HomeMy WebLinkAboutBMC WEST PUD - Filed GC-GENERAL CORRESPONDENCE - 2003-05-28January 22, 1996
Planning and Zoning Board Members
RWLEY ASSOCIATES
C/O Mike Ludwig
Planning Department
Landscape Architecture
281 North College Avenue
Urban Design
Fort Collins, CO 80524
Planning
223 Jefferson Street
Suite A
Fort Collins, Colorado 80524
RE: Planning Objectives for:
PHONE (970) 224-5828
FAX (970) 224-2956
BMC West P.U.D. Preliminary/Final P.U.D.
BMC West, Inc. is a building supply company with 52 retail building material centers in 11
western states including one located east of Timberline Road and north of Prospect Road in Fort
Collins. The company also operates 25 pre -hung door manufacturing facilities. The local BMC
West currently leases space at another location for the door manufacturing part of the business.
BMC West P.U.D. is a proposal for a 43,756 square foot building to house a manufacturing and
assembly shop for pre -hung doors. The facility is intended as a manufacturing business and not
a retail store. The proposed site is located just north of their existing building material center.
BMC West currently employs 47 people at their existing center on Prospect Road and 17 people
are employed at their existing door manufacturing operation.
In addition, the applicant is seeking approval for changes to the architecture of the existing
buildings on Prospect Road which were part of Prospect -Timberline P.U.D. The architectural
changes are intended to update the existing buildings, improve the visual appearance and create
architectural compatibility between the existing buildings and the new manufacturing facility.
The site slopes from the west to east at less than one percent. Existing vegetation on the site
consists of Russian Olive trees and other small trees and shrubs. Surrounding land uses include
undeveloped property to the north, Spring Creek and Seven Lakes Business Park to the east, Bath
Landscape Nursery to the west and undeveloped property to the south across Prospect Road.
The proposed project scores 56% on Point Chart F - Industrial Uses, gaining points for being
adjacent to an arterial street and for utilizing energy conservation measures beyond those normally
required.
Planning objectives for the property include:
Development of approximately 45,000 square feet of warehouse space.
Development of truck loading docks accessible to semi -trailer trucks.
Dave Osborn
December 23, 1997
Page 2
Place geote.Ytile fabric and topsoil
Revegetate disturbed areas and maintain until established
The present value, estimated cost for erosion mitigation based on a contractor estimate is $4500. It is assumed
that this cost wi11 be shared by the City of Fort Collins and distributed based on the percent runoff as discussed
above. In this instance BMC West may be responsible for 36% of the total cost which is $1620.
The attached figure shows the section of the drainage channel which the City of Fort Collins and BMC West
would share erosion mitigation costs.
If you have any questions or require further information please call.
Sincerely,
WESTEC, Inc
Start Engineer
A.G.W.
cc: Mr. Jim Paske, BMC West
Mrs. Basil Hamden, City of Fort Collins Storm Water Department
tars'. Slieri Wrunhoff, City of Fort Collins Engineering Department
o
�w v
z � �
z waa ♦
poaa
a aa-°h
� 3 aar � �♦
rwr J
oow wa
mm�
O
I \z- \
�n %<�
�uj
/
jli6Voz
Lj
1z �w
` o xLn
AP
z J o�•..,4--j
i
n Jr
� �..}} Job Zl
� 1 U a QS Q Ul ��
\ — — — — — — — — — \
JNI8J
�IYlll ov---------- -- \
�.. o
ZI-Z IV IN
o
,/0 ,,10,y o �0
` I \ rogy
I x �— *08*
TN �} \
v o s \
II I l O
1 r
IZ
Ln
tl �
.} _ l b _ X ♦ �i�, ki
�" I I t � __r�r`�`r r�•x��r- �Y .rcv } K `.f� - ,� 7.n�. }•� ,r P a, �+s'
I ,� P t � �. � �.. $ t .�� h � '."�` r�K v r ♦ k � r ' � � t}i � " �i�-s .k -4�
i � � � � ;� ,.l '-.. ,�, ry,o� <' + Y �•,.�ro��* �,`-+s � r y �.�L _ � 1y'�3 tpis '-, b� .ti"
`" I �� n t� -a, M Y• 2 Y.;�...��- aye Ya'�Q 1��. �p i �y
I� ^.,i O°'3fi�, ; j �"�i wx '� ♦4°y,-4'.r Ft.�y w'_ i ♦`�� 0:� ,�'�s "'
w-R t
� I � � r't I J �ra .,gar �-, r "8'� n 'tW`$.� �" v. -0• +� `"tf ♦ 3� � J '
I �,Y+ ;� � l' it;`<•,� .r w-s��5 �r S 3wa r."k #?� ae ..� u�`'�i.Y ♦ � i;�
'. I I I �3 �• �,JgWp,,�n,.�i��0}�4{�' �y `� i x /�'�'; '_s _�Y..* �a}Z p -_ ";�`'
- � Q Of•+ s.-• y y �.
x 14x'
o1 0a a a> tr n
O
5 r,F4 f.
I I at I :� I � �� f �x '�'"' �'"c" '�5�'`�c• � 1 b��f s �+,. ^�� xti s ti'tt •£"�r iv`}' �+.i� ' 4 � ���.
T, ` 044
I � u�
OSBORN & BLOOM
PROFESSIONAL CORPORATION
ATTORNEYS AT LAW
217 WEST OLIVE
DAVID L. OSBORN P.O. BOX 2003
CHARLES S. BLOOM FORT COLLINS, COLORADO 80522
December 30, 1998
VIA FACSIMILE NO. 221-6378
Ms. Sherri Wamhoff
Planning and Zoning Engineering Development Approvals
281 North College Avenue
Fort Collins, CO 80522
Re: BMC West P.U.D.
Dear Sherri:
PHONE (970) 484-2928
FACSIMILE (970) 484-2620
In trying to finalize my files, I am trying to get recorded copies of all of the documents
we have generated with respect to this transaction. My records reflect that I delivered to Ron
Mills on January 23. 1998, a Deed of Dedication and a Non -Exclusive Dedication. Both of those
documents required signatures. In that correspondence, a copy of which is enclosed herewith. I
asked Ron to return to me a copy of each document after they had been executed by the City and
recorded. To date I have not received those documents.
We have also previously furnished to you a Development Agreement, a copy of which is
also enclosed. Thal. Development Agreement also required the signature of a City official and
was to be recorded. Would you please furnish to me for my file copies of all of the aforesaid
documents after they were duly recorded, as well as a copy of the final Plat.
The BMC Home Office desires to try to get these documents before year end, and I
would appreciate your expeditious cooperation in returning copies of same to me.
Very truly yours,
OSBORN & BLOOM, P.C.
DLO:pas David L. Osborn `V!/
(Dictated but not reviewed)
Enclosures
xc: Mr. Ron Mills
Mr. Jim Pask
Moffatt Thomas - Attention: Jo Ellen
RIPLEY ASSOCIATES
Planning Objectives - BMC V, P.U.D.
January 22, 1996
Page 2
■ Development of parking area for approximately 30 employees.
■ Development of attractive buildings that are architecturally compatible with each other.
■ Development of a well landscaped street frontage that presents a positive image to the
community.
■ Development of a landscape buffer between the manufacturing facility and the Spring
Creek bike trail.
City land use policies that support the proposed development include:
22. Preferential consideration shall be given to urban development proposals which are
contiguous to existing development within the city limits or consistent with the phasing
plan for the City's urban growth area
60. Industrial uses should locate near transportation facilities that offer the required access to
the industry without creating demands that exceed the capacity of the existing
transportation network.
61. Industrial development should locate where the proper sizing of facilities such as water,
sewer and transportation has occurred or is planned.
Thank you for ,your consideration, and we look forward to working with you during the
development review process.
Sincerely,
RIPLEY ASSOCIATES
Linda Ripley
Principal
Transpoi ion Services
Engineering Department
City of Fort Collins
September 19, 1996
Edward Berlier P.L.S.
Land Surveyors of Colorado
526 24th Street
Greeley, CO 80613
Dear Ed:
During our telephone conservation of a few weeks ago, you and I
discussed your, concern with the position of the West Quarter Corner
of Section 17 Township 7 North Range 68 West. I mentioned to you
that I had found some evidence that indicated the corner, as
monumented, is in it's correct position. I also indicated a survey
to verify this position was underway. Also, I was aware of another
survey being done by Dan Wilkins, P.L.S., of TST, Inc., in Section
17 and Section 18, with the results of that survey either verifying
or refuting the current corner position.
The key pieces of documentation that I have discovered, as well as
the field work. performed by the City survey crews, all verify that
the corner as, monumented is acceptable in its current position.
Dan Wilkins also found no problem with the corner during his
survey. For your review, I have enclosed copies of plats from the
City's files, as well as, other evidence I uncovered, along with a
copy of our field measurements. Also enclosed with Dan Wilkins
permission is a copy of his survey.
The recently completed topo survey for the proposed Timberline Road
project, found the back of the existing sidewalk along the west
side of the :Plat of Prospect Timberline P.U.D. to be parallel
(within 0.101) with the existing right of way of Timberline Road.
The existing sidewalk only extends some 450' north of Prospect
Road, but it appears it was built using the existing position of
the quarter corner.
Please review the enclosures and contact me if you have any further
questions. :C will be glad to meet with you and discuss your
concerns regarding the quarter corner's position.
Sincerely,
Wallace C. Muscott, PLS
Chief Surveyor
enclosures
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605
Jan-21-97 08:04A LAND SURVEYORS OF COLO 1-970-352-1750 P.01
LAND SURVEYORS OF COLORADO
526 lath 5trect Phone: 303.356.9712 Greeley
Greeley, Colorado 80631 303.493.4123 I.arimer County
303-352-1750 Fax
January 20, 1997
City of Fort Collins
Engineering Department
P.O. Box 580
Fort Collins, Colorado 80522
Attn: Ms. Sheri Wamhoff
Mr. Wallace C. Muscott, P.L.S.
Dear Ms. Wamhoff;
We are in receipt of your fax to Mr. Jim Pask, BMC West Corporation,
dated January 9, 1997. We are disappointed to see the issue of the
conflict in the location of the West Quarter corner of section 17
raised at this late stage, You will recall we had a meeting at which
all parties of this platting process were present and this matter was
not brought to our attention at that time, nor has it ever surfaced
as a condition of approval. Mr. Muscott's letter September 19, 1996
was not about this platting process, but a response to my request
that the City :remove a monument that was not consistent with existing
platted subdivisions and was related to other survey work we were
doing at the time. However, as always, we are interested in meeting
your needs and lultimately gaining approval of our client's project.
To give you some background, I contacted Mr. Muscott and advised him
that the West Quarter corner the City had recently set was in
conflict with the existing subdivision plats of Seven Lakes Business
Park P.U.D., and Prospect -Timberline P.U.D. At that time, I asked
him to remove the monument placed by the City and resolve the
conflict. Mr. Muscott was advised that the original monumentation
was still in place for those subdivisions. We requested that he
locate that monumentation and thereby recognize the conflict the City
monument was creating. To my knowledge, he has not done that or
recognized the conflict. Mr. Muscott has relied upon a 1974 survey
by Gary L. Boyack in which Mr. Boyack considers the West Quarter
corner to be "lost", while others considered there to be sufficient
evidence to re-establish the corner and considered it to be
"obliterated". The City monument is consistent with the survey of
Mr. Boyack. Mr. Muscott has relayed to me by phone that both Mr.
Richard A. Rutherford, who prepared the plat of Prospect -Timberline
P.U.D., and Mr. Larry G. Intermill, who prepared the plat of Seven
Lakes Business Park P.U.D., have recanted the certifications on those
plats and acknowledge fraudulent surveys in which they both, did not
locate the aliquot corners they indicate on their plats. Therefore,
Mr. Muscott states, those plats can not be relied upon. That would
be an interesting position before the Board of Registration for
Professional Engineers and Professional Land Surveyors and I
seriously doubt that it is their position.
The bottom line is the City is not willing to back off their position
for the West Quarter corner and have apparently made acceptance and
Jan-21-97 08:04A LAND SURVEYORS OF COLO 1-970-352-1750 P.02
use of the City monument a condition of approval for the BMC West
plat. I am required by statute and standards of practice to "follow
in the footsteps of the original surveyor" and would ordinarily
establish the West Quarter corner in the manner which I did. If it
is a condition of approval that I accept and use the West Quarter
corner established by the City, please forward that requirement in
writing by memo, letter, or fax. We need the requirement in writing
so that we may keep a copy in our files in the event a complaint
against me, about the corner arrises with the Board of Registration.
I am sure Mr. Muscott will recognize and understand the need for the
supporting information. Our fax number is 970-352-1750 and our
mailing address is shown on the letter head. Upon receipt of that
requirement, we will comply and modify our plat for final submittal.
So there are no surprises upon submittal, please be aware the
following will show on that plat as required by statute:
1. The conflicting location of the West Quarter corner based upon
the plats of Prospect -Timberline P.U.D. and Seven Lakes Business
Park P.U.D., will be shown as required by C.R.S. 38-51-106 (k).
However no monument will be set or shown at that location.
2. The Northerly, Southerly and Easterly lines of subject property
will remain as shown as their position is fixed by the position
of original monumentation of the above captioned plats and by
deeds of record. The Northerly and Southerly lines of subject
property will be truncated by the change in the West line of the
southwest Quarter of section 17. The truncation will amount to
V t A slight decrease in the area will occur. The building
envelope will not change with respect to the Northerly and
Easterly Lines of subject property.
3. Conflicting data along the Westerly, Southerly, and Northerly
lines of subject property will be shown as a result of using the
City monument per C.R.S. 38-51-106 (k).
4. Easements will be adjusted to accommodate the City monument.
Again, we are disappointed that this matter was not brought up last
summer, in September when Mr. Muscott wrote his letter, or at our
last meeting with you and others. To avoid further delays, please
contact me immediately if you foresee any problems with the
modification or the requirement in writing as outlined herein_ we
are very interested in resolving this conflict and moving forward.
Thank you for your cooperation and understanding in assisting us and
BMC west with this project.
Sincerely,
ard L. Berizer, P.L.S.
ELB/kb
cc: Mr. Jim Pask
Transpoi _ .cion Services
Engineering Department
City of Fort Collins
January 23, 1997
Edward Berlier P.L.S.
Land Surveyors of Colorado
526 24th Street
Greeley, CO 80613
Dear Mr. Berlier:
I have received your fax letter dated January 20, 1997. Since my
letter of September 19, 1996 I have not found or been given any
additional evidence that would indicate to me that the current
monumented position for the west quarter corner of Section 17
Township 7 North Range 68 West is in error.
If the City accepted your Subdivision Plat of BMC West P.U.D. as
submitted, I feel we would acknowledge that we accept your location
for the corner, in question. As we are in the middle of designing
the Timberline Road extension through this immediate area, the
position of the corner is very critical to this design. I have no
interest in delaying the proposed subdivision plat other than the
fact if improvements were built based upon your position for the
corner, they may be built in the City Right of Way or not satisfy
set back requirements.
I have no reason to doubt the findings of your survey in which
existing subdivision monuments were found that led you to believe
the quarter corner is in a wrong position. As I said in my
September 19 letter, the results of my survey have found that the
corner is located as monumented in 1974 by Gary Boyack. The two
subdivision plats you have referred to, Prospect -Timberline P.U.D.
and Seven Lakes Business Park P.U.D. were platted four years and
eight years respectively after the corner was set by Mr. Boyack.
I also deny saying that Mr. Rutherford and Mr. Intermill, the
surveyors of those two subdivision plats "have recanted the
certificates on those plats and acknowledged fraudulent surveys."
Yes, we as surveyors are to "follow in the footsteps of the
original surveyor," and to the best of my knowledge, Mr. Boyack did
that in 1974. In your letter you refer to "others" considering the
corner as an obliterated corner. I am not sure who you refer to as
"others."
Another thing I have learned since my letter of September 19, and
this is only verbal statements from some of the current City
employees that were working for the City during the mid 1980's, is
that they remember a problem with the southwest corner of Section
17. Apparently, there was for a short time another monument near
the correct monument. A meeting was held during the mid 1980's
among the effected surveyors (I do not know who that was), and the
current position that matches the Boyack survey of 1974 was agreed
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605
upon as the correct corner. Again this is only remembrances and not
hard evidence, but it could have some bearing on the problem
locating the west quarter corner, as the two plats were filed
during this time period.
Recently I was asked to give a final check of your subdivision plat
of BMC West P.U.D. (this is standard procedure). I was so
concerned with the quarter corner location that I overlooked
checking to see if the comments I had made during my initial review
in March of 1996 had been addressed. The most recent copy of the
subdivision plat that I have, dated March 1, 1996, has not
addressed these few issues. My issues at that time were:
The plat does not close by North 36 degrees 41 minutes 34
seconds West 0.621 feet, 1 part in 5441.
The "subtitle" of the plat should say in addition to the
existing subtitle; A portion of which is a Replat of a portion
of Lot 1 Prospect -Timberline P.U.D., Being a ......
The additional easements located in Lot 1 Prospect -Timberline
P.U.D. to be dedicated, cannot be dedicated with this plat as
they are outside the outer boundary. They must be dedicated
by separate document, with that recording information shown on
this plat.
In addition to these comments, I know that Sheri Wamhoff, from our
development review section, has some comments that need to be
addressed. Please be advised of this and correct your subdivision
plat accordingly.
I will be glad to meet with you and discuss your concerns regarding
the quarter corner's position and the subdivision plat.
Sincerely,
Wallace C. Muscott, PLS
Chief Surveyor
CC: Ms. Sheri Wamhoff, CE1, City of Fort Collins
Mr. Jim Pask, BMC West Corporation
Transpo. don Services
Engineering Department
City of Fort Collins
January 27, 1997
Edward Berlier P.L.S.
Land Surveyors of Colorado
526 24th Street
Greeley, CO 80613
Dear Mr. Berlier:
Per our telephone conservation on Friday January 24, I agree a
point of clarification is needed.
Because I believe the correct location of the west quarter corner
of Section 17 Township 7 North Range 68 West was established in
1974 by Mr. Gary Boyack P.L.S. and is currently monumented by Mr.
Robert Bradshaw P.L.S., it is appropriate for you to use the
existing monument position to complete the proposed subdivision
plat of BMC West P.U.D.
In your letter dated January 20, 1997 you have outlined what your
acceptance of the existing corner will require you to do to satisfy
Colorado Statutes with regards to the proposed subdivision plat. I
understand and agree with your solution to the problem. In the
best interest, of the City, and your client, I believe your
acceptance of the corner as outlined by your letter will work for
all involved parties.
Sincerely,
Wallace C. Muscott, PLS
Chief Surveyor
CC: Ms. Sheri Wamhoff, CE1, City of Fort Collins
Mr. Jim Pask, BMC West Corporation
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605
"Ad — — — — — --- --
\1/ YV CZZO ■ C%.
December 23, 1997
Mr. Dave Osborn
Osborn & Bloom, P.C.
217 West Olive Street.
Fort Collins, Colorado 80521
RE: BMC West Development Agreement
Dear Mr. Osborn:
This letter is in reference to the BMC West Development Agreement, Special Conditions, Section II.C.4. As
discussed ui our meeting with City of Fort Collins representatives, this section shall be modified provide a more
detailed description of the north drainage channel and quantify the extent of mitigation liability for BNIC West.
The area of mitigation should be limited to the final 110 feet of drainage channel between the east property
boundary of BMC West P.U.D. and the confluence with Spring Creek.
The drainage channel was designed to handle stromwater runoff using criteria and guidelines provided by the
Citv of Fort Collins Storm Drainage Design Criteria and Construction Standards (1991). The following
erosion control measures where included in the drainage channel design.
• Minimize excavation to avoid disturbing established vegetation
• Place cutoff walls below grade in the bed of the channel to prevent head cutting from the
confluence W"Ith Spring Creek to the east property line of BNIC
• Geotextile fabric placed below top soil laver to prevent erosion and help establish vegetation
• Rip rap and filter placed at all designated discharge locations along the drainage channel
Runoff discharged to the north drainage channel originates from the proposed Timberline Road extension,
BMC West PUTD and property west of the BMC West development. Considering the 100 year design storm
the distribution of runoff from each area, as outlined in the BNIC West P.U.D., Final Drainage and Erosion
Control Report (WESTEC, October 1997), is approximately 70-5 Hs from the Timberline Road and propem,
to the west and approximately 39 cfs from the developed BMC West PLI). Under the design conditions runoff
from the BNIC West P.U.D. accounts for 36°0 of the total design flow in the north drainage channel at the east
property boundary.
The Development Agreement states that in the event of erosion problems downstream of the BNIC West PUD
development permanent nutwative measures to correct erosion shall be taken. For purposes of the agreement.
a cost estimate for corrective action is provided. In the worse case scenario total channel restoration may
include the folloxvine repair tasks.
Excavate debris
Replace tN%o rock cutoff walls
Provide, place and compact fill from an offsite source
2629 Redwing Road, S,,,,ite 200, Fort Collins, Colorado 80526-2879, P!), 970 226 3535 Fax 970 226 75
Reno Winnemucca Elko Fort Collins Tucson EnCe:.ocd
Nevada Nevada Nevada Colorado Arizona Col do