HomeMy WebLinkAboutCENTRE FOR ADVANCED TECHNOLOGY PUD SIXTEENTH - Filed CS-COMMENT SHEETS - 2003-05-28Aces
July 24, 1993
Mr. Bruce Darden
Roth -Sheppard -Pasqua Architects
2185 Broadway
Denver, CO 80205
Dear Mr. Darden: ,
The Planning Department has coordinated an interdepartmental review
of the Cinema Savers 6-Plex Theatre at the Centre for Advanced
Technology, Preliminary P.U.D. The following comments are offered:
1. The City of Fort Collins Stormwater Utility will be providing
comments to the consulting engineer for the project under separate
cover. The client/developer should be aware that the materials
submitted did not meet the requirements of the Stormwater Utility.
Specifically, the preliminary drainage information does not
demonstrate that the proposed development is consistent with the
drainage and detention requirements that will be imposed on the
site.
2. This particular filing represents the 16th Filing, not the
15th Filing as indicated.
3. The Public Service Company will require that, at the time of
Final Plat, an eight foot wide utility easement be dedicated
adjoining the westerly right-of-way line of Worthington Circle.
Planting of trees must be closely coordinated with PSCo so that
trees are not located within four feet of any gas line.
4. The Poudre Fire Authority will require an automatic fire
extinguishing system which must be supplied by a fire sprinkler
service line. This line should be indicated on the Utility Plans.
5. At the time of Final Plat, the fire access roadways must be
dedicated as emergency access drives.
6. The City of Fort Transportation Department has not yet
completed its review of the traffic impact analysis. An initial
comment, however, is that Worthington Circle will have to connect
to Worthington Avenue in order to distribute the traffic.
Additional comments regarding the traffic issues will be
forthcoming as; soon as they become available. (It is anticipated
that a discussion on the participation of users in Tract R in the
construction of Centre Avenue from Research to Prospect Road will
281 North College Avenue • l'.O. Flov 580 • Fort Collins, CO 80522-0580 (3[1>) -'21-(,7;0
This concludes Staff comments at this time. In order to remain on
schedule for the November 15, 1993 Planning and Zoning Board
meeting, please note the following deadlines:
Plan revisions are due October 27, 1993.
P.M.T.'s, 10 prints, colored renderings are due Nov.8, 1993.
Prior to recording, the Planning Department will need final
documents of the Site Plan, Landscape Plan, Architectural
Elevations, Site and Landscape Covenants, Utility Plans, and
Development .Agreement. (Please be aware that the Stormwater
Utility will require an Erosion Control Bond prior to allowing work
to begin.)
As always, please do not hesitate to call our office to discuss
these comments.
Sincerely:
Ted Shepard
Senior Planner
xc: Sherry Albertson -Clark, Chief Planner
Kerrie Ashbeck, Civil Engineer
Encl.
have to take palace so that expectations are clearly communicated.)
7. As mentioned at Conceptual Review, the P.U.D. must demonstrate
a commitment to promote alternative forms of transportation
(walking and bicycling). A 10 foot wide, concrete path should be
constructed connecting the sidewalk system at the Drake/Shields
intersection to the front door area of the theatre. This will
provide a safe, convenient link to the large student population
residing in the apartments south of Drake Road.
8. The site ;lan should provide a larger area for bicycle parking
near the front entry. In order to truly promote alternative modes,
Staff feels the bicycle experience should be enhanced and not
considered an afterthought or subordinate to automobiles. For
these reasons, the bicycle parking area should be protected from
weather by an attractive, well -designed, enclosure. This enclosure
could be a detached "carport -like" structure or an attached roof or
overhang. Such an amenity will make a strong affirmative statement
that the City of Fort Collins and Cinema Savers sincerely promotes
alternatives to the automobile.
In addition, this area should feature bicycle racks that are
permanently anchored to concrete. The enclosed area should not
interfere with. other pedestrian walkways or drive aisles. The bike
parking area :should be safely illuminated and not be a dark zone.
This area should not be located in a remote area of the parking lot
but should be near the front entry for security purposes.
9. The site plan should label the handicap parking spaces with an
"H". Be sure all handicap parking spaces lead to the front entry
by ramps without interference from cars in the parking lot.
10. The data table should indicate how many total seats in the
building. The number of parking spaces should then be stated as a
ratio to the number of seats. For example, if there are 1,200
seats and 250 parking spaces, then the ratio is one parking space
per 4.8 seats.
11. A note should be provided on the site plan that the available
parking spaces are to be shared with the balance of the retail
center during times when movies are not being shown. Please
include the probable times that movies will be shown on a weekday
and weekend basis. It is expected that the Tract R retail center
will feature :internal cross -access easements among all users.
12. The site plan should indicate the number of parking spaces per
bay.
12. The building envelope should indicate emergency exit
locations.
13. In general, the landscape plan needs to enhanced to mitigate
the large asphalt area and the mass and scale of the building. The
following comments apply to the landscape plan:
A. The Davis, property should be provided with a stronger buffer
from the parking lot. This would include a berm at a minimum of
four feet to screen headlights with a generous amount of coniferous
plant material for visual and acoustic massing. Our latest
communication with Mrs. Davis is that she is a long term resident
and does not plan on selling out to the retail developer.
B. The parking bay on the far southwest property line is totally
unscreened. This area should feature a landscaped area running the
total length so that the headlights and glare are minimized. It is
conceivable that these 18 spaces could become one-half of a future
island with parking opposite that serves the future retail center.
Perhaps the landscaping for these 18 spaces could be provided
"offsite" with. the benefit of an easement from the landowner. Also
these 18 spaces should be broken up with a landscaped island at the
midpoint of the bay..
C. The adjacent parking bay to the northeast should also be
broken up with an island that is 38 feet long (two stall lengths).
Such an island should feature two shade trees and enough shrubs to
cover at the time of maturity.
D. Again, moving to the next parking bay to the northeast, a
landscape island must be provided to break up the long row of
parked cars.
E. Where the continuous island is provided, this area should be
treated with a row of shade trees rather than just the three as
indicated. With 270 feet of length, this area should be treated
with a sufficient amount of deciduous shade trees to create a
canopy effect.,
F. Landscaping should be provided around all sides of the
building to soften the mass and scale of the structure. The blank
southeast wall is unacceptable.
G. Along the Worthington Circle streetscape, two more deciduous
shade trees should be provided on the northwest side of the main
accces point for a total of five.
14. The parking lot does not appear to have efficient access
points. For example, the parking lot's westerly access point by
the tune-up shop does not appear to line up with either of the
drive aisles. Also, has any consideration been given to providing
another access to the C.A.T. 10th P.U.D. between the tune-up shop
and the future retail building? Similarly, the access point on
Worthington Circle located at the far southeast corner looks as if
it is designed for one-way inbound traffic. Is this the case?
While the main access point appears clear, the other points appear
vague or improperly designed. Please give some thought to how
traffic will disperse from the parking lot and onto the street
network.
15. The site plan should indicate dimensions of the building
envelope and setbacks from adjacent property lines.
16. Staff is very concerned about the boxiness of the structure.
In particular, the northeast and southeast elevations are very
boring and provide no relief from the long monotonous lines. The
one horizontal. band appears inadequate to mitigate mass, scale and
height of the building.
Staff recommends that a brick band be added around the base add
color and texture to the structure. This band could be eight feet
in height. The columns on the northwest and southwest elevations
could be brick to match this band. Additional horizontal reveals
could use brick as an accent. Has any consideration been given to
the use of color within the precast concrete or concrete block?
Examples abound of these materials using a color to soften the
appearance of the structure.
17. Has any consideration been given to adding variety to the
roofline? Will there be screen walls or a parapet wall to hide the
H.V.A.C. equipment? Has any consideration been given to create a
more dramatic entry? Is there sufficient queing area? Does the
queing area offer protection from inclement weather? Will the exit
doors just be a plain metal door that is flush with the exterior
wall?
In general, the building lacks angulation, curves, fenestration,
insets, reveals, arched (or detailed) exit doors or other features
that make the building more aesthetic and interesting. It is
Staff's expectation that the building will be upgraded to reflect
the quality found in the C.A.T.
18. Staff is; very concerned about lighting and illumination
spillage. The parking lot pole -mounted lights should not exceed 20
feet in height and feature down directional, 90 degree cutoff
luminaries. Building mounted lighting must also be down
directional and not cast illumination outwards. It is our
experience that high pressure sodium is a vastly preferable light
source than mercury vapor. High pressure sodium is more efficient
over the long run and casts a more pleasing, softer light with no
loss of illumination. At the time of Final P.U.D., Staff will
require the developer to provide specification sheets on exterior
lighting fixtures.
19. The site plan should contain a vicinity map, and the title
should be placed in the lower right hand corner. Please add a
legal description (C.A.T. 16th Filing) and reference quarter
section, section, range, township, city, county, and state.
20. The site plan should indicate the probable location of the
trash enclosure, transformer, and all handicap ramps.
21. The architectural elevations should include the location and
dimensions of flush wall signs.
22. The site plan should indicate the zoning and surrounding land
uses of the adjacent properties.
23. Please add the following notes to the P.U.D. Site Plan:
A. Building to be equipped with an approved, automatic fire
extinguishing system meeting the requirement of the Poudre
Fire Authority.
B. Refer to Subdivision Plat and Utility Plans for locations of
all easements, utilities and stormwater detention areas.
C. Handicap access ramps to be provided at all street and
driveway intersections in accordance with City of Fort Collins
standards.
D. Maintenance of all drives, islands, and open space to be the
responsibility of the owner.
E. All rooftop mechanical equipment will be totally screened.
F. All signs to comply with City Sign Code unless specific
variances are granted by the Zoning Board of Appeals. Onsite
directional signage shall contain no reference to advertising,
logo, trademark, symbol, or other commercial message and shall
not exceed four square feet.
G. Exterior lighting, both pole mounted and building mounted,
shall feature down directional, sharp cutoff luminaries.
H. Trash enclosure to be mounted on concrete and be constructed
of materials to match the building's exterior. One side shall
be a solid gate.
This concludes Staff comments at this time. Please note the
following deadlines for the August 23, 1993 Planning and Zoning
Board meeting:
Plan revisions are due Thursday, August 5, 1993
P.M.T.Is, 10 prints, and colored renderings are due Aug. 16th.
As always, please feel free to call our office to discuss these
comments or to arrange a meeting to discuss the issues in depth.
Sincerely:
Ted Shepard
Senior Planner
xc: Sherry Albertson -Clark, Chief Planner
Kerrie Ashbeck, Civil Engineer
Community Planning and Environmental Services
Planning Department
City of Fort Collins
October 18, 1.993
Mr. Bruce Darden
Roth Sheppard Pasqua Architects
2185 Broadway
Denver, CO 80205
Dear Bruce:
Staff has conducted its interdepartmental review for Cinema Savers
Final P.U.D., Centre for Advanced Technology, 16th Filing. The
following comments are offered:
1. The proposed location of the electrical transformer presents
problems, for the Light and Power Department. Since it is not
accessible from one side by hard surface, landscape materials
will be destroyed during a change -out operation. It is not
the policy of the utility to replace damaged landscaped
materials. Further, maneuvering around landscaping could
delay change -out during an emergency situation. Therefore, it
is strongly recommended that the transformer be relocated so
that it is within eight feet of hard surface.
2. As mentioned at conceptual review, transformers must be
screened. from public view. This can be accomplished by solid
wall screening that meets minimum clearances or by landscape
materials. If using a solid wall, the exterior must match
that of the building and a swinging gate should be provided.
If using landscaping, one side should be left open for access.
3. Development of this parcel will require an offsite drainage
easement.. This requires a separate deed of dedication that
must be presented to the City and is then recorded with the
Larimer County Clerk and Recorder. Or, if the owner of the
property on which the drainage easement sits signs off on the
subdivision plat, then a separate deed of dedication, with
separate legal description, will not be necessary.
4. The Utility Plans will require more detail on driveway design
including dimensions, curve data, etc.
5. The Utility Plans should address whether or not offsite
grading is necessary in order to transition the Worthington
Circle improvements smoothly into the existing ground adjacent
to the site on the northeast side.
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750
6. Sidewalks must be provided with ramps at street and driveway
intersections. These ramps should be indicated on the Site
Plan.
7. It has been our understanding that the Everitt Companies and
Cinema Savers would cooperate to provide a pedestrian access
path connecting the Drake/Shields intersection with the front
entry and bike rack area of the theatre. This path must be
shown on the site plan. It should be eight feet wide and
constructed of concrete. It may be noted on the plans that
this path is considered temporary and may be relocated or
shifted (but not deleted) depending upon future development
within the center. This path should have ramps where
necessary. It is suggested that a handicap parking stall be
placed on the southwest row of parking so its ramp can double
as a ramp for the path and enhance the connection to the front
entry.
The design of the path should be specified on the Utility
Plans. An easement should be provided for the path and shown
on the plat. As with the offsite drainage easement, if the
Everitt Companies signs off on the plat, then a separate deed
of dedication for the easement will not be necessary. This
path is considered to be a critical component of the
transportation network.
8. Similarly, there has been a verbal commitment from the Everitt
Companies to provide a vehicular access from the center into
the east. side of the Davis property. At this point, it is not
clear where this access point will be located and how it fits
into the circulation system. Nor is it clear if the
construction will be tied to development of this property.
These issues must be resolved and any improvements must be
shown on the Site Plan. Finally, the timing of the connection
must be established. Will the connection be constructed as
part of Cinema Savers or to be completed at a future date?
9. Staff is concerned about the lack of detail regarding exterior
lighting of the building and parking lot. Note H is a good
start. What is lacking, however, is a detail on the height of
the fixtures and the type of lamps. As mentioned in previous
correspondence, the Planning Department is concerned about
illumination and the potential of offsite intrusion. As a
result, the fixtures should be described in more detail.
Specification sheets from the manufacturer for both the pole -
mounted and building -mounted fixtures must be provided. Staff
has also requested that lamps be high pressure sodium versus
mercury vapor or metal halide. The wattage should also be
specified.
10. The following comments apply to the Landscape Plan:
A. There is one street tree on the northwest side of the
main entry drive that conflicts with a proposed
streetlight. This tree should be replaced with an
ornamental tree which may be allowed to be planted within
15 feet of the fixture. This tree is illustrated on an
attachment to this letter. I�_ is recommended that a crab
tree be planted in this location to help fill in the gap.
The Spring Snow, Radiant, Indian Magic, or Prairie Fire
are suggested as species that do well in our climate.
B. The revised Landscape Plan should indicate screening
material for the gas meter on the east side of the
building and the treatment around the relocated
electrical transformer.
C. Note Five is a concern to Staff. The issue is the timing
of future development in the center which could then
buffer the parking lot from the Davis property. Staff is
concerned that the timing of such future development is
very uncertain. Given that the landscaping along the
Davis property line will add value to the center as a
whole, regardless of the timing or extent of future
development, it should be installed upon completion of
the building. The greater the maturity of this plant
material, the more effective the screening for future
development within the center. Consequently, this note
should be deleted.
D. Similarly, Note Six is also a concern. It is unclear as
to why landscape materials designed to buffer the
building are not needed to be installed upon completion
of -the building. The Planning Department is not aware of
any impending development in the center that would
effectively screen this wall. Since there is such
uncertainty as to timing and extent of . future
development, this imposing wall will need to be screened,
regardless of what occurs to the east and at what time.
The timing of development to the east does not change the
fact that this area needs treatment. Consequently, Note
Six should be deleted.
E. Based on the above two comments, Staff expects all
landscaping shown on the Landscape Plan to be installed
in conjunction with the request for certificate of
occupancy. If there are weather delays, or unexpected
delays and the installation of landscaping requires a
little extra time to be completed, then the developer can
secure the uninstalled landscaping with a financial
instrument. The intent is to allow flexibility based on
unanticipated construction delays, not to postpone
landscaping into future growing seasons. In order to
clarify this intent, please add the following note to the
Landscape Plan:
"All landscaping must be installed prior to
certificate of occupancy or secured with cash,
irrevocable letter of credit, escrow, or
performance bond for 125% of the valuation of the
plant material. Such financial instrument may not
be used to postpone landscaping installation for a
period of greater than 30 days."
F. Staff is concerned about the loss of berming along
Worthington Circle. The Preliminary Landscape Plan
indicates three distinct berms northwest of the access
drive/Worthington Circle intersection and one longer
continuous berm southeast of the intersection. These
berms provide strong visual relief from the large parking
lot and will help screen headlights. These berms should
be reinstated and indicated on the Final Landscape Plan.
11. It will be recalled that the Preliminary P.U.D. contained a
condition of approval addressing the architectural concerns.
Condition Number Two asked that the architectural elevations
be enhanced so that there is less reliance on gray -toned
concrete block. This could be in the form of color, texture,
shape, or any other distinguishing characteristic. The final
submittal did not contain any architectural elevations or any
indication as to how this condition of approval has been met.
Such information should be provided.
12. Be sure to include signage information on the elevations.
13. The Site Plan should indicate that the double loaded parking
lot drive aisles are 24 feet in width.
14. Handicap and Compact parking stalls must be provided a raised
identification sign. This could be an issue where handicap
stalls face the sidewalk. Unless sleeves are installed while
the sidewalk is being poured, it will be difficult to provide
the proper signage.
15. Be sure to label the Site Plan as Sheet 1 of 3, the Landscape
Plan as Sheet 2 of 3 and the Elevations as Sheet 3 of 3.
16. The title of the P.U.D. should appear in the lower right
corner of all sheets.
17. The Site Plan should contain an ownership statement and
signature block with a notarial block for the ownership
signature. The Site Plan should also contain a Planning and
Zoning Board approval block.
18. The vicinity map should indicate the location of the subject
site as well as provide a north arrow. Also, please label
Centre Avenue and Shields Street.
19. The Site Plan must be submitted on 24" x 36" sheets.