Loading...
HomeMy WebLinkAboutBROWN FARM FIFTH - Filed GC-GENERAL CORRESPONDENCE - 2003-07-31FISCHER, BROWN, HUDDLESON Ati[ ' ;UNN ATTORNEYS AT LAW ELEVENTH FLOOR. FIRST NATIONAL TOWER POST OFFICE DRAWER J FORT COL.LINS,COLORADO 80522 AREA CODE 303/482-1OS6 February 27, 1978 Mr. John R. Hutchinson M&I Consulting Engineers 4710 South College Avenue Fort Collins, Colorado 80521 RE: BROWN FARM FOURTH FILING DRAINAGE WARD H. FISCHER WILLIAM H. BROWN CHAS. R. HUDDLESON WILLIAM C-GUNN W. PAUL ECKMAN STEVEN B. RAY Pleasant Valley and Lake Canal Company will accept the waters from Detention Ponds A and B, as designated on Exhibit No. Two, of the Brown Farm Fourth Filing brochure, dated October, 1977. This willingness to accept the water is, however, conditioned upon: 1. The 12" pipe must be so placed and constructed so that no waters from the ditch can flow into the detention pond. 2. A concrete structure, acceptable to the ditch company, and approved by President Michie, must be constructed in the ditch so as to prevent erosion. Yours truly, PLEASANT VALLEY & LAKE CANAL COMPANY By: G �- Ward H. Fischer, c etary WIiF:djs cc: John Michie May 19, 1978 Mr. John R. Hutchinson M & I Consulting Engineers 4710 South College Avenue Fort Collins, Colorado 80521 RE: BROWN FARM FIFTH FILING DRAINAGE Pleasant Valley and Lake Canal Company will accept the waters from Tract "B" Detention Pond as designated on Exhibit No. 2 of the Brown Farm Fifth Filing Drainage report dated November, 1977. This willingness to accept the water is, however, conditioned upon: 1. The 12" pipe must be so placed and constructed so that no waters from the ditch can flow into the detention pond. 2. A concrete structure, acceptable to the ditch company, and approved by its President, must be constructed in the ditch so as to prevent erosion. Yours truly, FISCHER, BROWN, HUDDLESON AND GUNN By: t_ Steven B. Ray Attorneys for Pleasant Valley and Lake Canal Company SBR: dj s lW12i (;3O;3) 7!)4-61'W3 fn�lusfriulf;i��iEil�'C;u. _':� l�r��ric tilur6 i�rr,il I' U liar ];frill March 12, 1979 City of Ft. Collins Engineering Department Ft. Collins, Co. 80521 Attention: Mr. Morrie Rupel Dear Morrie: Regarding the substitution of 33" A.S.T.M. ss II f Y S.T.M. C-76 Class III for the projec Brown's Farm, Filing tter will confirm our conversation at 8:30 A.M. March 8, 1979 regarding your verbal permission with regards to this class change. We wish to thank you for your help in this matter and if we can assist you in any way, please don't hesitate to call. Very truly yours, CARDER �ONCRETE PRODUCTS CO. i Leo Perkins LP/sr N CITY Of L()I\L_ L COLINS P.O. BOX 580, FORT COLLINS COLORADO SOS?"? PH iOs� S 1"0 ENGINEERING DIVISION June 22, 1979 Wheeler Realty 530 S. College Fort Collins, Colorado Re: Brown Farm 5th Gentlemen: EXT. 728 It is standard policy for the City of Fort Collins to accept for perpetual maintenance those drainageways and detention ponds within a standard subdivision which are dedicated to the City for storm water transportation and/or detention and are approved by the City Council and which have passed all required guarantee periods. Planned unit developments are excluded from this policy since the homeowners associations maintain drainageways as well as green belts. Since Brown Farm 5th has been approved by the City Council, "low level" maintenance by the City of the detention pond and drainageways in Tracts "A", "B" and "C" will be assumed by the City upon completion of construction and the guarantee period. Yours truly, 77 Donald M. Parsons City Engineer P.f30h �bQf ORT C OL[_INS COLORh0>>7 � ,�_n� Y.�.•��.E> CITI'OF IORI COLLINS H (303) l81 4220 ENGINEERING DIVISION EXT. 728 June 25, 1979 Mr. Jerry Ryder Cap Construction Company 1035 Coffman Longmont, Colorado Dear Jerry: The water and sanitary sewer lines of the 2nd phase of Brown Farm, 5th Filing, have been accepted pending the normal one year warranty. Sincerely, gm Gatha onstructi nri can Inspector - CITY OF FORT COLLINS P.O. BOX 580, FORT COLLINS, COLORADO 80522 PH (303) 484-4220 ENGINEERING DIVISION August 7, 1979 Mr. Dan Wheeler Wheeler Realty 530 S. College Fort Collins,, Colorado Dear Dan: There are three items concerning Brown Farm 5th Filing that I would like to bring to your attention. First, now teat the rollover curb, gutter and walk on Langshire are installed, the bikepath should be completed for the upcoming school opening. Second, the compaction on the water service trenches at the south end of White Rock Court was completed without any notification, so before any basework on that street can begin, several 3' test holes will have to be dug. Third, we need to get together at the intersection of Ryeland and Stuart to discuss the action that needs to be taken to correct the pavement collapse problems. Sincerely, Uht t �, Lyti�z f'iL' Ga i ,tract .Inspector EXT. 728