COMMENTS:
1. Minor revisions to utility plans will be required.
2. Fire access may be a problem. Applicant should provide evidence to show
how 150 foot fire access requirement is met. Should work closely with
Poudre Valley Fire Authority. There may be some problems with the fencing
plan and fire access. Gates may be required.
3. Timing of improvements to Harmony Road will be required. Off -site improve-
ments will be required. Please note on site plan.
4. Drop-off drives on collector streets should be eliminated.
5. Question duplication of drives. Would recommend continuing drives to
parking and sharing of curb cuts.
6. Traffic Impact Study will be required. Traffic should also address cul-
de-sac at west end of Hillburn Drive.
7. Applicants should provide written justification as to how this property
relates to surrounding existing and future uses.
8. Applicant should connsider central active recreation area for use by
entire project.
I recommend we meet as soon as possible to discuss the above comments.
Revisions to the plans should be submitted to this office no later than
noon March, 8, 1985. It is critical that the above deadline be followed if
the itzm is to be considered at the March meeting of the Planning and
Zoning Board. if you should have any questions, please feel free to call
this office.
Sincerely, 1
Joe Frank
Senior City Planner
CC: Sam Mutch, Planning Director
Bonnie Tripoli, Development Coordinator
i3A3E 5 '" P' ZDEPARTME'a AT E rq
ITEM: 25-81E BELAIR PUD (Village at Harmony West, 1st Filing) REVISED
COMPOIENTS
CITY OF: FOIST COLLINS
COMMUNITY DEVE=LOPMENT DEPARTMENT, PLANNING DIVISION
December 21, 1984
Mr. Jim Gefroh
Gefroh Associates, Inc.
344 E. Foothills Parkway, Suite 5W
Fort Collins, Colorado 80525
Dear Jim:
Staff has reviewed the application for preliminary approval of the Belaire
PUD Tract A - Villages at Harmony West and offers the following comments:
1. Mountain Bell suggests dedicating rear lot utility easements. The
developer should contact Robert Snow at 224-7473 about a Land
Development Agreement for telephone service.
2. PSCO will require that a ten foot wide utility easement be dedicated on
both sides of all streets adjacent to the property line for utility
use. Only one gas service will be provided to each building excluding
carriage house. If gas is desired at the carriages houses, the
developer must fuel line to the 1 service location designated on the
six or eight plex, etc. Fifteen foot easements will be required along
Harmony Road. The site plan should indicate all existing utility and
proposed easements.
3. Will the drainage improvements shown on the Villages at Harmony West
PUD still be the same - particularly off -site channel? Please clarify.
4. There will be certain off -site street improvements required for this
development. They will need to meet current standards. Harmony Road
may need to be redesigned to meet current City standards.
5. Numerous buildings do not meet fire access requirements. All exterior
walls must be within 150 feet of an access point for fire apparatus or
the buildings must be sprinkled. Note number 6 in terms of sprinkling
of garagE!s is not acceptable. The circular drives are too narrow for
fire accE!ss so note number 5 is also not acceptable. Some relocation
of fire hydrants is recommended.
6. The subdivision will need to be replatted.
tr r wr.r-'wv,. x . .. .'�d4, P � i - 1 •- a c .+. .i. �. v.-�..,y .v_ xt 11 i".k.. ��m"w a5 q�
Mr. Jim Gefroh
From: Joe Frank
December 21, 1984
Page Two
7. Show distance from each envelope to at least two platted property
lines.
8. Trash enclosures materials and height should be indicated on site plan.
9. Parking islands in parking areas must be at least 8 feet wide to
accomodate one tree and other plantings. None of the islands on the
plan appear to be adequate.
10. Height of fences in site should be indicated on the site plan.
11. The Master Plan for the Villages at Harmony West will need to be
revised to reflect the change in land use in this phase. This must be
approved by the Planning and Zoning Board. A formal submittal of the
revised Master Plan will be required.
12. Security lighting of parking areas and buildings should be indicated on
the site plan.
13. The circular drives which access the collector streets (Seneca Street
and Regency Drive) are not acceptable and should be removed. The
circular drives which access the local streets do not appear to meet
city standard in terms of distance to intersections and distance to
other adjacent curb cuts. The applicant needs to work with the staff
to develop a solution to the local street curb cuts.
14. The site plan should show the ultimate width of Harmony Road including
proposed median improvements and intersection design.
15. Will there be any phasing of the project? If so, how will public
street improvements be phased?
16. Energy conservation measures being planned for the site should be
indicated on the site plan.
17. Staff is concerned about the air pollution impacts of 251 additional
fireplaces in the area. Staff would recommend the applicant consider
the following options: Eliminate the fireplaces; reduce the number of
fire places being proposed; use natural gas rather than wood as fuel
source for fireplaces; catalytic converters; or other acceptable means
of reducing the air pollution impacts of wood fireplaces.
18. Building elevations should be submitted at this time.
19. Exact height of all proposed buildings should be indicated on the site
plan rather than forty feet.
20. Sidewalks should be setback a minimum of six feet from the curb rather
than five feet as indicated. A formal tree planting should be planned
for in this area.
Mr. Jim Gefroh
From: Joe Frank
December 21, 1984
Page Three
21. The overall density of plantings should be increased, especially along
public streets. Landscape objectives should be provided which
addresses planting concept, maintenance and irrigation.
22. Note 13 should be graphically illustrated on the site plan. A typical
foundation planting should be indicated on the landscape plan.
23. Private outdoor areas for each dwelling unit should be provided. Please
indicate how this requirement is being met for this plan.
24. The circular drive does not appear to be wide enough for parking and
circulation. Please provide evidence as to how these areas will
function.
25. Hilburn Drive will eventually be extended to the west and therefore a
permanent cul de sac is not necessary. However, a temporary
turn -around will be required. If the applicants desire to improve the
end of Hilburn Street to a greater degree than is required for a
temporary turn around at this time, the applicant will have to commit
to replacing the street to city standard when the future connection is
made. Please note future design and applicants future responsibilities
on the site plan.
26. Staff does not feel that adequate setback has been provided between
building 3 lot 2, building 4 lot 1, and building 3 lot 19 and the west
property line. Please increase this setback.
27. Distance between fence line and ROW line of Harmony Road should be
indicated. Exact treatment of this fence should be indicated.
Additional shrub and evergreen plantings should be provided along this
fence.
28. Active open space areas should be shown on the site plan, if any.
29. Surrounding 150 information is missing from the site plan.
30. Has the Park in this section been acquired by the City? Please verify
to receive density credit. Also, applicant should provide evidence to
support employment center credit.
31. Twenty-one (21) handicapped parking spaces will be required for the 21
type "A" units. Please show locations on site plan.
32. Preliminary site plan should include required signature blocks. Please
revise.
I recommend we meet as soon as possible to discuss the above comments. I
will not be, available between December 24, 1984 and January 4, 1985. If
you would like to discuss the staff comments during this time, I recommend
you contact Sam Mutch and/or Bonnie Tripoli of this office.
Revisions to the plans should be submitted to this office no later than
January 8, 1985. Also, on January 21, 1985, 8 1/2" x 11" reductions of all
Mr. Jim Gefroh
From: Joe Frank
December 21, "1984
Page Four
plans, colored renderings of the site and landscape plans, and ten full
size copies of all plans should be submitted to me. It is critical that
the above deadline be followed if the item is to be considered at the
January meeting of the Planning and Zoning Board. If you should have any
questions, please feel free to call this office.
Sincerely,
Joe Frank
Senior/City Planner
i
Sam Mutch
Bonnie Tripoli
MEM0RAN1)UN
Bob Snow
Mountain Bell -Engineering
124 W. Magnolia
TO: Fort Collins, CO 80521
FROM: Bonnie Tripoli, Development Coordinator
RE: Utility Plans
DATE: February 7, 1985
VAEC IF'N*rT)
FEB 1 tJa
Submitted for your review and comment are utility plans for
Belair PUD - Final
Please respond by
February 22, 1985 0 �/
"
PLf.sa.
r1EPAPT M �—N'
CITY OF FORT COLLINS
COMMUNITY DEVELOPMENT DEPARTMENT, PLANNING DIVISION
February 20, 1985
Mr. Jim Gefroh
Gefroh Associates, Inc.
344 E. Foothills Parkway, Suite 5W
Fort Collins, Colorado 80525
Dear Jim:
Staff has reviewed the application for final approval of the Belaire PUD
Tract A - Villages at Harmony West and offers the following comments:
1. The ten foot utility easements adjacent to the public streets will be
adequate for the installation of natural gas. But in cases where the
easement starts at back of walk, there will not be room for any
additional utilities in easements. Standard requirements of fifteen
feet for gas, electricity and water boxes will apply.
2. There will be certain off -site street improvements required for this
development. They will need to meet current standards. Harmony Road
may need to be redesigned to meet current City standards. The extent of
these improvements should be noted on the site plan.
3. The property will be assessed $178.00 per acre for the Warren Lake
Trunk Sewer Basin Fee.
4. An additional fire hydrant will be required on Regency and Wake Robin.
Please coordinate location with Bonnie Tripoli.
5. Please provide detail on proposed barricades on fire lanes. Barricades
shall be posted "no parking - fire lane". If sprinkling of buildings
is contemplated, this should be noted on the site plan.
6. The sidewalk along Harmony Road should be a minimum of seven feet in
width. Please revise.
7. The developer will be responsible for installing Hillburn into the
property to the west when needed. This will include removing cul de
sac and installing local street. Please note on site plan.
...�. r... �n.ar.uT — . .'.;,p,;y.,, .x j�'N:d:...'i.;n�ai......1..�_c.aaia.e.r ��LLvs_...;rw.i..y::.:.r.,•s.:..,SR�6v'ie.e.r �..i�a.xX>.sJ.� xt' `:., .. .. ... s,. ...
OFFICE OF COMMUNITY 300 LaPorte Ave. • P.O. Box 580 • Fort Collins, Colorado 80522 • (303)221-6750
DEVELOPMENT, PLANNING DIVISION
8. In some instances, distances to building envelope is shown to the fence
rather than to the property line as required. All building envelopes
should be dimensioned from at least two different property lines.
9. Typical width of parking spaces, both regular and handicapped, should
be indicated on the site plan.
10. Raised curbing is required around landscape islands and at perimeter of
parking areas to prevent cars driving onto landscaping. Please note
this requirement.
11. The site plan should note material of trash screen fence.
12. Note number 6 is illegible. Please revise.
13. Private outdoor space should be provided for each living unit rather
than for each lot as indicated on note number 20. Please clarify.
14. An issue that arose during the Planning and Zoning Board review of the
proposal was the height and setback of some of the buildings,
especially, the buildings on lots 1, 2 and 19, from adjacent
properties. Additional information should be submitted justifying the
proposed 12 - 15 foot setback.
15. The Planning and Zoning Board approved the preliminary plan with
certain conditions. The applicant should provide a written response to
these conditions. Note number 19 is not sufficient to address the
parking problem on the circular drive. Additional signage and
covenants should be provided. The site plan should clearly note
"temporary turnaround" at west end of Seneca and proposed treatment.
Building elevations for all buildings have not been received by this
office. Please submit these drawings, including exterior materials and
colors, for staff review and approval. Applicant will need to provide
written justification for energy conservation note and expected energy
savings.
16. Additional comments on the landscape plans are forthcoming.
17. The applicants had previously agreed to natural gas fireplaces. This
should be noted on the site plan.
18. Building and parking lot lighting should be indicated on the site plan.
Please revise.
19. On Monday, March 18, 8 112 x 11" PMT reductions of all plans, colored
renderings of the site plan and building elevations, and ten full size
copies of the site, landscape plan, and building elevations should be
delivered to this office.
20. Signed mylars of the site, landscape, building elevations and plat
should be delivered to this office no later than noon, Thursday, March
21. Also on that date, a signed Site and Landscape Covenants document
should be submitted.