Loading...
HomeMy WebLinkAboutCACHE LA POUDRE INDUSTRIAL PARK PUD - Filed GC-GENERAL CORRESPONDENCE - 2003-07-07urban design, inc. TIMBERLINE LAKES PUD Statement of Planning Objectives December 20, 1996 Timberline Lakes is a logical extension of the existing Prospect East/Seven Lakes Industrial/Employment District that has evolved in the Timberline Road/Prospect Road area. This unique business park is anticipated as the location for basic employment uses including office, research and development, corporate headquarters, and potentially light manufacturing. A variety of complementary uses such as business services, convenience retail, restaurants, and possibly residential uses may be included as well. Timberline Lakes is planned to comprise up to 900,000 sq. ft. (2,OOOto 3,600 employees) in a mixed use activity center that is highly accessible by several modes of transportation, and includes both "urban" waterfront areas and natural open space with appropriate landscape transitions between these two distinct environments. The subject property is an example of an existing, underutilized industrial area that can provide the opportunity for mixed use development, revitalization, and economic growth, while improving upon its unique and positive qualities. Community Context. The two dorninate "threads" in the urban fabric of the area including Timberline Lakes are: (1 ) Timberline Road - a distinctly urban element; and (2) the Poudre River riparian corridor - a distinctly natural element. It is appropriate that this site be designed around the concept of combining these elements in a pleasant, compatible manner. The buildings and other site plan elements are oriented in a way that is consistent with the established "Developed Urban (Business Park) District" character along Prospect Road, while buffering the nearby open space and riparian ecosystem. The resulting plan is intended to help implement the desired mixed - use corridor in which the river and surrounding lands are carefully managed to: (1) protect and enhance a diverse set of public values; and (2) allow appropriate private uses - including cultural, commercial, and business development - within the corridor. The approved Structure Plan - developed as a part of the City Plan process - indicates that an Employment District in this area of the Poudre River Corridor is appropriate. Timberline Lakes is located to provide an even greater open space buffer between the river and the Employment District than the Structure Plan implies. Timberline Lakes is centrally located between downtown, Hewlett Packard/Symbios, the Foothills Fashion Mall, Anheuser Busch, CSU, Poudre Valley Hospital, 1-25, and other community activity centers: All are within four miles - a 10 minute bike ride - of the site. CITY OF FORT COLLINS DEPARTMENT OF NATURAL RESOURCES M E M O R A N D U M G DATE: April 17, 1985 TO . Bonnie Tripoli, Planning FROM: Roger E. Krempel, P.E., Natural Resources Manager RE : Project. #010-005, Cache La Poudre Industrial Park Regarding the subject project arid the letter- dated April 16, I think the responsibility to secure tax exempt status lies with the developer's attorney. Of course, City Attorney's should be alerted to this so they can research the subject and advise us all in order to make expeditious disposition of the request. RK/sb cc: Paul Eckman Sam Mutch Don Yon d I'/,f1 I M f fv i ;f AiUHAI HP UIJMJ—E ® �I'.r , Ut i,1 ;`L' �?? • ,� U�1121 tiGUO CITY OF FORT COLLINS EN(;INE.ERING SERVICES MEMORANDUM DATE: April 23, 1985 TO: 'yarn Mutch, ala.nninq Director FROM: Tom Hays, City Engineerf# RE: Cache La Poudre Industrial Park We understand that the above referenced project is preparing to apply for a Planned Unit Development. Normally, this project would be required to provide off -site street improvements from the Timberline -Prospect Intersection north on Timberline to the project site. However, in this instance the project will initially consist only, of a maintenance building and an office addition In view of this, and also that the property owners are voluntaril`• dedicating the full right of way .within the limits of their project) for the future extension of Timberline Poad, Ne recommend that tree requirement for off -site street improvements be wa.iveC. ENGINEERING SERVICES JUU LdrU1 Uc--- Shiloh, Inc. Technical Consultants April 30, 1985 City of Fort Collins P.O. Box. 580 Fort Collins, Co.:0522 Attn: Mr. Bob Smith Re: Cache La Poudre Industrial Park Dear Bob: This letter is being written in confirmation of our telephone conversation of last week regarding the elimination of that portion of the Chaffee Ditch situated north of Hoffman Mill Road within the Cache La Poudre Industrial Park. Per our discussion, I will inform Mobile Premix, Inc. that they may proceed with the backfilling of this portion of the irrigation ditch. The remainder of the Chaffee Ditch situated south of Hoffman Mill Road within the project will be left intact until resolution of the existing storm drainage proposal which would divert the major basin flows through the existing ponds. Thank you for your assistance in this matter. Sincerely, Richard E. Mattingly Project Manager cc - Mr. John Hickman Mobile Premixt Inc. 211 W. Mvrtle Fort Collins, CO 80521 (303) 482-1557 CITY OF FORT COLLINS STURM WATER UTILITY May 24, 1985 Mr. John Clark Shiloh, Inc. 211 W. Myrtle Ft. Collins, Colorado Re: Design Contract for Cache La Poudre Industrial Park Dear John, As discussed in the meeting at your office today, the City of Fort Collins Stormwater Utility will reimburse the developer of the Cache La Poudre Industrial Park for those design costs associated with the stormwater outfall that will run through the site. We have also agreed to reimburse the developer for the project management and construction costs that are directly associated with this drainage project. The estimated costs with supporting calculations will become part of the Subdivision Agreement for this P.U.D., in the form of "Exhibit B". I will have our legal staff draft an agreement that conveys to the City the right to discharge 400 c.f.s. of stormwater through the Industrial Park:. This should also be executed with the Subdivision Agreement. Yours truly, mn1 zj om Gat mann ivil Er sneer I �1L1(J t )f t.(" AVH • P f 1. HOX -)HC1 1 CITY OF FC PT COLLINS STORM WATER UTILITY Auqust 19, 1985 Mr. John Hickman Mobile Premix, Inc. POB 5183 TA Denver, CO 80217 RE: Drainage Improvements in Cache La Poudre Industrial Park Dear John, After I talked with you this morning on the phone I thought it best to summarize our discussion in a letter and expand or.'scrre additional topics. Most storm drainage improvements within Fort Collins are constructed by private development. This includes both those improvements that address drainage within the development alone as well as large scale improvements that may benefit tin entire drainage basin of many square miles. Those improvements that are identified as part of a 'basin master plan' are eligible for reimbursement: upon completion and approval by the City. The reimbursable items and costs are identified in an attachment to each Development Agreement entitled "Cost Estimate for Major Drainage Imprdvements.' A typical development will go through a planning and engineering review process that includes review and approval of the site plan and associated criteria by the Planning Department with final approval from the Planning and Zoning Board and review of utility plans by appropriate City departments with final utility plan approval by the City Engineer. It is during this process, but before final approval of the Planning and Zoning Board, that Exhibit "8' (drainage repayment estimates) is prepared by the developer's Eyngineer for review by drainage staff. As an attachment to the Development Agreement it is leqally part of that contract between the developer and the City. b f... •.. �,.. •. ^c �. =;r.: �5 ire. a ..-rw.fY.�3+ S+'.;r.FY"+ru STORM WATER UTILI lY IV 300 LaPorte Ave • PO. Box 580 9 Fort Collins, Colorado 80522 • (3031 221-6605 Drainage Improvements, page 2 Cache La Poudre Industrial Park PUD differs significantly from this typical process in that a Development Agreement is being executed without a final set of utility plans. The effect of this deviation, as it applies to drainage improvements, is that since the estimates in Exhibit "B" were not prepared from a :set of final utility plans they are subject to more inaccuracy than usual. The intent of the agreement is not changed: the City will reimburse those actual and direct costs incurred to design and construct the "drainage system" as shown on the final approved utility plans. Please be aware of this when actual construction costs are determined. I would like to emphasi--e the words "reimburse" and "actual costs" in the paragraph above. We will pay Mobile Premix, Inc. after the project, or significant portion thereof is complete and acceptable to the City. Within reasonable limits, we try to make as few individual payments as possible with the goal that only one lump sum payment will be made when all the applicable improvements are completed. Since you stated the construction phase of this project may extent over several years, it will be possible to divide the construction repayment into distinct phases. However, we want to avoid any form of frequent, item by item repayment. The appropriate vehicle for that type of cash flow is a City sponsored and managed capital project — not a development managed project. The phrase "actual costs" as relates to repayment is intended to mean those documented costs that can be shown to apply directly to the portion of the project that is reimbursable. If, for instance you hire an engineer to perform the design work for the drainage improvements, but that engineer also does your site plan, street layout, water and sewer lines, atc. the City will only repay that portion of the fee that can be shown to apply to the drainage design. The same will be true of construction management fees: we will pay for the costs of managing the project, including those you may now be incurring, but we will not pay a flat rate based soley on a percent of the total construction cost. Good documentation of costs thoughout the project is essential. Please note that repayment of actual costs assures Mobile Premix, Inc. that they are not at risk even if the final design and construction of the drainage system increases the costs above those shown in Exhibit "B". Drainage improvements, page 33 Concerning improvements to the west shore and slope of the south-west lake, I believe that the original estimate of $80,000 was too high, and would like to be provided with more detailed information and a "tighter" estimate before it is incorporated in the repayment exhibit. I can understand your viewpoint in seeking benefits from the City in exchange for the discharge easement, but I cannot agree to additional work that represents 40% of the total estimated cost of the project without more information. You mentioned that you have not yet received a copy of the Development Agreement with Exhibit "B", but anticipated its receipt shortly. After you have received and reviewed it please call me so that we can make any final changes that may be needed. Sincerely, Bob Lee Director of Transportation Services OYV1 o Gat a n Ci it En in er I - Drainage cc: Bob Smith Rick Mattingly �11� CgQ o 0 urban design, inc. Land Use The proposed development is consistent with City Land Use Policies which promote: maximum utilization of land within the city; access to alternative transportation modes; locating more intense uses away from South College Avenue; development near transportation facilities; location of employment uses in "less hazardous flood plain classifications; and where urban infrastructure is readily available. In the spirit of Fort Collins current planning efforts, Timberline Lakes strives to achieve a fair and proper balance among the sometimes conflicting urban/economic and natural resources/recreational interests. A concentrated employment center at this location promotes a compact development pattern, and will emphasize the special identity of the Industrial/Employment District in this area. In 1985, (with approval of the Cache la Poudre Industrial Park) the City of Fort Collins deemed this site to be an appropriate location for an activity center with concentrated intensity of development including mid -rise structures, while still respecting the established urban design and form of Fort Collins. When the current overall community planning concepts are considered, that conclusion remains valid. Expansion of the existing Industrial/Employment District in this area, on this unique site, can help to maintain Fort Collins role an a regional economic center. Transportation Modes Timberline Lakes is planned to be easily accessible by automobile, transit, bicycle, or walking. Air and rail service facilities are also nearby. Development of this site will help to establish the Timberline Road extension as a true multi -modal street; with connections to the Spring Creek and Poudre River Trails providing additional, integrated, opportunities for pedestrian and bicycle travel. The pedestrian circulation system accommodates walking from the community to the site and throughout the proposed development safely and conveniently and contributes to the attractiveness of the development. Detached walkways separate pedestrians from vehicles where possible, and provide links to waterfront amenity areas that are both urban and natural in character. Bike parking areas have been planned in areas convenient to each building. The street and parking system are designed to be safe, efficient, convenient, and attractive; and consider use by many modes of transportation. Buildings are located for convenient bike/pedestrian access from the street, while parking facilities are located in less conspicuous locations. Environment Particular attention has been given to the interface of urban development and the nearby (off -site) riparian corridor along the Poudre River and other sensitive areas. Although the on -site ponds have been described by the City's Department of Natural Resources as "...gravel mines that are presently sterile water bodies", they do provide an effective transition between the proposed urban development on the site and the more sensitive open space and habitat areas along the Poudre. urban design, inc. Because the subject property is an active gravel mining area nearing completion, the goal of minimizing the disturbance of topography and water bodies may seem contradictory. In this case, that situation creates the opportunity to plan the necessary disturbance of the topography so that it can be completed in a way that allows the physical elements of the site plan to adapt well to the physical characteristics of the site and surrounding areas. Landscaping on the site is planned to support the functional needs of the project, enhance the aesthetic appearance of the site, provide a visual tie to the Prospect Road Streetscape Program, and integrate with, and buffer the impact of the development upon nearby natural areas. Planting approaches, combined with final grading and urban waterfront improvements are designed to minimize safety hazards that may be associated with the existing ponds. Pedestrian improvements adjacent to buildings provide safe access to the water's edge and direct people away from the unprotected "natural" shore lines. The development areas on this site do not contain known areas of natural or geological hazards. The steep slopes at some shore lines are intended to be mitigated with final grading and landscape installation. Except for ;areas that may be acquired by the City of Fort Collins or other public agencies, landscaped and open space areas are intended to be owned and maintained by the property owners at Timberline Lakes. Building Height & Views Consistent with the previously approved master plans for the site, buildings greater than 40 feet in height are appropriate at this location. The project has been designed to meet the City's objectives with regard to building height in the community. The taller buildings have essentially no impact on existing residential neighborhoods, allow for maximum utilization of the activity center, protect access to sunlight, and provide conscious direction to the urban form of the City through careful placement of the tall buildings on the site. Development Phasing Construction is anticipated to begin in 1998, and is anticipated to be phased on a lot by lot basis. The first phase of development is anticipated to include lots 8 - 11, with subsequent phases proceeding from south to north across the site. This order of phasing may be modified depending on market conditions, and infrastructure improvernent requirements. 3�z ell • Project has been inactive since our comments were sent back 3/3/97. • Major issues had to do with them needing to still connect Hoffman Mill Road through to Timberline Road - their plan did not show this connection; access to Timberline Road conforming to whatever access control plan is in the works for Timberline Road extension; additional traffic study analysis per Traffic Engineering; wetlands and stormwater issues. • Have heard rumors that the property (all or a portion) is being considered for Natural Areas acquisition. That's all I know!!! CACHE La.POUDRE INDUSTRIAL PARK - LAND USES AND PLANNING OBJECTIVES Tract "A" Lot #1 P.U.D. PLANNING OBJECTIVES Land Use Policies: Currently, the subject property is zoned IG, General Industrial. Consistant with this and the accompaning master plan, land use is planned to be industrial. Existing and proposed transportation corridors also indicate the proposed use is appropriate. Open Space Ownership: All open spaces on Lot #1 Tract "A" will be privately owned and maintained. A landowners association will be formed to develop and maintain all open spaces not contained within this or other described lots. Ownership transfer of common open spaces will occur after 75% of all future lots are sold and developed. Estimated Employment: Employment for Lot #1 Tract "A" development could range from 100 to 150. Actual employment will be adjusted subject to the end use of the future structures. Rational for P.U.D.: The owners intent is to apply long range planning to potential use of Lot #1 Tract "A". This planning is consistant with the master plan goals and objectives. Immediate needs for improvements on Lot #1 are for a free standing maintenance facility to support continuing mineral extraction operations. The maintenance facility (Phase I) will be designed for future incorporation into an expanded structure illustrated as the building envelope. The envelope also encompasses current on -site existing structures. The P.U.D. allows the owners to expand current needs within the envelope while having planning guidelines for the ultimately total structures. Land Use Conflicts: No land use conflicts exist between Lot #1 Tract "A" and the master plan. Futhermore, land use is also compatible with current land uses of adjoining properties. Energy Issues: Long range development of Lot #1 Tract "A" incorporates several elements proven to reduce energy consumption. Building orientation provides for passive solar heating. Earth berming on north and west sides will contribute to temperature moderation. Landscape screening will reduce climatic impacts. Natural daylighting from roof monitors will reduce lighting demands and also assist interior temperature control.. Ground water will be utilized to meet cooling requirements. Efficient use of the noted elements could reduce building energy demand by 70'/. CACHE LaPOUDRE INDUSTRIAL PARK - TRAFFIC IMPACT ANALYSIS Lot #1 Tract "A" P.U.D. Reference: Refer to attached analysis prepared for master plan of which this lot is a part. Traffic Volumn: Traffic volumn for Phase I will be approximately 70 vehicles per day. Volumn will use currently unimproved Timberline Road and to a lesser degree Hoffman Mill Road. Vehicle Ty ems: Most of volumn noted is loaded and unloaded construction vehicles with loads up to 14,000 lbs. per axle. Improvements of Streets, Curbs, and Walks: The nature of current land use and vehicle types indicate that improvement of Hoffman Mill Circle along with any on -site paving is not appropriate. Also, improvements of Timberline Road will be jepordised if proper precautions are not taken to address current site activities. A joint agreement for temporary haul road alongside proposed Timberline improvements is recommended. Shiloh, Inc. Technical. Consultants April 15, 1985 City of Fort Collins P.O. Box 580 Fort Collins, Co. 80522 Attn: Bonnie Tripoli Re: Cache La Poudre Industrial Park Project #010-005 Dear Bonnie: As a result of discussions to date regarding the Cache La Poudre Industrial Park submittal we are hereby submitting a request for variance to the City "Off -Site Street Improvement" requirements for the subject project. This request reflects the owners present need to only make improvements to the site as are incidental to the present use, which is gravel extraction. These improvements are as detailed on the submitted "Site Development Plan & Preliminary Plat". It shall be the owner's intent to submit only the following major documents at this time for the project: 1) Master Plar�; 2) Site Development Plan & Preliminary Plat for Lot #1; 3) Development Agreement; 4) Filing Plat; 5) Master Traffic Impact Study; cl Preliminary Master Drainage Report. Reclamation of the entire site will be completed in conformance with the approved Master Plan and at the time of actual future development of the project the owner will submit documentation as is normally required for land development within the City. The Filing Plat to be submitted for this phase of the project will reflect the total outer boundary of ownership, Lot # 1 and dedication of the rights -of -way for Timberline Road, Hoffman Mill Road to the western property line and Hoffman Mill Road to the eastern limit of Lot #i. As a concession for the variance the owners agree to dedicate the streets as mentioned above and abide by the terms of the Development Agreement which will detail future outlet of major storm basin drainage through the project's lake system to the Spring Creek drainageway. Please be aware that the revised submittal package which was delivered to Elaine Kleckner last week contained a letter outlining concerns of the owners regarding details of the off -site storm drainage as requested by Bob Smith. It was Bob's intent to use this information to formulate that portion of the Development Agreement. If you have any questions or comments please do not hesitate to contact me. Sincerely, E_A_ - Richard E. Mattingly Project Manager cc - Mr. Marvin Kercher, Mobile Premix, Inc. 211 W. Myrtle Fort Collins, CO 80521 (303) 482-1557 Shiloh, Inc. Technical Consultants April 16, 1985 City of Fort Collins P.O. Box 580 Fort Collins, Co. 80522 Attn: Bonnie Tripoli Re: Cache La Poudre Industrial Park Project # 010-005 Dear Bonnie: This letter is being written to inform you of Mobile Premix's desire to pursue tax exempt status for the four lakes and associated wildlife habitat areas as indicated on the submitted Master Plan for the Cache La Poudre Industrial Park. The potential of tax exempting these areas of the project was discussed at separate meetings with Storm Drainage and Natural Resources. The Storm Drainage Department expressed their interest in supporting tax exempt status for the two southern lakes and the northwest lake in association with major storm drainage basin improvements. The Natural Resources Department and Colorado Division of Wildlife expressed interest in supporting tax exempt status for all lakes and wildlife habitat areas for wildlife refuge. Please let us know the process required to investigate this potential further. Sincerely, C_- Richard E. Mattingly Project Manager cc — Mr. Marvin Kercher, Mobile Premix, Inc. 211 W. Myrtle Fort Collins, CO 80521 (303) 482-1557