HomeMy WebLinkAboutCIMARRON PLAZA PUD - Filed GC-GENERAL CORRESPONDENCE - 2003-07-07Cimarron Plaza
Preliminary Plan
I. Consistency with Land Use Policies
Policy 3 - The City shall promote:
a. Maximum utilization of land within the city;
C. The development of an efficient mass transit system
to serve all city residents, and expanded to serve
all urban growth area residents, provided it is cost
effective.
Explanation - The site is strategically located at the south-
west corner of Shields Street and Drake Road, within the
central portion of the developed area of Fort Collins. A
transit stop exists on Drake Road, directly across from the
site. The proposed Business Service Use would make use of
the transit system and in so doinc; improve the efficiency
of the system.
Policy 26 - Availability of existing services shall be
used as a criteria in determining the location of higher
intensity areas in the City.
Explanation - The property is well served with water and
sanitary sewer utilities; a transit stop is directly across
the street on Drake Road.
Policy 46 - Conservation of resources and energy shall be
addressed by land use, site planning, and design criteria.
Explanation - A service station at the proposed location
would serve to reduce the number of vehicular trips to
College Avenue and, therefore, conserve energy.
Polic_y_63 - Neighborhood service centers should locate
within walking distance of existing or planned residential
areas.
Explanation - While the proposed project is a Business Service
Use, not a Neighborhood Service Center_ as per the Guidance
System, the importance of being within walking distance of
existing or planned residential areas should still. apply.
The project is bordered on the west and south by the
Cimarron West P.U.D., as yet undeveloped, and the developed
Cimarron Square P.U.D. to the east.
Policy 67 - Only neighborhood scale service centers will
be allowed in residential neighborhoods.
�1
n
� ., .,_o . / .?�` �,,: '�`is• tar' "'"` �' ¢ ,
NFS
30
ic
r r TT
BUSINESS'
,
_
_
- - - _ - INE %
SERVICE
8000, sf
TJ' BUSINESS SERVICES 2 story
8000 st 2 story -
s
- tract B
--- r PROF. ,..
RI �c l FEiC
4000 st
t 2 story
CIMARON WEST P.U.D. = ,
R P-
ract
_ ,�AttyTREE DRIVE
f -v
Cimarron Plaza P.U.D.
Planning Objectives
August 6, 1985
Located on the southwest corner of Shields Street and Drake Road, two
arterial streets, south of Raintree Shopping Center, east of Cimarron
West Apartments and west of Cimarron Apartments. Opposing the project
to the northeast is the proposed Center for Advanced Technology, a
mixed use business and research development.
Cimarron Plaza P.U.D. is proposed to be a mixed use project containing
approximately 34,000 square feet of neighborhood convenience shopping, a
4,000 square foot fast food restaurant and 12,000 square feet of office
uses. Also included in the project will be a covered gas service service
area. The project is located contiguous to a neighborhood shopping center,
an emerging community/regional shopping center and industrial/business park
that will employ significantly more than 100 employees. The corner of
Shields Street and Drake Road will be well landscaped, providing a corner
that will join the existing two developed corners to the north and east of
the site in creating an open space node at this intersection. Buildings
will be substantially set back from the intersection. The interior of the
site will be delineated by a private, well landscaped, vehicular circula-
tion drive that will be limited to 15 m.p.h., and provide internal access
to three distinct zones of activity:
1. The north parking area containing a fast food restaurant with
drive up window and an office complex.
2. The central parking area that will service the majority of the
retail activities.
3. The south parking area serving a convenience retail store and
related gas service area.
The center will be low in scale, coordinated in character and materials and
present a well landscaped appearance to adjacent development and rights -of -
way. The materials will be primarily masonry, glass in metal frames and
metal canopys. The roof equipment and trash areas will be screened from
view of adjacent streets, and the lighting will be located to screen direct
glare into adjacent residences.
We would estimate that the center would employ or provide office space for
130 full time employees and 50 part time employees.
Cimarron Plaza PUD
Planning Objectives
Page Two
Fort Collins Land Use Policies will be achieved by the proposed Master Plan
in several categories:
3a Maximum utilization of land within City
3b Alternative transportation modes
3d Location of residential development close to employment, shopping
14 Urban development standards
15 Consistency with urban development policies
19 Impact assessment system
20 Interelationships between land uses
21 Access to South College Ave.
22 Contiguous development
23-30 Services
49 Minimize use of private automobiles
50 Mass transit used as a tool
63 Location of neighborhood center
64 Pedestrian and bike access
65 Services to neighborhood center
66 Located at intersection of collector and arterial street
67 Neighborhood scale retail in residential areas
The project will contain three phases within a five (5) year time frame.
The initial phase will be 34,000 square feet of retail, the second phase
will be 4,000 square feet of fast food restaurant and the third phase
will be 12,000 square feet of office space.
The plananing objectives of this project can be summarized as the intro-
duction or a mixed use project located adjacent to a neighborhood shopping
center and at the center of an emerging community/regional shopping area,
well scaled for its location and considerate of the existing urban fabric
of the city.
CITY OF FORT COLLINS
PARKS & RECREATION
TO: Joe Frank, Acting Planning Director
FROM: Virgil Taylor, Superintendent of Parks i ✓
DATE: October 17, 1985
RE: Drake & Shields Medians at Cimarron Plaza
The Parks Department would like to see the following three items addressed
in reference 'to comments made by Tim Buchanan with regards to the two
landscape medians referred to above:
1. Splash blocks should be exposed aggregate for ease of cleaning.
2. The lawn area should be flat or slightly crowned in the middle.
3. The street oversizing fund should pick up the cost of maintenance
for a two-year period to be undertaken by the developer or the
installing contractor. The City would then assume responsiblity
after that time.
If you have any questions, please contact me at Ext. 6660.
sr
PARKS PLANNIN_
OPEN SPACE
1 i : Bryan o Fort Collins, Coiorado 80521 • (303)221-6660
RINC
Engineering Consultants
October 21, 1985
Mr. Tom Gathmann
City of Fort Collins
P.O. Box 580
Fort Collins, Colorado 80522
RE: CIMARRON PLAZA P.U.D.
ADDENDUM TO FINAL DRAINAGE REPORT
Dear Tom:
This letter is in response to your concerns regarding the
temporary detention phasing on the Cimarron Plaza P.U.D. The
proposed temporary detention effects only the northeast parking
area, ;which is clarified on the construction plans. In this area
the parking will be graded and left at the subgrade elevation,
with the area inlet adjusted to the temporary grade. This area
will be sodded or seeded to prevent erosion. In the final phase
the area will be paved and the inlet grate elevation adjusted to
meet the final design elevation.
I trust this clarifies the design approach taken.
Very truly yours,
RBD, Inc.
Stan A. Myers, P.E.
7Z��
RINC
Engineering Consultants
2900 South College A-Y,enue
Fort Collins, Colorado 80525
303/226-4955
May 6, 1988
Mr. Bob Smith
City of Fort Collins Storm Water Utility
P.O. Box 580
Fort Collins, Colorado 80522
RE: CIMARRON PLAZA P.U.D.
FINAL DRAINAGE REPORT REVISIONS
Dear Bob:
Based upon some revisions to the Building E location in the
Cimarron Plaza P.U.D. we have evaluated the impact on the
original drainage report dated September 5, 1985. The changes
are within Basin A which has a detention volume of 35953 cubic
feet and a release rate Qf 1.08 cfs. The site plan changes will
not have any, appreciable impact on the drainage/detention system
as outlined in the original drainage report.
If you have any questions on this project, please contact us.
Sincerely,
RBD, %c.
Ted A. Borstad, P.E.
%I ��,�x.tc� _I��CJcF�-�/� "7? ..,/c� 1�:c�*?1'� ���,/��•tiL /"�,�....1�4i..;�t. ,
ZL
i/` %fin` � ����i � ��ti� �.�1��•�'G' .f.C��� G� /.�L c"�/`�l„'�z.f : i`�7f�ET�rf
GL c L Ti /W1"
Other Offices: Vail, Colorado 303/476-6340 • Colorado Springs, Colorado 303/574-3504
RINC
Engineering Consultants
2900 South College Avenue
Fort Collins, Colorado 80525
(303) 226-4955
February 8, 1990
Mr. Glen Schlueter
Storm Drainage Department
City of Fort Collins
P.O. Box 580
Fort Collins, Colorado 80522
RE: CIMMARRON PLAZA P.U.D. - DRIVE THRU ALONG GIANT VIDEO
Dear Glen,
7
As per your request, further investigation into the stormwater
analysis of the addition of the Giant Video drive thru has been
completed.
In our preliminary calculations between the !--test drainage and ,f
grading; drawing and the original drawing (used for the Drainage �ry report), an approximate three present (3%) increase in impervious
f area WeLS calculated. Further analysis of the hydrologic effects \
t!�^Y �, of the increase in impervious area was compared to results in the �N
i drainage report. Assuming that the basin characteristics were
the same, except for the runoff coefficient "C" - 0.85 for the
( �y� origin-- analysis an �J.875 for the latest analysis (a 3% I
u� increase) and using the computer method, approved by the City to,) �}
.r computE: the runoff and storage volume required, the results U
presented no changes, as shown in the table below and in the at -
A - t hed calculation sheets.
Subbasin A � [ Percent Peak Historic Required
Area Impervious Runoff Detention
iginal Report 3.82 ac 0.85 1.08 cfs 32,953 cf"
Current. Calcs. 3.82 ac 0.875 1.08 cfs 32,953 cf}.
" assuming same
basin charact .
City criteria is to use for this type of land
l development, however, we increased this value to see the affect.
Other Offices: �Cr�76 6346 : ora o pring o orad 598-4107 • Long ont, Colorado (363) 678-9584
In concluding, the addition of the drive thru and revisions up to
now have not increased the runoff or storage volume from the
original drainage report analyses. If you have any questions or
concerns, don't hesitate to contact me or Tom Ochwat.
Very truly yours,
RBD, Inc.
Ted Borstad P.E.
Project Manager
AOIN
Tom Ochwat
Project Engineer
enc.
cc: Fred Croci, Arrowstone w/enc
HPDesk Local Print for Virgil TAYLOR
Start of Item 9.
Message. Dated: 08/17/94 at 1025.
Subiect: Medians
Sender: Linda GULA / CFC/01 Contents: 2.
TO: Virgil TAYLOR / CFC52/01
Part 1.
TO: DISTRIBUTION
Part 2.
Chris Kneeland has concerns about the medians at Drake and Shields.
Thev are in bad sbaoe and have been for Quite some time. There are
lots of weeds and thev have not been mowed. What is the Citv's
responsibility?
Also, it seems like median maintenance is not consistent around
Fort Collins. Some medians are much better maintained than others.
Whv is that?
Please send a resoonse to "auestions.1'
Thanks.
la
End of Item 9.
page 2
Explanation - Although at the intersection of two arterial
streets, the proposed commercial use is ,Jithin a residential
area and has been designed to assure design and land use
compatibility.
II. Ownersh_p Intentions
The principle user on this approximately 5.6 acre site
will be a Royal Service Station. The property is presently
under contract for purchase by a partnership intending to
construct the Station. Approximately the north half of
the property is all the land area required for the Station.
At present, the partnership has no :intentions of developing
any uses within the P.U.D. other than the Station.
The area containing a *proposed 4,000 s.f. office building is presently part of the Cimarron West P.U.D. owned by
T.D. Murphy. Mr. Murphy and the architect representatives
for the partnership have thoroughly discussed the subject.
P.U.D., its design relationships with Cimarron West, and
the eventual land exchanges that will occur upon City
approval of the Cimarron Plaza P.U.D. Preliminary Plan.
Mr. Murphy is in general agreement with the plan as ?proposed.
fie concurs with the inclusion of a portion of his property
into the P.U.D. and its office land use. Upon City approval
of this P.U.D., Mr. Murphy intends to undertake an amendment
to the approved Cimarron West P.U.D. Final Plan which shall
be submitted to the City concurrent with the Final Plan for
the Cimarron Plaza P.U.D.. The Final Plan for this later
P.U.D. will most likely include only the north portion of
the property containing the Service Station use.
Should the partnership sell the central portion of
the P.U.D. containing the three Business Service uses, then
that area would be submitted along with the sinc;le-building
location on the Murphy property as a Final Plan. Should
the owner of this single -building area wish to deve.lon prior
to t-he central area and should the owner of the central_
area not: wish to participate in a Final Plan, then the
single -building area might. comprise a Final Plan submission
in itself. In either case the unity of the P.U.D. and tie
phasing of improvements would meet City standards and
requirements.
No public open space is included in the P.U.D.. Private
open spaces areas in the Service Station First Phase would
be maintained by the property owner. Should individual_
building envelopes be sold in the central_ portion phase,
then a building owners association would be established
to own these private, common areas and to assure their
maintenance.
FROM: Vira:i ' TAYLOR / CFC52 /01
TO: DISTR � JTA JN
Part 2.
Council member h:necland still has a auestions reaardina the raaaed loodina
medians at the corner of Shield,"`rake.
Answer:
talked to Rich Kopp of streets dent. this mornina and he is aoina to con-
tract with an outside aaencv to mow the medians and bill the owner at
Cimarron plaza. This is a short term solution but mavbe it will get the
owners attention. It some one in Plannina or Enaineerina has a lona term
solution about how this can be solved without the city just taking over the
resvonsibi.lity for these medians, for this private development, we are open
to suaaestions.
Thanks,
Virail
End of Item 23.
Intrav >
Send Read Print Reply 305 10 Delete Coov Suspend Other
Message Next IT IT N S IT IT Areas
(�'y cat P'4g2 (4 l X1
cam% , c C "A+V �`'`'L' k"' 41frx
Fw�
HPDesk Local Print for Gary DIEDE
Start of Item 51.
Message. Dated: 09/26/94 at 1754.
Subject: Medians
Sender: Paul ECKMAN / CFC/01 Contents: 6.
TO: Gary DIEDE / CFC52/01
Part 1.
TO: Gary DIEDE / CFC52/01
Part 2.
Gary, I think I talked to you about this medians issue. were you going to
check with Mike H.and get back to me? I forgot how we left this, but I do
need to report to Steve. Do you have anything for me? See the attached
thing from Steve/Virg Taylor. Thanks. Paul.
Part 3.
TO: Paul ECKMAN / CFC/01
Part 4.
Paul, more on the median issue... If the situation is that the City owns the
medians, but some private party, as a condition of development approval, has
agreed to maintain them, don't we have a mechanism for enforcing that
obligation?
Part 5.
FROM: Virgil TAYLOR / CFC52/01
TO: DISTRIBUTION
Part 6.
Council member Kneeland still has a questions regarding the ragged looding
medians at the corner of Shields/Drake.
Answer:
I talked to Rich Kopp of streets dept. this morning and he is going to con-
tract with an outside agency to mow the medians and bill the owner at
Cimarron plaza. This is a short term solution but maybe it will get the
owners attention. If some one in Planning or Engineering has a long term
solution about how this can be solved without the city just taking over the
responsibility for these medians, for this private development, we are open
to suggestions.
Thanks,
Virgil
End of Item 51.
page 3
III. Estimate of Number of Employees
The Service Station will require not more than 2 employees.
Assuming that one of the three 8,000 s.f. buildings in the
center area is a restaurant, one retail, and one office
along with the 4,000 s.f. building closest to Raintree Drive,
then the P.U.D. would generate from 65 to 80 employees.
IIowever, the applicant is not committing to this mix of
uses but only projecting this for illustrative purposes.
IV. Rationale Behind Assumptions and Choices
The site design for Cimarron Plaza was largely determined
by the following factors:
A. The principle user is the Royal Service Station, which
includes self-service gas pumps and a small_ neighborhood
convenience retail area. The Station requires corner
visibility and direct access.
B. The remainder of the property, less the one -building
location closest to Raintree Drive, lies between the
intending Station location and the Cimarron West: P.TJ.D..
It was logical to include the land comprising this
one --building location, currently part of the Cimarron
West P.U.D. , as part of the Cimarron plaza P . ti . D . , in
that an access point to the corner will he, Raintree
Drive and a land use change from residential to
commercial would provide a better land use transition.
C. In order to promote better land use efficiency and
good exposure from Shields Street, the two central
bui-Idings are clustered around a patio area.
D. Major attention needed to be given to buffering the
commercial uses from the intersection and neighborinq
proposed and existing residential uses.
E. Access will be from Raintree Drive, approved but not.
installed along Shields Street, and from the intro-
duction of a new curbcut wi.tha dividing landscaped island
along Drake Road.
V. Avoiding Land Use Conflicts
A. Extensive birming is proposed along Shields Street and
Drake Road in order to soften the visual impact of
commercial uses at the intersection and to encourage
greater compatibility with neighboring uses.
B. A 6 ft. high wooden fence provides a buffer between
the west and southwest edges of the project_ and the
Cimarron West P.U.D.. This buffering is accompanied
by an additional landscape area on the Cimarron West.
page 4
C. The interior of the site plan design includes hir_ming,
virtical landscape areas, and a patterned pavement
plaza and walkway connections between buildings.
IV. Reducing Energy Consumption
Other than the Service Station, the remaining four
Business Service Use buildings will. be designed with energy
use reducing mechanical systems and construction techniques.
The roof designs will include the option for hot water
solar heating. Birms and landscaping on tho north and
east sides of the project will reduce wind .impacts.
Cimarron Plaza P.U.D. Preliminary Plan
Affected Property Owners Within 500 ft.
First Free Methodist Church/The
1516 W . Prospect
Ft. Collins, CO. 80521
Colorado State Research Foundation
Colorado State University
Ft. Collins, CO.
ATTN: Cindy Hansen
Murphy, Thomas D., III
1833 Ramsgate Ct.
Ft. Collins, CO. 80524
Aryan Land & Development Corp.
344 E. Foothills Pkwy, #7E
Ft. Collins, CO. 80525
Sharf, Stephen A./Jerrice A.
931 Driftwood Dr.
Ft. Collins, CO. 80525
Kost, Robert A./Laurel L.
1030 Davidson Dr., #H
Ft. Collins, CO. 80525
Great Plains - Slawson Ventures
PO Box 18387
Wichita, KS,. 67218
Murphy, T.D. Constr. Co., -Inc. (1/2 Int.)
3000 S. College Ave.
Ft. Collins,, CO. 80525
(; l I Y Of I(WI (,O[I INS
ENGINEERING DIVISION
September 17, 1981
P.O. Box 580, Fort Collins, Colorado 80522
JCR Engineering
211 West 14yrtle
Fort Collins, Colorado
Attn: Joe Roesser
Dear Joe:
Ph(303) 484-4220 Ext. 728
dnnn --R45 d1l
Re: Drake and Shields Project
Construction of the Drake and Shields intersection has begun and is
progressing ,according to the schedule I gave you during our meeting
of Auqust 27, 1981. As we discussed at that meeting, the sewer service
line that you are proposing for the development on the southwest corner
of the intersection will have to be installed, by the developer, prior
to the paving of Drake Road. If the installation can not be coordinated
with the City's Drake and Shields Project, the sewer service will not be
allowed in any location which would require cutting the new full depth
asphalt.
As I discussed with you on September 10, 1981 at the project site,
September 18, 1981 may be the latest possible date for the installation
of that sewer line. If you are still planning to install the sewer
service, give me a call and we will try and coordinate the installation
with the project construction.
Respectfully,
Mark E. Sears
Project Manager
Engineering Services
( IIy OI t ORI (()t I INS P.O. Box 580,, Fort Collins, Colorado 80522 Ph1303�484 4220 Ext. 728
ENGINEERING DIVISION
October 19, 1981
Mr. Joe Roesser, P.E.
J.C.R. Engineering
211 West Myrtle
Fort Collins, Colorado
Re: Cimarron Plaza P.U.D. Preliminary
Dear Joe:
I wish to confirm our telephone conversations of Thursday and Friday
of last week: concerning water and sewer services to the proposed
preliminary P.U.D. After field verification of the location of water
and sewer mains in Drake Road, it was determined by our Water & Sewer
Department, that they would be unable to make taps and extend service
lines to your client's property prior to the installation of paving
operations of Drake Road adjacent to the property.
You are advised, therefore, that water and sewer service for the property
must be acquired from easements within the adjoining property to the
south or west as we cannot allow new paving of this magnitude to be cut.
We appreciate your efforts in trying to accomplish these taps prior
to the paving operation.
Sincerely,
F
Maurice E. Rupel, P.E. & L.S.
Assistant City Engineer - Development
cc: Joe Frank, Senior Planner
Webb Jones, Water & Sewer Engineer
John Dengler, Gefroh & Associates
CITY OF FORT COLLINS
PLANI,TING DEPARTM1=
P. 0. BOX 580
FORT COLLINS, COLORADO 80522
ATTN: JOSEPH FRANK
SENIOR PLANNER
PROJECT N•
DEAR JOE:
Gni
GUROH ASSO(IAM1W,-
ARCH ITECTS/PLAN N ERS
555 Howes Street
Suite 100
Fort Collins, CO 80521
(303) 493-1080
RECc IVED
DEC 1-1 1981
Planning
Department
PLEASE FIND ENCLOSED AN A=TATED PRINT OF CIMARRON PLAZA P.U.D. FINAL
SITE PLAN, WHICH DESCRIBES THOSE "AREAS" WHICH ARE OF COMMON CONCERN
TO THE DEVELOPERS OF CIMARRON PLAZA P.U.D. (BLUE 10') AND THE ADJOINING
CIMA UM WEST P.U.D. (T . D . MURPHY CONSTRUCTION CO.).
THIS LETTER DESCR THE BASIS FOR AGRE=?TS BETWEEN THE DEVELOPERS,
AS • •
AREA 1: LANDSCAPING AND SCREENING ALONG S.W. PROPERTY I =, WHICH IS
COMMON WITH CIMARRON WEST P.U.D.
THESE TC) BE INSTALLED AT THE TIME OF CIA'1/1RRON WEST DEVELOPMENT.
THUS, IF CIMARRON WEST P.U.D. IS ALREADY IN DEVELOPMENT', THEN
THE DEVELOPER OF CIMARRON PLAZA P.U.D. WILL CARRY OUT AREA 1,
AS SOON AS THEY START DEVELOP14MT ON ANY OF THEIR TRACTS A, B
OR C. AND, CONVERSELY, IF CD,12� VEST P.U.D. IS NOT INSTALLED
WHEN CIMARRON PLAZA P.U.D. DEVELOPS, THEN AREA 1 WILL NOT NEED
TO BE CARRIED OUT (BY BLUE '01) UNTIL CIMARRON WEST P.U.D.
STAINS DEVELOPMENT.
•- -� i•-,• � �� it ■ • -• r •� r•
THESE WILL BE ON A 50/50 BASIS BETWEEN THE DEVELOPERS OF CIMAR—
RON WEST P.U.D. AND C12,9U ON PLAZA P.U.D. WHICHEVER DEVELOPER
CARRIES OUT THE WORK IN AREA 2, THE OTHER DEVELOPER WILL PAY
BACK 50% COSTS TO HIM AT THE TIME HE PAS WITH HIS DEVELOP—
MENT.
..� •art i• •,• • i� • r 5 r. • S • 1501 • v • rr- •
THIS W-LLL BE ON A "PAYBACK SYSTEM". THUS, IF DEVELOPERS OF
CIIvFRR0N PLAZA P.U.D. CARRY OUT THAT PORTION OF AREA 3, CONTI—
CITY OF FORT COLLINS DECEMBER 10, 1981
ATTN : JOSEPH FRANK PACE TWO
SENIOR PLANNER
GUC)US TO TRACT B, THEY WILL AISO HAVE TO INSTALL THAT PORTION
CONTIGUOUS TO TRACT C, AND RECEIVE A PAYBACK FOR THE COST, FROM
THE DEVELOPER OF CIl N WEST P . U. D . WHEN DEVELOPMENT OF Cr nR-
RON WEST PROCEEDS . AND, CONVERSELY THE DEVELOPERS OF CIlMAE�-
RON WEST P.U.D. CARRY OUT THAT PORTION OF AREA 3, CONTIGUOUS TO
TRACT C, THEY WILL ALSO HAVE TO INSTALL THAT PORTION CONTIGUOUS
TO TRACT B, AND RECEIVE A PAYBACK FOR THE COST FROM THE DEVELOP-
ERS OF CIMARRON PLAZA P.U.D. WHEN THEY PROCEED WITH DEVELOPMENT.
AREA 4: STREET IMPRO�NTS AND UTILITIESS
DEVEI(JP:ER OF CIlA,RRON PLAZA P.U.D. AGREE TO TAKE FULL RESPONSI-
BILITY FOR STREET IMPRoVVEMEgrS AND UTILITIES IN AREA 4. IN THE
EVENT DEVELOPER OF CIMARRON WEST P.U.D. INSTALS THESE ITEMS IN
THE NORMAL DEVELOPMENT OF CIl-V� WEST, DEVELOPER OF CIMARRON
PLAZA WILL REPAY THESE COSTS IMMEDIATELY.
YOURS SINCERELY,
i
'mace