underground utilities. Consequently, it is recommended that
a utility coordination meeting be scheduled to resolve
potential. conflicts. The City will schedule and facilitate
this meeting.
2. U.S. West requires a 20' x 20' easement for telephone cabinets
at the southeast corner of Lot 7. In addition, U.S. West has
the following questions.:
A. Is -the 10' access, drainage, utility, and irrigation
easement at the south edge of Tract A wide enough for
telephone cable and all other utilities planning to use
this; easement?
B. What is the description of the 15' easement along the
sough side of Lots 1 - 7? Is wide enough to accommodate
all utilities?
C. Is the 10' easement along the east property line wide
enough for the developer to provide utility trenches
along with the 4' concrete pan in the center of the 10'
easement?
D. Doer the 20' Tract B dedicated right-of-way permit
utility crossings? If not, dedicated utility easements
would be required.
?81 North Coll.ee Avenue • P.O. u,» ;8O • Fort Collins, CO t,07,22-O�80 (;031 ��1-(�__ �
3. The P.U.D. should indicate all ramp locations► sidewalk
widths, greenbelt widths, and street widths.
4. The following comments pertain to the plat:
A. The Tracts are not clearly defined and soom to conflict
with street right-of-way. The boundaries of the Tracts
are not clearly defined, especially Tract-0 C, D, and E.
B. Should Tract B be referred to as "ritatlt-of-way" or
"access, drainage, and utility.easement''t'
C. An offsite drainage easement may be requived at the end
of Fall River Dri~v�:"
D. The vicinity map should be more readable, ;over a larger
area to the south (Linton School), and include major
street names.
E. The control monuments must be described.
F. The outer boundary monuments must be des('t•ibed.
G. Please remove the reference to Sheets 2/%+U and 3/20.
H. The legal description should read: "... Coutttt4ncing at the
Southwest Corner of Said Section •29... ", tlot quarter.
I. The notation at the southeast corner %)f Lot 63 is
unreadable.
5. If there is a non -regional detention pond, it will not be
maintained by the City of Fort Collins Stormwatt"' Utility. If
a homeowner's association is established, ttt��n Parks and
Recreation will not maintain the arterial streetscape.
6. The Parks and Recreation Department must revi4,l4 and approve
the landscape details and irrigation plan for t!«3 streetscape
along Horsetooth Road. Parks and Rec will not 1)t'gin arterial
maintenance for a period of two years or until A,. Opted by the
City. A concrete mow strip must be provided fot' the perimeter
fence, or the sidewalk must be widened to the centerline of
the fence.
7. The final design of the fence must be detailed lti a schematic
on the P.U.D.
8. Any reference to metal sidewalk culverts shoitt%t be deleted.
It is the experience of Parks and Recreation th,0 these should
be surfaced with concrete, not metal in order be safer for
bikes.
9. The developer of Stone Ridge P.U.D. has agreed to provide a
local street connection from Caribou Drive/Fieldstone Drive
north into Pine Cone O.D.P. to form a tee intersection with
Dakota Drive. This tee intersection will occur directly
adjacent to the proposed City Park. Since this street
connection will feature an eight foot wide, detached
bicycle/pedestrian path, the need to extend your path in
drainage swale west to Dakota Drive is eliminated. The path
in the drainage Swale need only go as far west as the Stone
Ridge/Pine Cone local street connection, where _it can meet up
with the eight foot wide detached path going northwest to the
Park.
10 Please add a fire hydrant near lot 50.
11. Please include a detail of the second point'of access. Thi!
could shown on an expanded and updated vicinity map.
12. The Poudre Fire Authority indicates there is a already a
Dakota Drive but it does not show up on our street map.
Perhaps it is a new street in the County or was platted but
never built. Please investigate. If the name is a duplicate,
another name must be selected.
13. Also, the P.F.A. advises that there are already streets named
"Wolf Creek" and "Fall River". Again, if these are
duplicates, then new names must be selected.
14. Please acid the attached planting detail to the landscape plan
for all trees in the dryland areas. The "recessed tree basin"
is an important planting technique in areas that are not
irrigated.
15. Please add the following note to the landscape plan:
"Final acceptance of maintenance by the City of Fort -Collins
of all trees and streetscape along East Horsetooth Road will
be after a period of two years after planting."
16. The landscape plan should specify "Marshall" Green Ash.
17. The issue of the common fence between Dakota Ridge and Stone
Ridge must be resolved and shown on the Final P.U.D. prior to
the Planning and -Zoning Board hearing. The design objective
is to not have competing fences and to establish design
uniformity. The perimeter fencing for Oak Ridge P.U.D. along
Lemay Avenue, south of Oak Ridge Drive, has been well received
by the public.
18. Since the project does not meet the 65% solar orientation
requirement, it is recommended that, for only those lots need
to reach 65% compliance, other methods be explored for
promoting solar gain. These include but are not limited to
placing garages on the north, maximizing windows on the south,
or placing the structure on the lot so that the house itself
may be within 30 degrees of a true east -west line.
19. The Planning and Zoning Board may have additional comments or
suggestions as a result of the preliminary hearing on June 22,
1992.
20. Staff applauds the use of a detached sidewalk on the east side
of Dakota and placing street trees in the parkway strip. This
is a non-standard design for a local street that upgrades the
streetscape and will add a traditional character to the
neighborhood.
21. If the irrigation ditch is to be piped, then permission must
be obtained from Mr. Harold Webster. As of this writing, Mr.
Webster has not been contacted and he has expressed- concern to
this office regarding this lack of communication.
This concludes Staff comments at this time. Please note the
following schedule for the July 27, 1992 Planning and Zoning Board
meeting:
Plan revisions are due Wednesday, July 1, 1992.
P.M.T. Is,. renderings, 10 prints are due Monday, July 20, 1992.
Final my -Lars, site and landscape covenants, and development
agreement* are due Thursday, July 23, 1992.
* If the development agreement is not executed by the time of the
July 27, 1992 Planning and Zoning Board hearing, then Final may be
approved subject to the condition that the agreement be executed
prior to the second monthly P & Z Board hearing following July 27,
1992. If this time frame is insufficient, then the developer may
ask the P & Z Board for an extension at this subsequent meeting.
As always, please call if you have any questions regarding these
comments.
Sincerely:
Ted Shepard
Senior Planner
xc: Sherry Albertson -Clark, Chief Planner
Kerrie Ashbeck, Civil Engineer