Loading...
HomeMy WebLinkAboutCOLLINDALE PUD THIRD - Filed GC-GENERAL CORRESPONDENCE - 2003-07-31(.IIY OI 1010 ( MI INS ENGINEERING DIVISION August 20, 1980 John Gurwel.l Construction 2999 Garfield IAveland, Colorado 80537 Re: Collindale 3rd Filing Dear John: The water and sewer mains installed by your firm on Collindale 3rd filing have been inspected and will be accepted for main- tenance pending contractors normal warranty period. Sincerely, David Stringer, Chief Engineering Construction Inspector ab Bartrum Avlomes Novcmher 4, 1980 ylaur i Rupe l City of Dort Collins !'ort Collin';, CO. Nttcntion: Mauri Rupel, Assistant City Iingineer - Development Dear Plaur,i : In reference to the Pedestrian Toot Bridge betiveen Collindale 1st. and 3rd. filing alon,, our North property, Bartran Homes, Inc. is still interested in completing this structure yet this year. if the City will evaluate the plucemernt of the bridge foundation and support walls in relation to the sanitatary sewer, and advise us as to the location which best satisfies the drainag' requirements of the litch for the future, Bartran Homes will start construction immediately. Bartran homes, Inc. is also willing to brar one-half of the cost of construction for the structure to insure CUlnpl of on yet this vear. Bec.�Ise of '.nar commitments to ouI- home owners in stating to may of them that the bridge would he built this year we feel an obligation to follow through. Your consideration in this matter will be appreciated. Sincerely, Larry hlcfnc l,h: rm !A1 1942 Constitution Avenue 0 Fort Collins, Colorado 80526 9 Ph. (303) 482-7221