DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: 00-14 Issuance Date:
Project Name: Civic Center Office Building
Project Location: Northwest Corner of Laporte Avenue and Mason Street
Permittee: City of Fort Collins; Jack Gianola
City and developer contacts: See attached Exhibit "A "for names and phone numbers of all
contact persons for this project.
Fees: Permit Application Fee (paid at the time of application) $(na)
Construction Inspection Fee (paid prior to issuance of this permit) na
Total $(na)
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$(NA)
Form of security deposited with the City: (NA)
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Geotechnical Engineer shall be responsible to perform material testing and other tests as
required; the Project Engineer shall, as required by the City in the development agreement, certify
that the improvements are constructed in accordance with the approved Utility Plans and the
standards and specifications of the City; shall revise and secure City approval of all revisions to
the utility plans and related documents; and shall prepare and submit to the City "as -constructed"
plans prior to the City's acceptance of "the constructed" public improvements.
2. All contractors who perform work on this project must be bonded and licensed in
conformance with City requirements.
3. Construction tnne restrictions: Normal Construction Hours
Y�O •Fort Collin", CC) 0722 0�80 • (97Oj 221-6605 • FAX (970) 221-6378
h vvw.ci.fort-c0 1hn,,.co.0
Development Construction Permit, Page 2
4. The applicant understands that additional permits may be required for this development
project and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design,
traffic study, drainage report, plat easements and any other official documents), shall be kept on
the development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use
Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, Whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration
date. Such application shall contain information sufficient to justify the granting of the
extension. An extension may be granted for up to six months.
7. Building permits and certificates of occupancies will only be issued when all conditions
contained in the Development Agreement and Sections 3.3.2(C) and (D)of the Land Use Code or
Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable,
are met. If the Development Agreement does not specify times for completion of public
improvements, or if there is no Development Agreement, then the improvement requirements
specified in Section 24-95 of the City Code shall apply, which provides that construction of all
improvements shall be required prior to the time of issuance of the first building permit. Not
withstanding the foregoing, it is agreed that the public infrastructure improvements shall be
completed prior to issuance of the certificate of occupancy for the Office Building. The
preceding statement shall take the place of the development agreement.
8. Acceptance by the City of the public improvements shall be after (1) final inspection has
been conducted by the City ; (2) punch list items from the final inspection are completed and
accepted by the City; and (3) required certifications from the licensed professional engineer that
improvements are completed to City standards, specifications and approved Utility Plans and the
"as -constructed" plans have been received and accepted by the City.
9. The City Erosion Control Inspector must be notified at least twenty four (24) hours prior to
any planned construction on this project. All required perimeter silt fencing and other
erosion/sediment control best management practices (BMP's) that can be installed prior to
construction must be in place and inspected by the City Erosion Control Inspector before any
land disturbing activity begins.
Development Construction Permit, Page 3
11. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
12. Other conditions: It is understood that there is not a development agreement for this project.
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the
owners of the property (including all owners having legal or equitable interest in the real property, as
defined in Section 1-2 of the City Code; and including common areas legally connected to or associated
with the property which is the subject of this application) without whose consent and authority the
requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City
officials to enter upon. the property for purposes of inspection and, if necessary, to enter upon such property
to perform work required of the applicant if the applicant were to fail to perform the required work. I also
acknowledge that I have read this permit document with all its requirements and conditions, and I
agree to all of the terms and conditions so stated in this permit.
L.
Applicant/Project Manager's Signature:. - �" Date:
Approval for issuance:
City Engineer Approval: / �r Ct �� Date:
(Permit Issuance Date)
EXHIBIT "A"
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name: Civic Center Office Building
City Staff Contact Persons:
Development Engineer: Mark McCallum, City of Fort Collins, 281 N. College
Avenue, Fort Collins, CO 80522
970/221.6605 ext. 7656
Construction Inspector: Craig Farver, City of Fort Collins, 281 N. College Avenue,
Fort Collins, CO 80522
Office: 970/221.6605 ext. 7294
Mobile: 970/222.0854
Current Planner: Troy Jones, City of Fort Collins, 281 N. College Avenue,
Fort Collins, CO 80522
9701221.6750 ext. 6256
Water Utilities Engineer: Roger Buffington, 700 Wood Street, Fort Collins, CO
80521
970/221.6854
Stormwater Engineer: Jay Barber, 700 Wood Street, City of Fort Collins, CO
80521
970/221.6063
Erosion Control Inspector: Bob Zakely, 700 Wood Street, City of Fort Collins, CO
80521
970/221.6063
Natural Resources: Kim Kreimeyer, City of Fort Collins, 281 N. College Avenue, Fort
Collins, CO 80522
970/221.6750 ext. 6641
Traffic Operations: Ward Stanford, 700 Wood Street, City of Fort Collins, CO
80521
970/221.6820
Street closures: N/A
Transportation Planning: Kathleen Reavis, 210 East Olive Street, City of Fort Collins,
CO 80524
970/224.6140
1
Forestry: Tim Buchanan, City of Fort Collins, 281 N. College Avenue,
Fort Collins, CO 80522
970/221.6361
Light and Power: Doug Martine, 700 Wood Street, City of Fort Collins, CO
80521
970/224.6152
Developer's Contact Persons:
Project Manager: Jack Gianola, City of Fort Collins
Office: 970/221.6242
Mobile: 970/221.6242
fax: 970/221.6534
e-mail: jgianola@ci.fort-collins.co.us
Developer: City of Fort Collins (Jack Gianola)
Office: 970/221.6242
Mobile: 970/221.6242
fax: 970/221.6534
e-mail: jgianola@ci.fort-collins.co.us
Owner(s): City of Fort Collins (Jack Gianola)
Office: 970/221.6242
Mobile: 970/221.6242
fax: 970/221.6534
e-mail: jgianola@ci.fort-collins.co.us
Architect: Bob West, Oz Architecture
Office: 303/449.8900
e-mail: bwest@ozarch.com
Planner: BHA, Roger Sherman
Office: 970/223.7577
Fax: 970/223.1827
Civil Engineer: Mike Carr, Sear -Brown Group
Office: 970/482.5922
fax: 970/482.6368
e-mail: michael.carr@searbrown.com
General Contractor:
Neenan, Inc., Bob Meserve
Mobile:970/495.6319
Fax: 970/493.5869
Email: rdm@ftc.neenan.com
0)
Outside Contact Persons:
U.S. West Lynn Spencer, 3351 Eastbrook Drive, 2"d Floor West, Fort
Collins, CO 80525
970/377.6408
TCI of Fort Collins Dennis Greenwalt, 1201 University Avenue, Fort Collins,
CO 80521
970/226.3104
Public Service Company Jim Slagle, 1901 East Horsetooth Road, Fort Collins, CO
80525
970/225.7843
Poudre Fire Authority Ron Gonzales, 102 Remington Street, Fort Collins, CO
80524
970/221.6570
3