HomeMy WebLinkAboutBREAKWATER ESTATES SECOND - Filed GC-GENERAL CORRESPONDENCE - 2003-07-31CITY OF FORT COLLINS
ENGINEERING SERVICES
November 25, 1985
Tom Dougherty
Scavo-Dougherty Builders, Inc.
220 E. Mulberry
Fort Collins, CO 80524
Re: Utilities for Breakwater 1st & 2nd
Dear Tom:
This is to inform you that the water and sewer mains installed
by Schmidt Excavating in Breakwater lst and 2nd have been tested
and accepted by the City for maintenance pending the contractor's
normal guarantee period.
Sincerely,
Craig Farver
Construction Inspector
cc: Mark Goldrich, Schmidt Excavating
�jl� "i3 a .*.c ti• .1' �'b.'aT"p� .�y'—Jo;Y} j� ,�+P�°S+c�Cra'��''�.� —T�"..?#
E,N[=!NFERING SERVICES 200 LaPorte Ave. P O. Box 580 Fort Collrns, Co'lnrarlo 80522 (5031 221-6605