HomeMy WebLinkAboutCACHE LA POUDRE INDUSTRIAL PARK PUD - Filed DA-DEVELOPMENT AGREEMENT - 2003-07-31DEVELOPMENT AGREEMENT
THIS AGREEMENT, made and entered into this Q3 day of 31
A.D. 198_'� by and between THE CITY OF FORT COLLINS, COLORADO, a Municipal
Corporation, hereinafter referred to as "the City," and COWAN CONCRETE
PRODUCTS, INC., A Colorado Corporation, hereinafter referred to as "the
Developer,"
WITNESSETHi
WHEREAS, the Developer is the owner of certain property situate in
the County of Larimer, State of Colorado, and legally described as
follows, to -wit:
Cache 'La Poudre Industrial Park P.U.D., located in Sections 17
and 18, Township 7 North, Range 68 West of the Sixth Principal
Meridian, City of Fort Collins, Lari mer County, Colorado.
WHEREAS, the developer desires to develop said property and has
submitted to the City a subdivision plat and/or a site plan, a copy of
which is on file in the Office of the City Engineer and made a part hereof
by reference: and
WHEREAS, the Developer has further submitted to the City a utility
plan for said lands, a copy of which is on file in the office of the City
Engineer and made a part hereof by reference; and
WHEREAS, the parties hereto have agreed that the development of said
lands will require increased municipal services from the City in order to
serve such area and will further require the installation of certain
improvements primarily of benefit to the lands to be developed and not to
the City of Fort: Collins as a whole; and
WHEREAS, the City has approved the subdivision plat and/or site plan
submitted by the Developer subject to certain requirements and conditions
EXHIBIT "A"
1. Schedule of water lines to be installed out of sequence.
Not Applicable.
2. Schedule of -sanitary sewer lines to be installed out of sequence.
Not Applicable.
3. Schedule of street improvements to be installed out of sequence.
Not applicable.
4. Storm drainage improvements to be installed out of sequence..
Not applicable.
.41
-10-
EXHIBIT "'B"
The Development Agreement for Cache La Poudre Industrial Park P.U.D.
COST ESTIMATE FORMAJOR DRAINAGE IMPROVEMENTS
ITEM DESCRIPTION QUANTITY UNIT COST TOTAL COST
1. Storm sewer, manholes, end
sections, etc.
(a)
Outfall Sta 0+00 to Sta 5+50
550
L.F.
100/L.F.
$
55,000
36" Diameter
(b)
Crossing Culverts 36" diameter
600
L.F.
90/L.F.
$
54,000
Timberline Rd. 600 LF
(c)
Riser inlet structure
1
Ea.
7000 Ea.
$
7,000
5" diameter Sta. 5+50
(d)
Headwall and Flap Gate
1
Ea.
7000 Ea.
$
7,000
Sta. 0+00
Sub -Total $ 123,000
2. Channel excavation, detention
pond excavation and riprap
(a) Channelization Sta. 22+23 to Lump Sum $ 25,000
24+20
(b) Drop Structures No. 1 & 2 Lump Sum $ 20,000
(c) Regrading west slope of southwest lake Lump Sum $ 22,500
Sub -Total $ 67,500
3. Professional Design
(a) Design & Construction ESTIMATED Lump Sum $ 15,000
Management
Total estimated cost of Storm Drainage improvements
eligible for credit or City Repayment $ 205,500
RCPTN # 85057281 7/85 12:56:42 # OF F _3 — 1
J. ULVANG, RECORDER - LARIMER COUNTY, CO. DOC. FEE -
NOTICE
FEE - $3.00
$.00
Please take
notice that on
April 29,
1985, the Planning
and Zoning Board of
the City of
Fort Collins,
Colorado,
approved the Master
Plan Plan known
as Cache La Poudre Industrial Park
, which development was submitted
Master Plan
and processed in accordance with Section 118-83 of the Code of the City of
Fort Collins. The Master Plan Plan of the subject property together with
the development agreement dated NSA between the City of Fort
Collins and the developer, out of which documents accrue certain rights and
obligat'ons of the developer and/or subsequent owners of the subject
property, are on file in the office of the Clerk of the City of Fort
Collins.
The subject property is more particularly described as follows:
r
City 1 e rk ;
A tract located in Section 17 & 18, T6N, R84W of the 6th P.M.
<----;e 4PJ%-
Secre ry, Planning and Zoning Board
City of F t Collins
Dated :_ /I / qr
RCPTN # 85057279 11/'7/85 12:56:12 # OF PA-- — 1 FEE —
J. ULVANG, RECORDER - .RIMER COUNTY, CO. DOC. t-- - $.00
$3.00
NOTICE
Please take notice that on August 28, 1985, the Planning and Zoning Board of
the City of Fort: Collins, Colorado, approved the PUD Plan known
as Cache La Poudre Industrial Park PUD , which development was submitted
Lot rar_t-
and processed in accordance with Section 118-83 of the Code of the City of
Fort Collins. The piin Plan of the subject property together with
the development agreement dated August 23, 19 5between the City of Fort
Collins and the developer, out of which documents accrue certain rights and
obligations of the developer and/or subsequent owners of the subject
property, are on file in the office of the Clerk of the City of Fort
Collins.
The subject property is more particularly described as follows:
A tract located in Section 17 & 18, T6N, R84W of the 6th P.M.
C
ler Secr to y, Planning and Zoning Boar
Cit o Fort Collins
Dated
TT
which involve the installation of and construction of utilities and other
municipal improvements in connection with said lands.
NOW, THEREFORE, in consideration of the promises of the parties
hereto and other good and valuable consideration, the receipt and adequacy
of which is hereby acknowledged, it is agreed as follows:
1. General Conditions.
A. All. water lines, sanitary sewer collection lines, storm
sewer lines and facilities, streets, curbs, gutters,
sidewalks, and bi kepath s shall be installed as shown on the
approved utility plans and in full compliance with the
Council -approved standards and specifications of the City on
file in the Office of the City Engineer at the time of
approval of the utility plans relating to the specific
utility, subject to a two (2) year time limitation from the
date of execution of this agreemen`t . In the event that the
Developer commences or performs any construction pursuant
hereto after two ('4") years from the date of execution of this
agreement, the Developer shall resubmit the. project utility
plans to the City Engineer for reexamination. The City may
require the Developer to comply with approved standards and
specifications of the City on file in the Office of the City
Engineer at the time of resubmittal.
B. No building permit for the construction of any structure
within the development shall be issued by the City until the
water lines, fire hydrants, sanitary sewer and streets (with
at least the base course completed) serving such structure
-2-
have seen completed and accepted by the City. No building
permits shall be issued for any structure located in excess
of six hundred sixty feet (660') from a single point of
access.
C. Any water lines, sanitary sewer lines, storm drainage lines,
and/or streets described on Exhibit "A", attached hereto,
shall be installed within the time and/or sequence required
on Exhibit "A". If the. City Engineer has determined that any
water lines, sanitary sewer lines, storm sewer facilities
and/or streets are required to provide service or access to
other areas of the City, those facilities shall be shown on
the utility plans and shall be installed by the Developer
within the time as established under "Special Conditions" in
this document.
D. Except as otherwise herein speci fi c�ally agreed, the Developer
agrees to install and pay for all water, sanitary sewer and
storm sewer facilities and appurtenances, and all streets,
curbing, gutter, sidewalks, bikeways and other municipal
facilities necessary to serve the lands within the
development.
E. Street improvements (except curbing, gutter and walks) shall
not be installed until all utility lines to be placed therein
have been completely installed, including all individual lot
service lines leading in and from the main to the property
line.
F. The installation of all utilities shown on the utility
drawings shall be inspected by the Engineering Division of
—3—
i,i
the City and shall be subjected to such department's
approval. The Developer agrees to correct any deficiencies
in such installations in order to meet the requirements of
the plans and/or specifications applicable to such
i nstal 1 ati on. In case of conflict, the utility drawings
shall supercede the standard specifications.
G . All storm drainage facilities shall be so designed and
constructed by the Developer as to protect downstream and
adjacent properties against injury and to adequately serve
the property to be developed (and other lands as may be
required, if any) . The Developer has met or exceeded minimum
requirements for storm drainage facilities as have been
established by the City in its Drainage Master Plans and
Design Criteria. The Developer does hereby indemnify and
'hold harmless the City from any and all claims that might
arise, directly or indirectly, as a result of the discharge.
of injurious storm drainage or seepage waters from the
development in a manner or quantity different from that which
was historically discharged and caused by the design or
construction of the storm drainage facilities, except for (1)
such claims and damages as are caused by the acts or
omissions of the City in maintenance of such facilities as
have been accepted by the City for maintenance; (2) errors,
if any, in the general concept of the City's master plans
( but not to include any details of such plans, which details
shall be the responsibility of the Developer); and (3)
-4-
specific directives as may be given to the Developer by the
City. Approval of and acceptance by the City of any storm
drainage facility design or construction shall in no manner
be deemed to constitute a waiver or relinquishment by the
City of the aforesaid indemnification. The Developer shall
engage a licensed professional engineer to design the storm
drainage facilities as aforesaid and it is expressly affirmed
hereby that such engagement shall be intended for the benefit
of the City, subsequent purchasers of property in the
development and downstream and- adjacent property owners
all of whom shall be, third party beneficiaries of said
agreement between the Developer and Engineer.
H . The Developer shall pay storm drainage basin fees in
accordance with Chapter 93 of the City Code. Storm drainage
improvements eligible for credit- or City repayment under
provisions of Chapter 93 are described together with the
estimated cost of the improvements on the attached Exhibit
"'B" , which improvements shall include right of way, design
and construction costs. The basin fee payable by the
Developer shall be reduced by the estimated cost of said
,eligible improvements. Upon completion of such eligible
improvements, the amount of such reduction shall be adjusted
to reflect the actual cost. If the cost of the eligible
improvements constructed by the Developer and described in
the above mentioned exhibit exceeds the amount of the storm
drainage fees payable for the development, the City shall
reimburse the excess cost out of the Storm Drainage fund upon
111-4
completion of the improvements and approval of the
construction by the City.
I. The Developer shall provide the City Engineer with certified
Record Utility Drawing Transparencies on Black Image Diazo
Reverse Mylars upon completion of any phase of the
construction.
Z. Spec cal Conditions.
A. Storm drainage lines and appurtenances.
The Developer grants to the City a perpetual easement to
discharge upstream water through the development property and
into Spring Creek. The upstream storm water will be conveyed
through a system of ponds and culverts. This system will be
installed by the Developer according to the design specifica-
tions of the City. The City will reimburse the developer for
that portion of actual costs of construction, engineering
design and construction management directly related to the
conveyance of upstream storm water. Only those costs which
can be documented to directly apply to the conveyance of
upstream storm water are subject to reimbursement. Other
terms and conditions of the agreement between the parties
pertaining to this easement are described with particularity
in a separate "Easement Agreement" between the parties hereto
executed this date and incorporated herein by reference.
3. Miscellaneous.
A. The Developer agrees to provide and install, at his expense,
adequate barricades, warning signs and similar safety devices
at all construction sites within the public right-of-way
and/or other areas as deemed necessary by the City Engineer
in accordance with the City's "Work Area Traffic Control
Handbook" and shall not remove said safety devices until the
construction has been approved by the City Engineer.
B. The Developer shall, at all times, keep the public
right-of-way free from accumulation of waste material or
rubbish caused by his operation, shall remove such rubbish no
less than weekly and, at the completion of the work, shall
remove all such waste materials, rubbish, tools, construction
equipment, machinery, and surplus materials from the public
ri ght-of-way. He further agrees to maintain the finished
street surfaces free from dirt caused by his operation. Any
excessive accumulation of dirt and/or construction materials
shall be considered sufficient cause for the City to withhold
building permits and/or certificates of occupancy until
corrected to the satisfaction of the City Engineer. If the
Developer fails to adequately clean such streets within two
(2) days after receipt of written notice, the City may have
the streets cleaned at his expense and he shall be
responsible for prompt payment of All such costs.
C. The Developer hereby insures that his subcontractors shall
cooperate with the City's construction inspectors by ceasing
operations when winds are of sufficient velocity to create
blowing dust which, in the inspector's opinion, is hazardous
to the public health and welfare.
D. When the inspector determines that erosion (either by wind or
water) is likely to be a problem, the surface area of
erodable earth material exposed at any one time shall not
exceed 200,000 square feet for earthworks operations.
Temporary or permanent erosion control shall be incorporated
into the subdivision at the earliest practicable ti me. By way
-7-
of explanation and without limitation, said control may
consist of seeding of approved grasses, temporary dikes,
gabions, and/or other devices.
E. The Developer shall, pursuant to the terms of this agreement,
complete all improvements and perform all other obligations.
required herein, as such improvements or obligations may be
shown on the original plat, or on any replat subsequently
filed by the Developer, and the City may withhold such
building permits and certificates of occupancy as it deems
necessary to ensure performance hereof. In addition, it is
agreed and understood between the developer and the City that
the City shall have the right to refuse issuance of building
permits and certificates of occupancy in the subject
development. as the City, in its sole discretion, shall deem
necessary in order to insure performance by the developer of
any other obligation the developer may have to the City,
whether pursuant to other development agreements, or
otherwise.
F . Nothing herein contained shall be construed as a wai ver of
any requirements of the City Code, and the Developer agrees
to comply with all requirements of the same.
G. In the event the City waives any breach of this Agreement, no
such waiver shall be held or construed to be a waiver of any
subsequent breach hereof.
H. Financial obligations of the City of Fort Collins payable
after the current fiscal year and/or not appropriated or
budgeted are contingent upon funds for that purpose being
0
appropriated, budgeted and otherwise made available.
I. This Agreement shall be binding upon the parties hereto,
their successors, grantees, heirs, personal representatives,
and assigns and shall be deemed to run with the real property
above described.
ATTEST:
3t1YL4kG�� � .
—ty--Clerk
APPROVED:
.-ity ngi near �
APPROVED AS TO fpRM:
114 - /� -2
y ttbrrre
ATT ST:
Donald a e, ec a ary
THE CITY OF FORT COLLINS, COLORADO
A Municipal orporati on
By
/G•�Jj6`
Ity anager
COWAN CONCRETE PRODUCTS, INC. a
Colorado Corporation
r
1 c ar bap—er Pr si dent
(Corporate Seal)