Loading...
HomeMy WebLinkAboutCOUNTRY CLUB CORNERS FIFTH - Filed DCP-DEV. CONSTRUCTION PERMIT - 2003-07-07Development Construction Permit, Page 1/6 DEVELOPMENT CONSTRUCTION PERMIT Permit Number: ? , L Issuance Date: , �'✓`' Project Name: Country Club Corners Fifth Filing Lot 2 Project A.K.A.: _ Poudre Health Services District Project Location: 200 Bristlecone Drive Fort Collins CO 80524 Permittee: Chris Sheafor, Poudre Health Services District City and developer contacts: See attached Exhibit `A "for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee (paid at the time of application) $ 300.00 Construction, Inspection Fee (paid prior to issuance of this permit) $ 2913.20 Total $ 3213.20 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 53,618.69 Form of security deposited with the City: Letter of Credit PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and "Frigineer" shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. ® First National Bank Letter of Credit #3148 City of Fort Collins 300 LaPorte Avenue Ft Collins, Colorado 80521 Dear Sirs: We hereby establish, at the request and for the account of Poudre Health Services District Private Banking Main Office zo5 West Oak Street P.O. Box 578 Fort Collins, CO 80522-0578 970.495.9433 in your favcr as beneficiary, our Irrevocable Letter of Credit NO. 3148 in the amount of Fifty Three Thousand Six Hundred Eighteen and 69/100 Dollars ($53,618.69 as more fully described below), effective immediately and expiring at the close of banking business on December 21, 2002, at our office at 120 Bristlecone Drive, Fort Collins, CO 80524. "this Letter of Credit is intended for the funding required for the Poudre Health Services District 13uildin�_ Development project ("Development Project") for the assurance of the completion of the construction and the maintenance and repair of the public infrastructure in connection with the aforesaid development project and its associated development agreement and development construction permit. Funds under this Letter of Credit are available to you for one or more drawings prior to the close of business on December 21, 2002, against sight drafts in an aggregate cumulative amount not to exceed $53,618.69 , dated the date of presentment, drawn on our office referred to above, referring thereon to the number of this Letter of Credit and accompanied by your written certificate signed by you and the acknowledged as therein provided in the form of Exhibit 1 hereto. I'reSenlatiOn of such draft and certificate shall be made at our office referred to above. L poll the earlier of (i) our honoring your draft(s) totaling $ 53,618.69 in the aggregate presented on or before this Letter of Credit expires pursuant to the terms herein or (ii) the surrender to us by you of this Letter of Credit for cancellation, this Letter of Credit shall automatically temlinate. It is understood that the amount of this Letter of Credit may be reduced as public improvements are constructed and accepted by the City. As components of the infrastructure are satisfactorily completed in accordance with approved utility plans, the value of the completed components may be established from the Development Construction Permit worksheet for determining cost of inlastructure construction and inspection fees, whereupon the amount of this letter of credit may be I educed by the value of the completed component(s), upon execution of a "Request for Amendment to Letter of Credit' in the form attached hereto as exhibit 2. This letter if credit shall be subject to the Uniform Commercial Code as in the State of Colorado, and, to the extent not inconsistent with the terms of this Letter of Credit and the Uniform Commercial code, the Uniform Customs and Practice for a Documentary Credits, 1993 revision, ICC publication number 500. This Letter of Credit will be automatically extended without amendments for one year from the present, and each future, expiration date thereof, carless Issuer deliveries written notice at least sixty (00) clays prior to auy such expiration date to the City of Fort Collins of its intent not to renew this Letter Of' Credit. Anv such notice shalt be in writing and shall be delivered with an acknowledge receipt. either in hand or by certified mail. Any amendments to this Letter of Credit shall be made in the form of Exhibit 2 hereto. The City may at any time request that the Bank amend this Letter of Credit by submitting to the Bank a fully executed certificate in the form of Exhibit 2. The bank may thereafter promptly issue an amendment to the Letter of Credit corresponding to the change of changes requested in such certificate. This Letter of Credit is not transferable. This Letter of Credit sets forth in full our undertaking and such undertaking shall not in any way be modified, amended, amplified or limited by reference to any document, instrument or agreement referred to herein, except only the certificate and draft(s) referred to herein: and any such reference shall not be deemed to incorporate herein by reference any document, instrument or agreement except for such certificate and draft(s). Sincerely, F 1 Shay Eikner Vice President Manager, Private Banking Issuing company name: First National Bank Address: 205 West Oak Street Fort Collins CO 80521 Phone Dumber: (970) 495-9567 EXHIBIT 1 CERTIFICATE The City of Fort Collins hereby certifies as follows with respect to the certain Irrevocable Letter if Credit No. 3148 dated December 21, 2001, established in favor of the City of Fort Collins, ( oloi ado ( the Letter of Credit"): (a) He (She ) is authorized to execute this Certificate of behalf of the City of Fort Collins: (b) The appiican:/developer is in de`ault under the terms of tiie development agreement And/or the development construction permit. (c) The sum of $ 53,618.69 , which is the amount of the draft presented with this Certificate , is the amount currently due to the City of Fort Collins from (d) The amount of the accompanying draft together with all previous draws under the Letter of Credit do not exceed in the aggregate $ 53,618.69 , and (e) the Letter of Credit has not expired. IN WITNESS WHEREOF, the assigned has executed this Certificate of behalf of the City of Fort Collins this day of THE CITY OF FORT COLLINS, COLORADO A Municipal Corporation IN (Title) Development Construction Permit, Page 2/6 3. Construction time restrictions: n/a 4. The applicant understands that additional permits may be required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If constriction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29- 678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and the "as -constructed" plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any Development Construction Permit, Page 3/6 planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: n/a Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. � 1 Applicant/Project Managers Signature:(. ,�Z2-� -- Date: f �Lj 6�� Approval for issuance: City Engineer Approval: C11 V JC Date: ih (Permit Issuance Date) Development Construction Permit, Page 4/6 EXHIBIT "A" DEVELOPMENT PROJECT CONTACT PERSONS Name, address and numbers City Staff Contact Persons: Development Engineer: Katie Moore, 281 N. College Ave., Fort Collins, CO 80522 (970) 221-6605 Construction Inspector: Dan Peterson, 281 N. College Ave., 221-6605 Current Planner: Steve Olt, 281 N. College Ave., 221-6750 Water Utilities Engineer: Roger Buffington 700 Wood Street, Ft Collins, CO 80521 970 221-6854 Stormwater Utilities Engineer: Glen Schlueter 700 Wood Street, Ft Collins, CO 80521 970 221-6065 Erosion Control Inspector: Bob Zackley 700 Wood Street, Ft Collins, CO 80521 970 224-6063 Natural Resources: Doug Moore 281 N. College Ave, 221-6750 Traffic Operations: Eric Bracke 625 Ninth Street, Ft Collins, CO 80524 970 224-6062 Street closures: Syl Mireles 625 Ninth Street, Ft Collins, CO 80524 970 224-6815 Transportation Planning: Kathleen Reavis 215 N. Mason St, Ft Collins, CO 970 224-6104 Development Construction Permit, Page 5/6 Forestry: Tim Buchanan 215 N. Mason St, Ft Collins, CO 970 221-6641 Light and Power: Doug Martine 700 Wood Street, Ft Collins, CO 80521 970 224-6152 Developer' Contact Persons: Project Manager/Owner/ Developer: Chris Sheafor Poudre Health Services District 120 Bristlecone Drive Fort Collins, CO 80524 Office: (970)224-5290 Fax: (970) 221-7165 Csheafor@healthdistrict.org Architect: CCMK Architecture and Planning 318 E. Oak Street Fort Collins, CO 80524-2915 Office (970) 493-1220 Land Planner Project Engineer: Concrete Contractor for Structures: Balloffet-Entranco 345 E. Mountain Ave. Fort Collins, CO 80524 Office (970) 221-3600 Monte Winter Balloffet-Entranco 345 E. Mountain Ave. Fort Collins, CO 80524 Office (970) 221-3600 Fax (970) 221-9933 Info@balloffet.net R.C. Heath R.C. Heath Construction 141 Racquet Drive Fort Collins, CO 80524 Development Construction Permit, Page 6/6 Office (970) 472-5661 Fax (970) 484-7221 Grading/Utility Contractor: Justin Boyd Boone Construction Concrete Contractor For Flat Work: Paving Contractor: Landscape Contractor: PO Box 270262 Office (970) 472-5661 Fax (970) 484-7221 Dale Morrow Morrow Concrete 625 Sherry Drive Office: (970) 472-5100 Mark Stanley Connell Resources 4305 E. Harmony Rd Fort Collins, CO Office (970) 223-3151 Fax (970) 223-3191 Allen Winter A&M Landscaping 2417 E. Mulberry Fort Collins, CO Office (970) 224-5469 Fax (970) 224-1765 ^ o c o o c o c oo�cc�cooc ot �r.;oc,nc0oc H E W O C a�.��00oCo r � 69 Efi 69 ffi '.fi 65 H W CJ' bon 0 �Z8 Cn M M in O O O v O� M M 'fi 69 fR 7 O� f1i b5 s9 � � b9 0 0 0 o c o 0 0 N N 0C 69 � z Q\ M 69 � 69 �.f'i 6S 6F r�9 C c C CD C C C O C 69 64 69 59 M N C 0 0 C 0 C 00 o�ri0000a�000 00 M fA Vl 6R iA V 69 6R 69 69 N �G h EA 69 69 S xxx�xxx C f U U U J U U U N O J p N M V] a a � ) L y 0 C) r v U U U U J 5 'o b '� _ 3 v 3 0 �D0�o 69 4fi 69 O O c O o O M 00 00 00 .-. O O O O O c V)Eo� �09 E�6 r�s C o C 0 o C C coorio�:o ^ N O Vr M � b9 59 SFi b9 0 0 0 0 0 0 0 o�o�ocvo 69 o O, O N �lc 0G J Vl c C O Q r+ M i 5.304 AC. (VACANT) I NEW ASPHALT 2 HANDICAP PAVING SPACES N90'00_00'E 310.67_ — — — I i TTYP. 9.00 9.C10 Typ ( � 20I 8.00' PARKING SPACES 1 1 (9'X20') I w 10 -- g of NEW CURB PROPOSED LOT O O LINE 66.67' O II AND GUTTER, TYP. I I(I 14. 5 „� TRASH I NEW N O ENCLOSURE BIKE RACK _� 3.58' SIDEWALK, TYP. (2 TOTAL) LOT 2 oINSTALL HANDRAIL 3.58POUDRE HEALTH SERVICES �' NR CLE O ALONG RAMP DISTRICT BUILDING PAN O R 9715 S.F. O /111 FF ELEV. a 4979.10I NEW U) I I — 14 75' RETAINING INSTALL HANDRAIL 18 WALL ALONG RAMP �� PARKING 71� I SPACES 66.67' (9'X 19') NEW OUTLET WORKS `1 I' \, 20.00' �,II STRUCTURE SETBACK i ! S89'59'17'W 310.67' NEW EMERGENCY -/ -- SPILLWAY 5-94' 1.5' HIGH EXISTING 5' RETAINING EXISTING LANDSCAPING, TYP. SIDEWALK WALL BRISTLECONE DR. (60' ROW) x 0 20 40 80 SCALE IN 1 " = 40' BA LLO FFET-ENTRAMCi] POUDRE HEALTH SERVICES 345 EAST MOUNTAIN AVENUE SITE PLAN 120 BRISTLECONE DRIVE Fort Colllins, CO 80524 Fort Collins, CO 80524 USA (970) 224-5209 Phone: 970 221-3600 Construction Schedule Country Club Corners, Fifth Filing, Lot 2 Poudre Health Services District The construction time allowed for this project is 210 calendar days. Public infrastructure improvements will begin in December 2001 and will be completed by the end of the project in July 2002.