HomeMy WebLinkAbout800 LEMAY PROPERTIES - Filed GC-GENERAL CORRESPONDENCE - 2003-07-3108TE: Janua�y
TO: Peter Barnes. 113ning Officier
Mick Mercor, Dporationu/Maintenanom "'Idn1niotrator
, 4�
RE., 800 Lemay Proportias
This na�o io to act as a ^flag" for the building permii.t Cation Pmr
the project known as ^800 Lanay Properties" being planned by WJM Hssooiates.
Duu to unusual circumstances they were unable to submit a drainage report in
thu normal planning raviou proce�15 and havC discussed with me the necessity of
oubmitting (&nd seouring approval of a dra1nar-ja r-port BEFORE a building
permit will be 1suued. Thanks for your he:lp in this matter.
cc: Bonnie Tripoli"."
Dave Stringer
CITY OF FORT COLLINS
COMMUNITY DEVELOPMENT DEPARTMENT, PLANNING DIVISION
January 23, 1986
Mr. Frank Vaught
ZVFK Architects/Planners
11 Old Town Square, Suite 200
Fort Collins, CO. 80524
Dear Mr. Vaught:
As you are aware, the Development Agreement between Arbor Properties, LTD,
and the City, of Fort Collins contains a provision pertaining to street
oversizing and the City's repayment to the Developer of Oversizing costs.
Specifically, Paragraph 2.B.i, provides as follows:
When payment is requested by the Developer, the City's obligation for
payment shall be limited to those funds then budgeted, appropriated and
available by the City for the development or work then completed.
You should be advised that, at the present time, City funds are not
presently available for repayment of oversizing costs under this provision.
This fact should be taken into consideration by you in determining whether
to proceed with your development at this time. The unavailability of such
funds wil not, however, affect the continuing review of your proposed
development by the Planning and Zoning Board according to the standards and
criteria contained within the Land Development Guidance System.
Efforts to address this problem have been undertaken. Alternative
solutions will be proposed to the City Council as soon as possible. The
City will make every effort to arrive at a resolution of the problem which
will enable the City to continue to cooperate with the development
community in promoting responsible land use and development. We will keep
you apprised of our efforts in this regard.
Very truly yours,,
Giede
y
Director of Engineering Services
OFFICE OF COMMUNITY
n.wi.n 0- n�VlClrl nl
300 LaPorte Ave. • P.O. Box 580 • Fort Collins, Colorado 80522 • (303)221-6750
CITY OF FORT COLLINS
COMMUNITY DEVELOPMENT DEPARTMENT, PLANNING DIVISION
January 23, 1986
Mr. Jim Johnson
Sullivan, Hayes and Company
1800 Hudson's, Bay Center
1600 Stout Street
Denver, CO 80202
Dear Mr. Johnson:
As you are aware, the Development Agreement between Alma West, Sunrise
Center Partnership, Bruce L. Cason, Stephen D. Johnson, Eastside Venture
Limited, Fort Collins Assemblage, Limited, Super -Block Holding, State of
Colorado and the City of Fort Collins contains a provision pertaining to
street oversizing and the City's repayment to the Developer of Oversizing
costs. Specifically, Paragraph 2.B.i, provides as follows:
When payment is requested by the Developer, the City's obligation for
payment shall be limited to those funds then budgeted, appropriated and
available by the City for the development or work then completed.
You should be advised that, at the present time, City funds are not
presently available for repayment of oversizing costs under this provision.
This fact should be taken into consideration by you in determining whether
to proceed with your development at this time. The unavailability of such
funds wil not, however, affect the continuing review of your proposed
development by the Planning and Zoning Board according to the standards and
criteria contained within the Land Development Guidance System.
Efforts to address this problem have been undertaken. Alternative
solutions will be proposed to the City Council as soon as possible. The
City will make every effort to arrive at a resolution of the problem which
will enable the City to continue to cooperate with the development
community in promoting responsible land use and development. We will keep
you apprised of our efforts in this regard.
Very truly
Gary 7ede
Director of
yours,
e_/
-j"
Engineering Services
yea
S a
OFFICE OF COMMUNITY
I1 11— /1 KACnlT nl AKmimII'_ ( wi\
,lrinl
300 LaPorte Ave. • P.O. Box 580 • Fort Collins, Colorado 80522 • (303)221-6750
�
' wim
associates
��������y��`�����*���
' Architects and Planners, pc
February 12, 1986
Bonnie Tripoli
City of Fort Collins, Planning Division
300 LaPorte Avenue
Fcrt Collins, Colorado 80522
discussion
February 4, I
In accordance
with our
to
the supplementary
have
made a number
of
of revisions
the 800
Lemay
Proes ( Case
perti
information
plan
existing
conditions
^ Informatin
o regarding
been
from var ious
city
departments,
has
gathered
field
consultants
and
utility
companies,
investigations
and
is accurate
to
the best �f our
This office
accepts
o
responsibility fr
knowledge
the
~
land planning
design
k on
this plan If you
have
any questions,
please
call.
Best
regards,
David Knox
/49 West Harvard, Suite 302
Fort Collins, Colorado 80525
z
p" 1 1'
r'VI Rr.,
r
-Mountain Plains
Constructors, Inc.
'P.O. Box,1059, Fort Collins, Colorado 80522 • (303) 493-3576
14,�' ,:, 1 ,. November 5, 1986
Mr. Jim Newell
Office of Development Services
300 Laporte Avenue
Fort Collins, Colorado 80521
Dear Jim:
This letter is to certify that we the owners of 800 Lemay
Properties will accept all liability for placing our building
foundation in the existing utility easement. We are now
in the process of attempting to vacate 2' of the utility easement.
Sincerely,
Marvin Fries
(7?d_
Pat Potter
Mountain Plains
Constructors, Inc.
P.14). Box 1059, Fort Collins, Colorado 80522 • (303) 493.3576
November 5, 1986
Mr. Jim Newell
Office Of Development Services
300 LaPorte Avenue
Fort Collins, Colorado 80522
Dear. Jim:
This letter, is in regards to our conversation yesterday concerning the
property located at 800 Lemay. At the north lot line of the above property
there is a discrepancy of 2.61 feet between the center line of Lemay and
the true section line. The true section is 2.61 feet west of the center
line of Lemay.
The legal description for the 12' utility easement which parrallels
Lemay on the east side is written of the center line of Lemay.
In order for us to construct the proposed building and meet the parking
requirements as set by Peter Barnes we need to utilize our full east
west lot dimension. Because of the above discrepancey our building will
protude 1.61 feet into the existing utility easement.
We respectfully request that the east 2 feet of this utility easement
be vacated. The following is the legal description of this utility
easement that we request vacated.
Commencing at the West quarter corner of said Section 18; thence along
the centerline of Lemay Avenue, North 00000100" East 899.94 feet; thence
South 90000100" East 60.00 feet to the true point of begining of this
description, thence along North 00000100" East line, South 71.00 feet;
thence along South 9000010011 East line, East 2.0 feet; thence along North
00000100" East line, North 71.00 feet; thence along South 90 00'00" line,
West 2.0 feet to the true point of begining.
Containing 142 square feet or 0.003 acres.
You will find enclosed 10 copies of visual aids showing
this 2 feet of vacated easement. Please call me if you
have any questions.
Sinjcerely,
,,/Jim Brown
Mountain Plains Constructors, Inc.
JB/ls
Enclosures