HomeMy WebLinkAboutCOLLINDALE FIFTH - Filed GC-GENERAL CORRESPONDENCE - 2003-07-31M&I consulting engineers
4710 South College Ave.- Fort Collins, Colorado 80525
Telephone (303) 226-2323
M & I No. 092-117.2
December 9, 1982
Mr. Phil Waite
City of Fort Collins
P. 0. Box 580
Fort Collins, CO 80522
RE: Collindale 5th Filing
Dear Phil:
As stated in the drainage report for Collindale 5th Filing, we are util-
izing the existing combined drainage facilities of the Collindale area
and the Southmoor Village Development. This is in accordance with the
drainage concept as approved in the initial development stages of the
Col]indale Project.
We are requesting a variance regarding the on -site detention for this
site. This variance was granted for the Collindale Project and we are
conforming to those conditions for this phase.
Should there be any comments or questions concerning this, please con-
tact me.
Very truly yours,
M & I, INC.
V1 I J�tt'� Qom�!&v r,--
Micheal. R. Lawson
MRL/scb
December 13, 1982
Mr. Michael R. Lawson
M&I Consulting Engineers
4710 S. College Avenue
Ft. Collins, CO 80525
Dear Mike:
Regarding your letter dated December 9, 1982 requesting a variance
in the on -site detention requirenents for Collindale 5th Filing,
I have the following comments.
Because the drainage policy for the Collindale Subdivision is to
utilize the existing detention pond in the Southmoor Village
Developmnt, I see no problem with your request. Your request is
hereby granted provided the following conditions are met.
The storm runoff outfall must be sized to carry the 100-year developed
peak flows from the entire area including future phases. High water
in the detention pond backing up into the outfall must be considered
in the design.
Sincerely,
Philip G. Waite
Civil Engineer II - Storm Drainage
cc: Mauri Rupel
� Nr8
-
�
l;arana�wrm�.mnw�.n.. .....^ns•a+. ,« <.xm•.:csr � she. 4,�k3$"M��Y�ef€�L.J1C+ _�•..a.Ain u'�w,+sra ..>x. Ft.��*,2'pt.,, r,_.a�rd.�c.i§"+ � � � CITY OF FORT COLLINS P.O. Box 580 Fort Collins, Colorado 80522 Phone 484-4220 Ex 1'23
ENGINEERING SERVICES
October 21, 1983
Larry Cline
Bartran Homes
1136 Bent Tree Court
Fort Collins, Colorado
Re: Collindale, 5th Filing
Dear Larry:
The intent of this letter is to restate the City's position regarding
the fire hydrant and a portion of the water line which appear to have
been installed incorrectly on Quail Hollow in the Collindale 5th Filing.
As you are aware, you were instructed by our construction inspector
that the hydrant and water main would have to be lowered. The water line
is to be lowered to a point where the line will have a cover depth of
four (4) feet six (6) inches from the finished street surface. The
hydrant shall be lowered to the bury line scriped on the hydrant stand pipe.
After this work has been accomplished, the City will accept this section
of water main pending normal warranty periods.
Without full time inspection on private development built public improvements,
the City has to assume the required improvements are built to its criteria.
Therefore, the burden of compliance rests with the developers, their
contractors and engineering firms. Historically this arrangement has
worked well with all parties concerned. But, circumstances do arise
where mistakes are made with the end result being a hardship to meet
certain deadlines for the developer or his contractors. When these
do occur the City's position is not to place blame but to insure that
the necessary corrective measures are taken, thus reducing the potential
for future maintenance costs. Therefore, the developers and their contractors
are required through City Codes and agreements to construct developments which
are built in compliance with the City's codes, ordinances, policies,
design and construction standards. In addition, public right-of-way
improvements are subject to warranty periods.
Larry Cline
October 21, 1983
Page Two
As I assume the public improvements installed to date in the
Collindale Sth Filing Subdivision have been built in compliance
with the previously mentioned criteria and their inspection and
acceptance pending the normal warranty periods is complete,
your request for their acceptance by the City is valid.
The public improvements constructed
Sth Filing have been inspected and
the normal warranty periods.
Sincerely,
David Stringer
Chief Construction Inspector
cc: Tom Hays
to date in the Collindale
accepted by the City pending
Rartran
Homes
March 8, 1984
City of Ft. Collins
Attn: Kathy
Planning Dept.
300 Laporte Ave.
Ft. Collins, CO 80521
Dear Kathy:
Attached are 20 copies of the Collindale 5th filing Replat P.U.D.
All improvements on the 5th filing have been installed and approved
by the City as of this date. The boundary ofthe replat will be exactly
as the original boundary.
We appreciate the consideration of this request for replat as a P.U.D.
Sincerel ,
Larry Kline
Bartran Homes,
LK/ka
Inc.
1136 Bent Tree Court • Fort Collins, Colorado 80525 0 Ph. (303) 223-2200
CITY OF FORT COLLINS
ENGINEERING SERVICES
May 30, 1984
Bartran Homes
Larry Kline
1136 Bent Tree Court
Fort Collins, Colorado 80525
Re: Quail Hollow Court - Collindale 5th P.U.D.
Dear Larry:
In response to your letter of May 24, 1984 concerning the asphalt
pavement on Quail Hollow Court, we agree in part with your proposed
alternatives. The fence as it presently exists will remain until
the show homes are no longer needed. However, prior to the issuance
of permanent Certificates of Occupancy for 1506, 1500, 1501, 1507 and
1517 the fence will be removed and all street damage will be repaired
to the most current City street repair policies. When the damaged
areas have been corrected the entire cul-de-sac will receive a 11"
asphaltic concrete overlay with all incurred costs the responsibility
of Bartran Homes Incorporated. Immediately after the overlay has
been completed the City will accept this street for full maintenance
responsibilities.
If your firm is in agreement with these conditions, please sign this
letter and return it to me.
Sincerely,
David Stringer
Chief Construction Inspector
Larry Kline
Bartran Homes
cc: Tom Hays
Date
J'
� -�"OF
r ✓ � ) j.s�Ir, �7�T b � .31{y�� �J �t� y ,{ix -
. ,.. _ . .. � ......., N.....Y✓ ..>.. .:� c.. :.a„ _ _� ..� ., ,. _ ,.d..- _ ..� _.. _..» . , ..«.>4 .�, e. .. , ...�.: .e_ �. �iucF6:asS4.tY.5`'�`��'� ``�'`-• - .,,' +
F_NGIU (-RING SERVICES IV 300 LaPorte Ave . PO. Box 580 . Fort Collins. Colorado 80522 . (303) 2PI-6605
CITY OF FORT COLLINS
MEMORANDUM
DATE: May 31, 1984
TO: Felix Lee, Chief Building Official
FROM: Dave Stringer, Chief Construction Inspector
RE: Quail Hollow Court Show Homes, Collindale 5th PUD
During construction of their show homes, Bartran Homes
has damaged portions of the asphaltic pavement on Quail
Hollow Court. The City Engineer's office and Bartran
have yet to reach an agreement to insure that this damage
will be repaired. However, we do not want to prohibit
the builder from marketing his homes and will release
the Quail Hollow Court addresses subject to the following
conditions:
• 1500, 1506, 1507, 1513 and 1501 Quail Hollow Court
will only be issued temporary certificates of occupancy
by the Building Inspection Department.
The above addresses shall be subject to Engineering's
approval prior to the issuance of temporary or
permanent C.O.'s.
A copy of this memo will be kept with the temporary C.O.'s
to insure the City's requirements to the builder will be met.
Attachment
cc: Tom Hays
Construction Inspectors
CITY OF FORT COLLINS
DEPARTMENT OF NATURAL RESOURCES
June 5, 1986
Jerry Tworek
Department of the Army
Omaha District, Corps of Engineers
Regulatory Branch
P.O. Box 5
Omaha, Nebraska 68101-0005
Re: Application No. CO 2SB OXT 008211
Mitigation Plan
Dear Mr. Tworek:
The mitigation. plan submitted by Martin Kosec, P.E. for Bartran Homes, Inc.
for the above referenced application totally meets the needs and concerns
of the City of Fort Collins Department of Natural Resources with the
exception of one concern. That concern is the requirement for two years of
maintenance of the off —site mitigation consisting of the pond and wetland
located 1,000 feet north of the wetland proposed to be filled.
The two year developers maintenance responsibility should begin upon the
final approval of the construction and landscaping. Following that period,
the City would assume the maintenance of site of mitigation.
The City presently owns the mitigation site. A neighborhood meeting was
held to explain the mitigation proposal to all adjoining property owners.
There was unanimous consent of those present for the proposal.
The mitigation has been reviewed and discussed with the staff of the City
Planning and Storm Drainage Departments and has their consent.
Sincerely, /
i l C_�
Roger E. Krempel, P.E.
Natural Resources Manager
cc: Martin W. Kosec
Bob W. Smith
Elaine leckner
DEPARTMENT OF 112 N. Howes • P.O. Box 580 • Fort Collins, Colorado 80522 • (303) 221-6600
NATURAL RESOURCES
MARCH, MYATT, KORB, CARROLL & BRANDES
�j`�
ATTORNEYS AND COUNSELLORS AT LAW t�l`
ROBERTSON BUILDING
110 EAST OAK STREET �
ARTHUR E. MARCH, JR. 3AI�THII R�Qi4R/�i`RCH
FORT COLLINS, COLORADO
RAMSEY D. MYATT 80524 jj,, I'\Jo-JJigVVa��i
MARK L. KORB (303) 482-4322
MAILING ADDRESS:
JOSEPH T. CARROLL, JR.
6
ROBERT W. BRANDES, JR.
RICHARD S. GAST ``T-T�-"''"''�'�
LUCIA A.LILEY June fJ, 1984 F0g0522
�epffiRT
J. BRADFORD MARCH
Kurt Smith
Planning Department
City of Fort Collins
Dear Kurt:
As we discussed earlier, something needs to be done regarding
the notice that was filed with the County Clerk and Recorder by
your office covering Collindale Fifth. The notice recorded shows
a Planned Unit Development known as "Collindale V Filing, P.U.D.
and describes the property more particularly as Collindale V
Filing. I am not sure how the P.U.D. map read but the subdivision
map which is now on file with the County Clerk and Recorder
describes the subject property as "Collindale Fifth Filing, a Sub-
division, located in the City of Fort Collins, State of Colorado".
I need to get the notice to conform with the correct legal des-
cription or five years down the line this is going to be impos-
sible to untangle. I would appreciate any efforts your office
could give us in getting this problem solved.
Sincerely yours,
MARCH, MYATT, KORB, CARROLL & BRANDES
J. Brad March
JBM : rd n
Encl.
cc: Ken Frazier
City Attorney's Office