Loading...
HomeMy WebLinkAboutCOLLINDALE BUSINESS PARK THIRD REPLAT LOT 5 - Filed GC-GENERAL CORRESPONDENCE - 2003-07-31BILL A. STASHAK A.I.A. ARCHITECTURE / PLANNING 5 FOREST HILLS LANE FT. COLLINS, COLORADO (970) 4 1 6-9060 FAX: (970) 462-365 1 June 25,1997 PROJECT: EDM @ 4001 Automation Way, Collindale Business Park, Fort Collins, CO STATEMENT OF PLANNING OBJECTIVES EDM (Engineering Data Management) proposes to develop lot 5B of Collindale Business Park, a 1.37 acre or 60,002 sq. ft. Site in the (E) Employment District. Phase One will include a 9,685 sq. Ft. one story building consisting of Engineering Offices,Test Lab and Shop Area. Parking for 15 employees and 4 visitors will be located on the South side yard allowing or building frontage to the R.O.W. The west backyard will be planted with dryland grass until Phase Two, allowing for the additional 4,450 sq. ft. building and 21 parking stalls is deemed necessary and feasible. II. Please refer to the context diagram in the PDP Submittal packet for adjacent land use applications. No known wetlands or open space currently exist on or directly adjacent this site. III. The Owner(s) of EDM and Lot 5B will be responsible for stewardship, maintenance and manicuring of building and grounds within its property line borders. IV. EDM personnel currently consists of approximately 15 employees, which include engineering,technical and administrative staff. V Site 5B was selected and purchased as suitable for EDM's current and possible future needs. The (E) employment district appears applicable to the type of research & testing conducted b:y EDM. Page 2 Cont. V. Building orientation & massing take into consideration southern exposure for natural day lighting to parking and building. Note: the upper level windows of the testing lab will provide reflected light from the white ceiling to reduce the need for artificial lighting. Offices are exposed primarily to the South and East elevations. Delivery and outdoor testing areas are located to the West of the building and screened from the street. Detention and drainage easements are located to the North and East on the site at the natural low grades. VI. Applicant has strived to incorporate applicable criteria in the Land Use Code for developing site. The request for Variance from the required 15' R.O.W. setback is the only requested modification. VII. Not applicable. VIII. Not applicable. IX. Not applicable. W. STASHAK & ASSOCIATES ARCHITECTURE/ PLANNING LLC 5 FOREST HILLS LANE Fr. COLLINS, COLORADO (970) 4 1 6-9060 FAX: (970) 462-365 1 October 7,1997 PROJECT: Healing .Arts Institute @ 4007 Automation Way, Collindale Business Park, Fort Collins, CO STATEMENT C)F PLANNING OBJECTIVES Healing Arts Institute proposes to develop lot 5A of Collindale Business Park, a 1.39 acre or 60,485 sq. ft. Site in the (E) Employment District. Phase One will include a 7,360 sq. Ft. one story building consisting of Classrooms, Administrative Offices, and Therapy training rooms. 50 Parking for Staff, Students and Visitors will be located on the South side yard and West allowing for building frontage to the R.O.W. Phase Two, allowing for the additional 2,840 sq. ft. building and 15 parking stalls if deemed necessary and feasible. II. Please refer to the context diagram in the PDP Submittal packet for adjacent land use applications. No known wetlands or open space currently exist on or directly adjacent this site. III. The Owner(s) Healing Arts Institute and Lot 5A will be responsible for stewardship, maintenance and manicuring of building and grounds within its property line borders. IV. Healing Arts personnel currently consists of approximately 10 employees, which include Executive, Administrative, and Clerical staff. V. Site 5A was selected and purchased as suitable for Healing Arts Institute's current and possible future needs. The (E) employment district appears applicable to This Adult Occupational School. Page 2 Cont. V. Building orientation & massing take into consideration southern exposure for natural day lighting to parking and building. Note: the upper level windows of the main corridor will incorporate reflected light from the white ceiling to reduce the need for artificial lighting. Offices are exposed primarily to the South and West elevations. Detention and drainage easements are located to the North and East on the site at the natural low grades. VI. Applicant has strived to incorporate applicable criteria in the Land Use Code for developing site. VII. Not applicable. VIII. Not applicable. IX. Not applicable.