Loading...
HomeMy WebLinkAboutBLOCK 32 LOTS 1-20 215 NORTH MASON STREET CIVIC CENTER OFFICE BUILDING - Filed DCP-DEV. CONSTRUCTION PERMIT - 2003-07-07Transportation Services Ln,lincering, P42partment -A 6 City of Fort Collins DEVELOPMENT CONSTRUCTION PERMIT Permit Number: 00-14 Issuance Date: Project Name: Civic Center Office Building Project Location: Northwest Corner of Laporte Avenue and Mason Street Permittee: City of Fort Collins; Jack Gianola City and developer contacts: See attached Exhibit "A "for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee (paid at the time of application) $(na) Construction Inspection Fee (paid prior to issuance of this permit) na Total $(na) Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $(NA) Form of security deposited with the City: (NA) PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Geotechnical Engineer shall be responsible to perform material testing and other tests as required; the Project Engineer shall, as required by the City in the development agreement, certify that the improvements are constructed in accordance with the approved Utility Plans and the standards and specifications of the City; shall revise and secure City approval of all revisions to the utility plans and related documents; and shall prepare and submit to the City "as -constructed" plans prior to the City's acceptance of "the constructed" public improvements. 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. 3. Construction tnne restrictions: Normal Construction Hours Y�O •Fort Collin", CC) 0722 0�80 • (97Oj 221-6605 • FAX (970) 221-6378 h vvw.ci.fort-c0 1hn,,.co.0 Development Construction Permit, Page 2 4. The applicant understands that additional permits may be required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, Whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancies will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D)of the Land Use Code or Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. Not withstanding the foregoing, it is agreed that the public infrastructure improvements shall be completed prior to issuance of the certificate of occupancy for the Office Building. The preceding statement shall take the place of the development agreement. 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City ; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans and the "as -constructed" plans have been received and accepted by the City. 9. The City Erosion Control Inspector must be notified at least twenty four (24) hours prior to any planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. Development Construction Permit, Page 3 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: It is understood that there is not a development agreement for this project. Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon. the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. L. Applicant/Project Manager's Signature:. - �" Date: Approval for issuance: City Engineer Approval: / �r Ct �� Date: (Permit Issuance Date) EXHIBIT "A" DEVELOPMENT PROJECT CONTACT PERSONS Project Name: Civic Center Office Building City Staff Contact Persons: Development Engineer: Mark McCallum, City of Fort Collins, 281 N. College Avenue, Fort Collins, CO 80522 970/221.6605 ext. 7656 Construction Inspector: Craig Farver, City of Fort Collins, 281 N. College Avenue, Fort Collins, CO 80522 Office: 970/221.6605 ext. 7294 Mobile: 970/222.0854 Current Planner: Troy Jones, City of Fort Collins, 281 N. College Avenue, Fort Collins, CO 80522 9701221.6750 ext. 6256 Water Utilities Engineer: Roger Buffington, 700 Wood Street, Fort Collins, CO 80521 970/221.6854 Stormwater Engineer: Jay Barber, 700 Wood Street, City of Fort Collins, CO 80521 970/221.6063 Erosion Control Inspector: Bob Zakely, 700 Wood Street, City of Fort Collins, CO 80521 970/221.6063 Natural Resources: Kim Kreimeyer, City of Fort Collins, 281 N. College Avenue, Fort Collins, CO 80522 970/221.6750 ext. 6641 Traffic Operations: Ward Stanford, 700 Wood Street, City of Fort Collins, CO 80521 970/221.6820 Street closures: N/A Transportation Planning: Kathleen Reavis, 210 East Olive Street, City of Fort Collins, CO 80524 970/224.6140 1 Forestry: Tim Buchanan, City of Fort Collins, 281 N. College Avenue, Fort Collins, CO 80522 970/221.6361 Light and Power: Doug Martine, 700 Wood Street, City of Fort Collins, CO 80521 970/224.6152 Developer's Contact Persons: Project Manager: Jack Gianola, City of Fort Collins Office: 970/221.6242 Mobile: 970/221.6242 fax: 970/221.6534 e-mail: jgianola@ci.fort-collins.co.us Developer: City of Fort Collins (Jack Gianola) Office: 970/221.6242 Mobile: 970/221.6242 fax: 970/221.6534 e-mail: jgianola@ci.fort-collins.co.us Owner(s): City of Fort Collins (Jack Gianola) Office: 970/221.6242 Mobile: 970/221.6242 fax: 970/221.6534 e-mail: jgianola@ci.fort-collins.co.us Architect: Bob West, Oz Architecture Office: 303/449.8900 e-mail: bwest@ozarch.com Planner: BHA, Roger Sherman Office: 970/223.7577 Fax: 970/223.1827 Civil Engineer: Mike Carr, Sear -Brown Group Office: 970/482.5922 fax: 970/482.6368 e-mail: michael.carr@searbrown.com General Contractor: Neenan, Inc., Bob Meserve Mobile:970/495.6319 Fax: 970/493.5869 Email: rdm@ftc.neenan.com 0) Outside Contact Persons: U.S. West Lynn Spencer, 3351 Eastbrook Drive, 2"d Floor West, Fort Collins, CO 80525 970/377.6408 TCI of Fort Collins Dennis Greenwalt, 1201 University Avenue, Fort Collins, CO 80521 970/226.3104 Public Service Company Jim Slagle, 1901 East Horsetooth Road, Fort Collins, CO 80525 970/225.7843 Poudre Fire Authority Ron Gonzales, 102 Remington Street, Fort Collins, CO 80524 970/221.6570 3