Loading...
HomeMy WebLinkAboutCENTRE FOR ADVANCED TECHNOLOGY PUD TWENTIETH - Filed DCP-DEV. CONSTRUCTION PERMIT - 2003-07-07�Le Development Construction Permit, Page 1/3 DEVELOPMENT CONSTRUCTION PERMIT Permit Number: 00-04 Project Name: C.A.T. 20" Filing Project A.K.A.: 90 Bed rehab Issuance Date: 'S-%%-00 Project Location: Located at the southwest corner of the Centre Avenue/Worthington Circle intersection Permittee: Bob Wilson, Columbine Health System City and developer contacts: See attached Exhibit "A" for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee (paid at the time of application) $300.00 paid Excavation Permit $1,725.00 Construction Inspection Fee (paid prior to issuance of this permit) $6,024.80 f A i 'jr Total $8,049.80 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 63c�o . oc) Form of security deposited with the City: G►r=cu PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide 11 as -constructed plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. 3. Construction time restrictions: SUBMIT THE FOLLOWING ITEMS (Required for all projects): • 81/2"'xl 1" copy of the Site Plan • Proposed Project Schedule • Project quantities and cost estimate for all of the public improvements to be constructed. In addition, include all private improvements that are required to be inspected by the City Construction Inspectors. This information must be submitted in the format shown on the attached form titled "Project Quantities and Cost Estimate Sheet." ADDITIONAL SUBMITTALS (Required if checked): Cl Traffic control plan(s) for the project ❑ Proposed haul routes shown on a City map Cl Shop drawings ❑ Other CONSTRUCTION COORDINATION MEETING: A construction coordination meeting to discuss plans and special requirements for your project, is required for all development projects. The people required to attend the meeting are the Project Manager, Project Engineer, Developer, Architect/Land Planner and General Contractor (if no General Contractor, representatives for each of the contractors expected to work on this project) People to Attend: List the peoples names and titles for those who will attend the pre - construction meeting: Name Title Ted Davis Owner's Representative Phil Robinson Stewart & Associates - Eng. Jeff Jensen Drahota Construction - PM E ESTIMATED COST OF INFRASTRUCTURE IMPROVEMENTS: Provide the estimated value of all public infrastructure improvements that will be constructed and accepted by the City to own and maintain. In addition provide the value of all private infrastructure improvements that the City will inspect and require certification for. The estimate shall be in the same format as the attached sheet titled "Project Quantities and Cost Estimate Sheet." Public infrastructure, estimated cost: Private infrastructure, estimated cost: S�-00 I certify that the information on this permit application along with the required additional submittals are true and correct to tr:e best of my knowledge, and that in filing this application I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in die real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. Applicant Signature:_W)tJ1C ��%�,GCG� Date: y — 17 — 00 O ID o (O 0 O 0 O 0 O o O O O 0 V' 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 (O 0 N 0 V 0 O 0 O 0 Z LO m O O O O M QO ("i (n O (R O b4 O Efi O UR O M O It O w O w (O O (n O m N m (O N Efi m (f) LO t (si ��•+"�"� J a U W V of V fH (A (» EA eli (N 1 OW R LL a ~ N z w w zo Z ❑ LL z r pU o 0 0 0 00 00 0 0 0 0 0 0 0 0 0 o O o 0 0 o O _ W>= OM O O O O O O O O O O O M W M CO 6 W a a O r O (» O (» e» C6 (» (» (n (» 6 W a UJ Lo Z W d m — Z LL J Q O LLI F- � W V N (") N (n O O O O O c, o0 V O O O O O O O O O O O CDCDO O 00 O O O O Q Q❑ W CO p O CO O NLr) m O O CD O CD O O O O O _ M N lf') N f� I-Lr)lf) �- CO O O CDO V O O p �- F- O F- M m a7 N a0 O O N m O tt V (Dco Q) r CD (A EA O V3 O (ALfi V f� V N (.j O O o0 I� O N CD ul O Lo W 2 EA EA EA EA EA fR O �y dq dT fA Efl LL Z IX Z O O C) Z 7❑ 7 N a0 N O CDO O Cl) O O O V N I� O O O Li O O O O O (p O (f/ 00 O N O O LQ F- N ry �_ co N O m N cN�) M O In M 0 U) Ef3 ul Y) be lfJ U9 be�zq � Z U sv LL O Z U rZ C� ❑ W �... .- a F Z O N (O NI O O V O m m aD O O O O a0 N N CD LQ M V co O O O _ a n r. V LO LO N N F M N W J LLi } U >- U U U LL J LL J LL J M 2 2 2 = 2 2 (n J >- (n LL J LL J LL J LL (n LL V) LL W O j W Q W Q W Q W Q W Q W Q W Q W HN W _ Q Z W W J m Q U J � (n Q FU O Z n 2 c N Z W Q g n in N o c g W a) m d a3 J O m 2 c 3 e 0 a) a) c c E`� 3 CL E O gco U a`0i w o t—E o U W a) -o arcc m c O a m cm r_oo. 2 cn a) a zn a) ma ca) cmc a> y -0 a) a m o w w ai o = ccis a m 2 a) � d U d Qa` F- cn O U W Of D F- U F- F- U LL Z_ J Q F- F- /J I u m g' CD <' m ' r -'--' aw" 0 a s 90 BED REHAB. BUILDING FORT COLLM& OOLORAOO j .Q �0 I �I, v Z O,J e o� Y1( m w a - , d. , a a z s a L ro ro ;. r C2LL O W. - ` Q1 -, V �� O O.,p 00 ao W 3 � I C O; �. 4-1 � .Y 1�9 � e I t7 p 4 aj Qj Q) 4.j L L C � L fo O c E E E -C L = E L y_ ID W V Y • C rL_ • L C: •0 n� j cz C: 0 Q) V m Q) co 0 J co O V N Q 0 0,� 0',0' 0 0 cl' E m m Q uj LU N O N Q L L v v E > N E a i,..�' (IJ, CII w Development Construction Permit, Page 2/3 4. The applicant understands that additional permits may be required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and the "as -constructed" plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. Development Construction Permit, Page 3/3 10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any planned construction on this project. All required perimeter silt fencing and other erosion/sedirrlent control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Manager's Signature: Approval for issuance: Date: 5 L3 I Lo City Engineer Approval: Cam' V C �-<r� Date: '03'16 D (Permit Issuance Date) EXHIBIT "A" DEVELOPMENT PROJECT CONTACT PERSONS PROJECT NAME: Centre For Advanced Technology, 20th Filing — Columbine 90 Bed Rehabilitation CITY STAFF CONTACT PERSONS: DEVELOPMENT ENGINEER: Tim Blandford, City of Fort Collins, 281 N. College Avenue, Fort Collins, CO 80522 970/221.6605 ext. 7128 CONSTRUCTION INSPECTOR: Wayne Lenard, City of Fort Collins, 281 N. College Avenue, Fort Collins, CO 80522 970/222.6824 CURRENT PLANNER: Steve Olt, City of Fort Collins, 281 N. College Avenue, Fort Collins, CO 80522 970/221.6750 ext. 6341 WATER UTILITIES ENGINEER: Roger Buffington, 700 Wood Street, Fort Collins, CO 80521 970/221.6854 STORMWATER ENGINEER: Jay Barber, 700 Wood Street, City of Fort Collins, CO 80521 970/221.6063 EROSION CONTROL INSPECTOR: Bob Zakely, 700 Wood Street, City of Fort Collins, CO 80521 970/221.6063 NATURAL RESOURCES: Kim Kreimeyer, City of Fort Collins, 281 N. College Avenue, Fort Collins, CO 80522 970/221.6750 ext. 6641 TRAFFIC OPERATIONS: Ward Stanford, 700 Wood Street, City of Fort Collins, CO 80521 970/221.6820 STREET CLOSURES: N/A TRANSPORTATION PLANNING: Kathleen Reavis, 210 East Olive Street, City of Fort Collins, CO 80524 970/224.6140 1 FORESTRY: Tim Buchanan, City of Fort Collins, 281 N. College Avenue, Fort Collins, CO 80522 970/221.6361 LIGHT AND POWER: Doug Martine, 700 Wood Street, City of Fort Collins, CO 80521 970/224.6152 DEVELOPER'S CONTACT PERSONS: PROJECT MANAGER: Bob Wilson, Columbine Health System, 947 Worthington Circle, Fort Collins, CO 80526 Office: 970/482.0198 fax: 970/482.9148 DEVELOPER: Bob Wilson, Columbine Health System, 947 Worthington Circle, Fort Collins, CO 80526 Office: 970/482.0198 fax: 970/482.9148 OWNER(S): Columbine Health System, 947 Worthington Circle, Fort Collins, CO 80526 Office: 970/482.0198 fax: 970/482.9148 ARCH ITECTlPLAN NER: n/a PROJECT ENGINEER: Phil Robinson PE, Stewart & Associates, 103 South Meldrum, Fort Collins, CO 80521 Office: 970/482.9331 fax: 970/482.9382 GENERAL CONTRACTOR: Drahota Construction Co., P.O. Box 272269, Fort Collins, CO 80525 Office: 970/204.0100 Fax: 970/204.0200 GRADING CONTRACTOR: n/a UTILITY CONTRACTOR: n/a CONCRETE CONTRACTOR (for flat work): n/a CONCRETE CONTRACTOR (For Structures): n/a PAVING CONTRACTOR: n/a LANDSCAPE CONTRACTOR: n/a K OUTSIDE CONTACT PERSONS: U.S. WEST: Joyce Takamoto, 124 W. Magnolia, Fort Collins, CO 80521 970/224.7473 AT&T CABLE SERVICES: Dennis Greenwalt, 1201 University Avenue, Fort Collins, CO 80521 9701226.3104 PUBLIC SERVICE COMPANY: Jim Slagle, 1901 East Horsetooth Road, Fort Collins, CO 80525 970/225.7843 POUDRE FIRE AUTHORITY: Ron Gonzales, 102 Remington Street, Fort Collins, CO 80524 970/221.6570 DEVELOPMENT CONSTRUCTION PERMIT APPLICATION (1/7/99) For City use only: Application Number: A011-oo Application Date: zs/Z3/,no Permit application fee: $ 8004:�� INSTRUCTIONS: 1. Complete this form (some questions may not apply to you) and attach all necessary documents and submit to the Development Engineering Section of the City. 2. If you. have any questions contact the Development Engineer 'rim Blanford at 221.-6750. 3. Submit the Application and pay the Application } ee at the fee at the Engineering counter at 281 No. College Avenue. PROJECT INFORMATION: Project Name (as approved by the City): lumbine 90 Bed Rehabilitation Project A.K.A. (Marketing name if different from Project Name): A Project Location: Corner of Worthington and Centre Avenue Fort Collins, CO 80526 Property Owner(At the time of this permit issuance):. Name: Columbine Health System Address: _ 947 Worthington Circle Phone number(s): Office: (970) 482-0198 Cellphone: Fax number:(970) 482-9148 Email: Applicant/Project Manager (The primary contact person for all matters regarding this project, and the person responsible for all matters referencing "the Developer" in the Development Agreement for this project): Name: Bob Wilson Address : _ 947 Worthington Circle Phone number(s): Office: (970) 482-0198 Cellphone: Fax number: (970) 482-9148 Email: Project Engineer (A Colorado licensed professional engineer who is the civil engineer the person responsible for the design of this project, responsible for certification that improvements are constructed in accordance with approved plans, responsible for making revisions to plans with City approval and for providing as -constructed plans): Name: Stewart & Associates Address: 103 South Meldrum, Fort Collins, CO Phone number(s): Office: (970) 482-9331 Cellphone: Fax number: (970) 482-9382 Email: Professional I:icense Number: 4502 Developer (The party or parties referenced in the Development Agreement who are responsible for the Developer's obligaticns contained in the Agreement —add additional names below): Name: Bob Wilson Address: _ 947 Worthington Circle, Fort Collins, CO Phone number(s): Office: (970) 482-0198 Cellphone: Fax number: (970) 482-9148 Email: General Contractor (The contractor in overall charge of the public infrastructure construction): Name Drahota Construction Co. Address: _ P.O. Box 272269, Fort Collins, CO Phone number(s): Office: (970) 204-0100 Cellphone: Fax number: (970) 204-0200 Email: If you have no General Contractor, list all other contractors below. Grading contractor: Name: Address: _ Phone number(s): Office: Cellphone: _ Fax number: Email: Utility contractor: 2 Name: Address: _ Phone number(s): Office: Cellphone: _ Fax number: Email: Concrete contractor for flat work: Name: Address: _ Phone number(s): Office: Cellphone: Fax number: Email: Concrete contractor for structures: Name: Address: _ Phone number(s): Office: Cellphone: Fax number: Email: Paving contractor: Name: Address: _ Phone number(s): Office: Cellphone: _ Fax number: Email: Landscape contractor: Name: Address: _ Phone number(s): Office: Cellphone: _ Fax number: Email: Other contractors and parties involved in the project: